Keywords in job postings
How often words appear in open postings over time, and which companies and postings are behind them. Compare up to five.
Measures activity, not value. Not investment advice.
Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026; until then the change is the number of postings, without a percent.
Open postings mentioning each keyword, 28 May 2026 to 23 Nov 2026
Keywords
| Keyword | Open now | Change, 30 days | Highest |
|---|---|---|---|
| Direct-to-chip cooling Followed daily |
62 | up +62 | 62 |
Behind “Direct-to-chip cooling”
Postings (62)
| Title | Company | Role | Location | First seen | Status |
|---|---|---|---|---|---|
| Data Center Mechanical Engineer | Anthropic | Data-centre infrastructure Mid level | Remote-Friendly, United States | Open | |
| Staff Mechanical Engineer | Graphcore | Mechanical engineering Staff / principal | Austin, Texas, United States | Open | |
| Principal Datacenter Technologist | Graphcore | Data-centre infrastructure Staff / principal | Milpitas, California, United States | Open | |
| Principal, Mechanical SME | Hut 8 | Mechanical engineering Staff / principal | St. Francisville, LA | Open | |
| Principal, Mechanical SME | Hut 8 | Mechanical engineering Staff / principal | Nueces County, TX | Open | |
| Mechanical Engineer, Partner | Hut 8 | Mechanical engineering Mid level | Miami, FL | Open | |
| Mechanical Engineering Intern, Data Center Infrastructure | Hut 8 | Data-centre infrastructure Intern | Miami, FL | Open | |
| Mechanical Design Engineer | Nebius | Mechanical engineering Mid level | Singapore | Open | |
| Mechanical Design Engineer | Nebius | Mechanical engineering Mid level | Amsterdam, Netherlands | Open | |
| DC Facilities Engineer | Nebius | Facilities & construction Mid level | Oklahoma, United States | Open | |
| DC Facilities Engineer | Nebius | Facilities & construction Mid level | New Jersey, United States | Open | |
| Data Center Facilities Engineer | Nebius | Data-centre infrastructure Mid level | Minnesota, United States | Open |
Companies behind it
| Company | Open mentions | Change, 30 days |
|---|---|---|
| Super Micro Computer, Inc. | 7 | – (Tracked for 3 days so far) |
| Nebius | 6 | – (Tracked for 5 days so far) |
| Crusoe | 6 | – (Tracked for 5 days so far) |
| Space Exploration Technologies Corp. | 5 | – (Tracked for 3 days so far) |
| TensorWave | 4 | – (Tracked for 5 days so far) |
| Hut 8 | 4 | – (Tracked for 5 days so far) |
| Etched | 3 | – (Tracked for 5 days so far) |
| Anthropic | 3 | – (Tracked for 5 days so far) |
| Amazon.Com Inc | 3 | – (Tracked for 3 days so far) |
| Ecolab, Inc. | 3 | – (Tracked for 3 days so far) |
| Graphcore | 2 | – (Tracked for 5 days so far) |
| Cloudflare | 2 | – (Tracked for 5 days so far) |
| Celestica, Inc. | 2 | – (Tracked for 3 days so far) |
| ePlus Inc | 2 | – (Tracked for 4 days so far) |
| TE Connectivity plc | 2 | – (Tracked for 3 days so far) |
| Baseten | 1 | – (Tracked for 5 days so far) |
| Lambda | 1 | – (Tracked for 5 days so far) |
| Cerebras Systems | 1 | – (Tracked for 5 days so far) |
| MatX | 1 | – (Tracked for 5 days so far) |
| Axelera AI | 1 | – (Tracked for 5 days so far) |