Keywords in job postings
How often words appear in open postings over time, and which companies and postings are behind them. Compare up to five.
Measures activity, not value. Not investment advice.
Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026; until then the change is the number of postings, without a percent.
Open postings mentioning each keyword, 28 May 2026 to 23 Nov 2026
Keywords
| Keyword | Open now | Change, 30 days | Highest |
|---|---|---|---|
| Switchgear Followed daily |
1,239 | up +1,239 | 1,240 |
Behind “Switchgear”
Postings (1,247)
| Title | Company | Role | Location | First seen | Status |
|---|---|---|---|---|---|
| Principal Data Center Supply Chain Lead | Lambda | Data-centre infrastructure Staff / principal | San Jose Office (Zanker); Remote, USA; San Francisco Office (Fremont St); Bellevue Office | Open | |
| Staff Electrical Engineer - Low Voltage | Lambda | Electrical power & energy Staff / principal | San Francisco Office (Fremont St); San Jose Office (First St) | Open | |
| Senior Electrical Delivery Engineer | Lambda | Data-centre infrastructure Senior | Remote, USA; San Francisco Office (Fremont St) | Open | |
| Staff Sales Engineer , Grid Scale | Mainspring Energy | Solutions & sales engineering Staff / principal | Menlo Park, CA | Open | |
| Staff Project Engineer - Grid Scale | Mainspring Energy | Program & project management Staff / principal | Remote | Open | |
| Senior Staff Project Strategist | Mainspring Energy | Electrical power & energy Staff / principal | Menlo Park, CA | Open | |
| Senior EPC / Power Plant Deployment Lead | Exowatt | Electrical power & energy Senior | Austin, TX | Open | |
| Data Center Design Engineer | Cloudflare | Data-centre infrastructure Mid level | Hybrid | Open | |
| Data Center Architect | Cloudflare | Data-centre infrastructure Mid level | Hybrid | Open | |
| Substation Protection and Control Engineer, EPC | Redwood Materials | Electrical power & energy Mid level | San Francisco, California, United States | Open | |
| Substation Protection and Control Engineer, EPC | Redwood Materials | Electrical power & energy Mid level | McCarran, NV | Open | |
| Substation Protection and Control Engineer , EPC | Redwood Materials | Electrical power & energy Mid level | Carson City, NV | Open | |
| Staff Electrical Engineer, Energy Storage BoP | Redwood Materials | Electrical power & energy Staff / principal | San Francisco, California, United States | Open | |
| BESS Electrical Development Engineer, Senior or Staff | Redwood Materials | Electrical power & energy Staff / principal | McCarran, NV; San Francisco, California, United States | Closed 20 Nov 2026 | |
| Senior Manager, Commercial Contracts | Fervo Energy | Legal, policy & compliance Manager | Houston, TX | Open | |
| Electrical Engineer, Operations | Fervo Energy | Hardware & electrical engineering Mid level | Houston, TX, Milford, UT, Salt Lake City, UT | Open | |
| Electrical Engineer (PE) - Los Angeles | General Matter | Hardware & electrical engineering Mid level | Los Angeles, CA | Open | |
| Staff Electrical Engineer | Valar Atomics | Hardware & electrical engineering Staff / principal | Torrance, California, United States | Open | |
| Staff Electrical Engineer | Valar Atomics | Hardware & electrical engineering Staff / principal | Orangeville, Utah, United States | Open | |
| Senior Electrical Maintenance Planner | Valar Atomics | Operations & administration Senior | Orangeville, Utah, United States | Open | |
| Senior Electrical Engineer | Valar Atomics | Hardware & electrical engineering Senior | Torrance, California, United States | Open | |
| Senior Electrical Designer | Valar Atomics | Hardware & electrical engineering Senior | Torrance, California, United States | Open | |
| Electrical Maintenance Planner | Valar Atomics | Operations & administration Mid level | Orangeville, Utah, United States | Open | |
| Electrical Engineer | Valar Atomics | Hardware & electrical engineering Mid level | Torrance, California, United States | Open | |
| Director Instrumentation, Control, and Electrical – Power Conversion | Valar Atomics | Electrical power & energy Director | Torrance, California, United States | Open |
Companies behind it
| Company | Open mentions | Change, 30 days |
|---|---|---|
| Amazon.Com Inc | 927 | – (Tracked for 3 days so far) |
| Space Exploration Technologies Corp. | 53 | – (Tracked for 3 days so far) |
| Crusoe | 29 | – (Tracked for 5 days so far) |
| Freeport-McMoran Inc. | 25 | – (Tracked for 3 days so far) |
| Nebius | 16 | – (Tracked for 5 days so far) |
| Entergy Corporation | 16 | – (Tracked for 3 days so far) |
| Enerflex Ltd. | 11 | – (Tracked for 3 days so far) |
| TE Connectivity plc | 10 | – (Tracked for 3 days so far) |
| Valar Atomics | 9 | – (Tracked for 5 days so far) |
| Hut 8 | 8 | – (Tracked for 5 days so far) |
| Lambda | 5 | – (Tracked for 5 days so far) |
| Comstock Holding Companies, Inc. | 5 | – (Tracked for 4 days so far) |
| Celestica, Inc. | 5 | – (Tracked for 3 days so far) |
| TensorWave | 4 | – (Tracked for 5 days so far) |
| Anthropic | 4 | – (Tracked for 5 days so far) |
| Redwood Materials | 4 | – (Tracked for 5 days so far) |
| NextEra Energy, Inc. | 4 | – (Tracked for 3 days so far) |
| Energy Vault Holdings, Inc. | 4 | – (Tracked for 4 days so far) |
| CoreWeave | 3 | – (Tracked for 5 days so far) |
| Cerebras Systems | 3 | – (Tracked for 5 days so far) |