Keywords in job postings
How often words appear in open postings over time, and which companies and postings are behind them. Compare up to five.
Measures activity, not value. Not investment advice.
Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026; until then the change is the number of postings, without a percent.
Open postings mentioning each keyword, 28 May 2026 to 23 Nov 2026
Keywords
| Keyword | Open now | Change, 30 days | Highest |
|---|---|---|---|
| Gas turbines Followed daily |
135 | up +135 | 135 |
Behind “Gas turbines”
Postings (138)
| Title | Company | Role | Location | First seen | Status |
|---|---|---|---|---|---|
| Turbomachinery Design Engineer II | Antares | Mechanical engineering Mid level | Los Angeles | Open | |
| Senior Turbomachinery Design Engineer | Antares | Mechanical engineering Senior | Los Angeles | Open | |
| BIM Designer & Coordinator: Civil | OpenAI | Data-centre infrastructure Mid level | US - Remote | Open | |
| Power Generation Design Engineer, Electrical & Mechanical | OpenAI | Electrical power & energy Mid level | San Francisco | Open | |
| Associate Construction Engineer - Power Infrastructure | Crusoe | Facilities & construction Entry level | Denver, CO - US | Open | |
| Supercritical Fluids Processing Engineer | Valar Atomics | Electrical power & energy Mid level | Torrance, California, United States | Open | |
| Structures Engineer, Rotating Turbomachinery | Valar Atomics | Mechanical engineering Mid level | Torrance, California, United States | Open | |
| Rotordynamics Engineer, Turbomachinery | Valar Atomics | Mechanical engineering Mid level | Torrance, California, United States | Open | |
| Mechanical Design Engineer, Power Conversion | Valar Atomics | Electrical power & energy Mid level | Torrance, California, United States | Open | |
| Director of Mechanical Engineering, Power Conversion | Valar Atomics | Electrical power & energy Director | Torrance, California, United States | Open | |
| Director Instrumentation, Control, and Electrical – Power Conversion | Valar Atomics | Electrical power & energy Director | Torrance, California, United States | Open | |
| Data Center Substation, Protection & Automation Engineer | Anthropic | Data-centre infrastructure Mid level | Remote-Friendly, United States | Closed 20 Nov 2026 | |
| Data Center Power Generation and Microgrids Engineer | Anthropic | Data-centre infrastructure Mid level | Remote-Friendly, United States | Open |
Companies behind it
| Company | Open mentions | Change, 30 days |
|---|---|---|
| Space Exploration Technologies Corp. | 43 | – (Tracked for 3 days so far) |
| Amazon.Com Inc | 25 | – (Tracked for 3 days so far) |
| Entergy Corporation | 11 | – (Tracked for 3 days so far) |
| NextEra Energy, Inc. | 10 | – (Tracked for 3 days so far) |
| Leonardo DRS, Inc. | 7 | – (Tracked for 3 days so far) |
| Valar Atomics | 6 | – (Tracked for 5 days so far) |
| Vistra | 5 | – (Tracked for 5 days so far) |
| Bloom Energy | 3 | – (Tracked for 5 days so far) |
| Emerson Electric Co. | 3 | – (Tracked for 3 days so far) |
| OpenAI | 2 | – (Tracked for 5 days so far) |
| Antares | 2 | – (Tracked for 5 days so far) |
| GE Aerospace | 2 | – (Tracked for 3 days so far) |
| RTX Corporation | 2 | – (Tracked for 3 days so far) |
| WEC Energy Group, Inc. | 2 | – (Tracked for 3 days so far) |
| Crusoe | 1 | – (Tracked for 5 days so far) |
| Anthropic | 1 | – (Tracked for 5 days so far) |
| Chevron Corporation | 1 | – (Tracked for 3 days so far) |
| Enerflex Ltd. | 1 | – (Tracked for 3 days so far) |
| EQT CORP | 1 | – (Tracked for 4 days so far) |
| FuelCell Energy Inc NEW (DE) | 1 | – (Tracked for 3 days so far) |