Keywords in job postings
How often words appear in open postings over time, and which companies and postings are behind them. Compare up to five.
Measures activity, not value. Not investment advice.
Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026; until then the change is the number of postings, without a percent.
Open postings mentioning each keyword, 28 May 2026 to 23 Nov 2026
Keywords
| Keyword | Open now | Change, 30 days | Highest |
|---|---|---|---|
| nuclear safety Followed daily |
100 | up +100 | 100 |
Behind “nuclear safety”
Postings (101)
| Title | Company | Role | Location | First seen | Status |
|---|---|---|---|---|---|
| Nuclear Senior Assurance Analyst | NextEra Energy, Inc. | Finance & accounting Senior | Palo, IA, US, 52324 | Open | |
| Nuclear NextGen Operations | NextEra Energy, Inc. | Nuclear fission & fusion Mid level | Seabrook, NH, US, 03874 | Open | |
| Nuclear NextGen Operations | NextEra Energy, Inc. | Nuclear fission & fusion Mid level | Two Rivers, WI, US, 54241 | Open | |
| N Engineer II | NextEra Energy, Inc. | Software engineering Mid level | West Palm Beach, FL, US, 33407 | Open | |
| Senior Nuclear Safety Criticality Engineer | Lightbridge Corp. | Nuclear fission & fusion Senior | Remote | Open | |
| Quality Assurance Engineer | Lightbridge Corp. | Test, quality & reliability Mid level | Remote | Open | |
| Principal Quality Assurance Engineer | Lightbridge Corp. | Test, quality & reliability Staff / principal | Remote | Open | |
| Nuclear Facility Manager | Lightbridge Corp. | Facilities & construction Manager | Idaho Falls | Open | |
| Reactor Operator/Senior Reactor Operator | Deep Fission, Inc. | Nuclear fission & fusion Senior | Parsons, Kansas, United States | Open | |
| Senior Licensing Engineer | Standard Nuclear, Inc. | Legal, policy & compliance Senior | Oak Ridge, TN | Open | |
| Manager, Electrical / I&C Design - Perry Nuclear Power Plant | Vistra | Nuclear fission & fusion Manager | Perry, Ohio | Open | |
| Nuclear Regulatory Affairs Principal - Davis-Besse Nuclear Power Plant | Vistra | Legal, policy & compliance Staff / principal | Oak Harbor, Ohio | Open | |
| Reactor Operator | Antares | Nuclear fission & fusion Mid level | Idaho Falls | Open | |
| Senior/Staff Space Systems Electrical Engineer | Antares | Hardware & electrical engineering Staff / principal | Los Angeles | Open | |
| Senior Thermo-Mechanical Engineer, Heat Exchanger | Antares | Mechanical engineering Senior | Los Angeles | Open | |
| Thermo-Mechanical Engineer II, Heat Exchanger | Antares | Mechanical engineering Mid level | Los Angeles | Open | |
| Senior/Staff Nuclear Safety Analysis Engineer | Antares | Nuclear fission & fusion Staff / principal | Los Angeles | Open | |
| General Counsel | Antares | Legal, policy & compliance Mid level | Los Angeles | Open | |
| Nuclear Operations Engineer | Antares | Nuclear fission & fusion Mid level | Idaho Falls | Open | |
| Licensing Engineer | Antares | Nuclear fission & fusion Mid level | Idaho Falls | Open | |
| Summer 2027 Internship - Civil Engineering | General Matter | Facilities & construction Intern | Los Angeles, CA | Open | |
| Structural Dynamics Engineer | General Matter | Mechanical engineering Mid level | Los Angeles | Open | |
| Lead, Safety Basis | General Matter | Nuclear fission & fusion Senior | Los Angeles, CA | Open | |
| Integrated Safety Analysis Lead | General Matter | Nuclear fission & fusion Senior | Los Angeles, CA | Open | |
| Integrated Safety Analysis (ISA) Engineer | General Matter | Nuclear fission & fusion Mid level | Los Angeles, CA | Open |
Companies behind it
| Company | Open mentions | Change, 30 days |
|---|---|---|
| Valar Atomics | 29 | – (Tracked for 5 days so far) |
| BWX Technologies, Inc. | 22 | – (Tracked for 3 days so far) |
| Kairos Power | 8 | – (Tracked for 5 days so far) |
| Antares | 8 | – (Tracked for 5 days so far) |
| Oklo | 7 | – (Tracked for 5 days so far) |
| General Matter | 6 | – (Tracked for 5 days so far) |
| TerraPower | 5 | – (Tracked for 5 days so far) |
| Lightbridge Corp. | 4 | – (Tracked for 4 days so far) |
| NextEra Energy, Inc. | 4 | – (Tracked for 3 days so far) |
| Vistra | 2 | – (Tracked for 5 days so far) |
| Dominion Energy, Inc | 1 | – (Tracked for 3 days so far) |
| Entergy Corporation | 1 | – (Tracked for 3 days so far) |
| Deep Fission, Inc. | 1 | – (Tracked for 4 days so far) |
| Centrus Energy Corp. | 1 | – (Tracked for 3 days so far) |
| Standard Nuclear, Inc. | 1 | – (Tracked for 4 days so far) |