Keywords in job postings
How often words appear in open postings over time, and which companies and postings are behind them. Compare up to five.
Measures activity, not value. Not investment advice.
Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026; until then the change is the number of postings, without a percent.
Open postings mentioning each keyword, 28 May 2026 to 23 Nov 2026
Keywords
| Keyword | Open now | Change, 30 days | Highest |
|---|---|---|---|
| 2.5D packaging Followed daily |
81 | up +81 | 81 |
Behind “2.5D packaging”
Postings (82)
| Title | Company | Role | Location | First seen | Status |
|---|---|---|---|---|---|
| Sr Principal Sourcing Manager – Silicon Technologies | Astera Labs | Supply chain & procurement Manager | San Jose, California, United States | Open | |
| Senior Principal Photonics Test Engineer | Astera Labs | Hardware & electrical engineering Staff / principal | San Jose, California, United States | Open | |
| Product Technical Chip Lead, Senior Director | Astera Labs | Chip design (ASIC / RTL / verification / physical design) Director | San Jose, California, United States | Open | |
| Principal Supplier Quality Engineer /China | Astera Labs | Test, quality & reliability Staff / principal | Suzhou Qu, Gansu, China | Open | |
| Principal DFT Engineer | Astera Labs | Chip design (ASIC / RTL / verification / physical design) Staff / principal | Toronto, Ontario, Canada | Open | |
| Expert IC Package Design Lead | Astera Labs | Chip design (ASIC / RTL / verification / physical design) Senior | Israel | Open | |
| Staff SLT Test Engineer | Graphcore | Test, quality & reliability Staff / principal | Austin, Texas, United States | Open |
Companies behind it
| Company | Open mentions | Change, 30 days |
|---|---|---|
| Amazon.Com Inc | 17 | – (Tracked for 3 days so far) |
| Astera Labs | 6 | – (Tracked for 5 days so far) |
| Eliyan | 6 | – (Tracked for 5 days so far) |
| Cisco Systems, Inc. | 6 | – (Tracked for 3 days so far) |
| Skyworks Solutions Inc | 6 | – (Tracked for 3 days so far) |
| Etched | 5 | – (Tracked for 5 days so far) |
| Marvell Technology | 4 | – (Tracked for 5 days so far) |
| Mobileye | 4 | – (Tracked for 5 days so far) |
| Black Semiconductor | 3 | – (Tracked for 5 days so far) |
| Lightmatter | 3 | – (Tracked for 5 days so far) |
| Teradyne, Inc. | 3 | – (Tracked for 3 days so far) |
| MatX | 2 | – (Tracked for 5 days so far) |
| Mercury Systems Inc. | 2 | – (Tracked for 3 days so far) |
| Quantinuum Inc. | 2 | – (Tracked for 4 days so far) |
| SambaNova Systems | 1 | – (Tracked for 5 days so far) |
| Cerebras Systems | 1 | – (Tracked for 5 days so far) |
| d-Matrix | 1 | – (Tracked for 5 days so far) |
| Graphcore | 1 | – (Tracked for 5 days so far) |
| Fractile | 1 | – (Tracked for 5 days so far) |
| SiTime | 1 | – (Tracked for 5 days so far) |