Keywords in job postings
How often words appear in open postings over time, and which companies and postings are behind them. Compare up to five.
Measures activity, not value. Not investment advice.
Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026; until then the change is the number of postings, without a percent.
Open postings mentioning each keyword, 28 May 2026 to 23 Nov 2026
Keywords
| Keyword | Open now | Change, 30 days | Highest |
|---|---|---|---|
| ASIC Followed daily |
863 | up +863 | 863 |
Behind “ASIC”
Postings (869)
| Title | Company | Role | Location | First seen | Status |
|---|---|---|---|---|---|
| Power Integrity Engineer | Etched | Hardware & electrical engineering Mid level | San Jose | Open | |
| Test Technical Program Manager | Etched | Program & project management Mid level | San Jose | Open | |
| Manufacturing Design Program Manager | Etched | Program & project management Mid level | San Jose | Open | |
| Data Center Engineer | Etched | Data-centre infrastructure Mid level | San Jose | Open | |
| Product Quality Engineer | Etched | Test, quality & reliability Mid level | San Jose | Open | |
| Optical Systems Engineer | Etched | Chip design (ASIC / RTL / verification / physical design) Mid level | San Jose | Open | |
| Firmware Engineer | Etched | Embedded & firmware Mid level | San Jose | Open | |
| Advanced Packaging SI/PI Engineer | Etched | Hardware & electrical engineering Mid level | San Jose | Open | |
| ASIC Technical Program Manager | Etched | Program & project management Mid level | San Jose | Open | |
| SI/PI Engineer | Etched | Hardware & electrical engineering Mid level | San Jose | Open | |
| Power Validation Engineer | Etched | Test, quality & reliability Mid level | San Jose | Open | |
| Network Security Engineer | Etched | Security Mid level | San Jose | Open | |
| Physical Design Engineer | Etched | Chip design (ASIC / RTL / verification / physical design) Mid level | Austin | Open | |
| Design Verification Engineer - SoC | Etched | Chip design (ASIC / RTL / verification / physical design) Mid level | Austin | Open | |
| DFT Intern | Etched | Chip design (ASIC / RTL / verification / physical design) Intern | San Jose | Open | |
| Formal Verification - DV | Etched | Chip design (ASIC / RTL / verification / physical design) Mid level | San Jose | Open | |
| Substrate IC Package Layout Design Engineer | Etched | Mechanical engineering Mid level | Taipei; San Jose | Open | |
| Electrical Platform Intern | Etched | Other Intern | San Jose | Open | |
| DV Intern | Etched | Chip design (ASIC / RTL / verification / physical design) Intern | San Jose | Open | |
| Mechanical / Thermal Intern | Etched | Thermal & cooling Intern | San Jose | Open | |
| Performance Modeling Engineer | Etched | ML / AI Mid level | San Jose | Open | |
| Firmware Engineer (Taiwan) | Etched | Embedded & firmware Mid level | Taipei | Open | |
| Design Verification Engineer - SoC | Etched | Chip design (ASIC / RTL / verification / physical design) Mid level | San Jose | Open | |
| ASIC Architect | Etched | Chip design (ASIC / RTL / verification / physical design) Mid level | San Jose | Open | |
| Developer Experience Engineer | Etched | SRE, DevOps & infrastructure Mid level | San Jose | Open |
Companies behind it
| Company | Open mentions | Change, 30 days |
|---|---|---|
| Amazon.Com Inc | 144 | – (Tracked for 3 days so far) |
| Cisco Systems, Inc. | 131 | – (Tracked for 3 days so far) |
| Space Exploration Technologies Corp. | 85 | – (Tracked for 3 days so far) |
| Astera Labs | 59 | – (Tracked for 5 days so far) |
| Etched | 40 | – (Tracked for 5 days so far) |
| Broadcom Inc. | 40 | – (Tracked for 3 days so far) |
| Teradyne, Inc. | 36 | – (Tracked for 3 days so far) |
| Micron Technology, Inc. | 35 | – (Tracked for 3 days so far) |
| RTX Corporation | 29 | – (Tracked for 3 days so far) |
| Celestica, Inc. | 21 | – (Tracked for 3 days so far) |
| Tenstorrent | 17 | – (Tracked for 5 days so far) |
| Cirrus Logic Inc | 16 | – (Tracked for 4 days so far) |
| Graphcore | 12 | – (Tracked for 5 days so far) |
| Lightmatter | 12 | – (Tracked for 5 days so far) |
| Cerebras Systems | 11 | – (Tracked for 5 days so far) |
| MatX | 9 | – (Tracked for 5 days so far) |
| Super Micro Computer, Inc. | 9 | – (Tracked for 3 days so far) |
| SambaNova Systems | 8 | – (Tracked for 5 days so far) |
| OpenAI | 8 | – (Tracked for 5 days so far) |
| Eliyan | 7 | – (Tracked for 5 days so far) |