Keywords in job postings
How often words appear in open postings over time, and which companies and postings are behind them. Compare up to five.
Measures activity, not value. Not investment advice.
Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026; until then the change is the number of postings, without a percent.
Open postings mentioning each keyword, 28 May 2026 to 23 Nov 2026
Keywords
| Keyword | Open now | Change, 30 days | Highest |
|---|---|---|---|
| Liquid cooling Followed daily |
361 | up +360 – (No percent: tracking began less than 30 days ago) | 361 |
Behind “Liquid cooling”
Postings (364)
| Title | Company | Role | Location | First seen | Status |
|---|---|---|---|---|---|
| Thermal Manufacturing Engineer | Etched | Thermal & cooling Mid level | San Jose | Open | |
| Manufacturing Design Program Manager | Etched | Program & project management Mid level | San Jose | Open | |
| Platform Product Reliability | Etched | Test, quality & reliability Mid level | San Jose | Open | |
| Data Center Engineer | Etched | Data-centre infrastructure Mid level | San Jose | Open | |
| Optical Systems Engineer | Etched | Chip design (ASIC / RTL / verification / physical design) Mid level | San Jose | Open | |
| Mechanical / Thermal Intern | Etched | Thermal & cooling Intern | San Jose | Open | |
| Thermal Lab Lead | Etched | Thermal & cooling Senior | San Jose | Open | |
| Hardware Lab Manager | Cerebras Systems | Hardware & electrical engineering Manager | Sunnyvale, CA | Open | |
| Staff Cloud Capacity Planner | Cerebras Systems | Data-centre infrastructure Staff / principal | Sunnyvale, CA | Open | |
| Lead Engineer, Critical Facility Operations | Cerebras Systems | Data-centre infrastructure Senior | Remote (US) | Open | |
| BMS / EPMS Controls Lead | Cerebras Systems | Controls & instrumentation Senior | Remote (US) | Open | |
| Staff TPM - Datacenter Delivery (E2E) | Cerebras Systems | Data-centre infrastructure Staff / principal | Sunnyvale, CA; Remote (CAN); Remote (US); Finland | Open | |
| Cluster Datacenter Manager | Cerebras Systems | Data-centre infrastructure Manager | United States | Alabama | Open | |
| Regional Data Center Manager - Western Canada | Cerebras Systems | Data-centre infrastructure Manager | Vancouver, CAN | Open | |
| Regional Data Center Manager - Finland | Cerebras Systems | Data-centre infrastructure Manager | Sunnyvale, CA | Open | |
| Staff Technical Program Manager, Data Center New Product Introduction | Cerebras Systems | Data-centre infrastructure Staff / principal | Sunnyvale, CA; Remote (CAN); Remote (US) | Open | |
| Data Hall Build Lead | TensorWave | Software engineering Senior | Remote | Open | |
| Supply Chain Analyst | TensorWave | Supply chain & procurement Mid level | Las Vegas, Nevada | Open | |
| Data Hall Design Engineer | TensorWave | Mechanical engineering Mid level | Remote | Open | |
| Senior Technical Program Manager, Data Center Build and Design | TensorWave | Data-centre infrastructure Senior | Remote | Open | |
| Senior Manager, Technical Program Management, Data Center Build and Design | TensorWave | Data-centre infrastructure Manager | Remote | Open | |
| Data Center Manager - Future Opportunities | TensorWave | General applications (not a specific job) Manager | New Kensington, PA (Monroeville/Pittsburgh Area); Tucson, Arizona; Miami, Florida | Open | |
| Data Center Technician - Future Opportunities | TensorWave | General applications (not a specific job) Mid level | Tucson, Arizona; Miami, Florida; New Kensington, PA (Monroeville/Pittsburgh Area) | Open | |
| Delivery Manager, Capacity Programs | Baseten | Program & project management Manager | San Francisco | Open | |
| Site Acceptance Testing Technician | Crusoe | Manufacturing & production Mid level | Remote - US | Open |
Companies behind it
| Company | Open mentions | Change, 30 days |
|---|---|---|
| Amazon.Com Inc | 68 | – (Tracked for 3 days so far) |
| Super Micro Computer, Inc. | 52 | – (Tracked for 3 days so far) |
| Space Exploration Technologies Corp. | 31 | – (Tracked for 3 days so far) |
| Celestica, Inc. | 27 | – (Tracked for 3 days so far) |
| Nebius | 19 | – (Tracked for 5 days so far) |
| Etched | 12 | – (Tracked for 5 days so far) |
| Cerebras Systems | 11 | – (Tracked for 5 days so far) |
| Crusoe | 11 | – (Tracked for 5 days so far) |
| CoreWeave | 9 | – (Tracked for 5 days so far) |
| Lambda | 9 | – (Tracked for 5 days so far) |
| Anthropic | 9 | – (Tracked for 5 days so far) |
| Teradyne, Inc. | 8 | – (Tracked for 3 days so far) |
| TensorWave | 7 | – (Tracked for 5 days so far) |
| Ecolab, Inc. | 6 | – (Tracked for 3 days so far) |
| Hut 8 | 5 | – (Tracked for 5 days so far) |
| Graphcore | 5 | – (Tracked for 5 days so far) |
| Submer | 5 | – (Tracked for 5 days so far) |
| Cloudflare | 5 | – (Tracked for 5 days so far) |
| Tenstorrent | 4 | – (Tracked for 5 days so far) |
| MatX | 4 | – (Tracked for 5 days so far) |