StockMacro
Company, fund or insider

Help

Menu

Job search

Advanced packaging

2.5D/3D integration, substrates and bonding that put chiplets and memory in one package.

Measures activity, not value. Not investment advice.

Open postings mentioning its keywords

Open postings with any of the theme's keywords: 0 on 20 Sep 2026 (tracking began), 534 on 23 Nov 2026, highest 534. Lines for the 6 largest of 11 keywords.

What it follows

Keywords (11)

Companies

Companies behind it (30 days, every tracked company)

Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026; until then no percent is shown.

Company Open mentions Change New mentions
Amazon.Com Inc AMZN 84 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 6 *
Micron Technology, Inc. MU 51 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Space Exploration Technologies Corp. SPCX 36 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Skyworks Solutions Inc SWKS 32 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Lightmatter 23 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 3 *
Astera Labs ALAB 23 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Eliyan picked 21 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 1 *
Marvell Technology MRVL 21 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Cisco Systems, Inc. CSCO 20 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Etched 19 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Veeco Instruments Inc VECO 16 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Teradyne, Inc. TER 15 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Mobileye MBLY 13 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
SiTime SITM 12 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Quantinuum Inc. QNT 11 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Graphcore 9 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Mercury Systems Inc. MRCY 9 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Black Semiconductor 8 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Onto Innovation ONTO picked 8 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Fractile 7 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 1 *
Celestica, Inc. CLS 7 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Tenstorrent 6 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Analog Devices ADI 6 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Ethernovia 5 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Diamond Foundry 5 up +5 0
PsiQuantum 5 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Element Solutions Inc. ESI 5 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Qnity Electronics, Inc. Q 5 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Cerebras Systems 4 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 1 *
Cirrus Logic Inc CRUS 4 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
SambaNova Systems 3 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 2 *
d-Matrix 3 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
MatX 3 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
STMicroelectronics N.V. STM 3 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Seagate Technology Holdings PLC STX 3 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
FormFactor FORM picked 2 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Zoox 2 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
ON Semiconductor Corp ON 2 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Wolfspeed 1 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Ciena CIEN 1 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Lumentum LITE 1 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Lumai 1 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Aeva AEVA 1 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
OpenAI 1 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Waymo 1 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Ametek, Inc. AME 1 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
ATS Corporation ATS 1 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Broadcom Inc. AVGO 1 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Colgate-Palmolive Company CL 1 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Corning Incorporated GLW 1 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *

Changes in hiring

None so far for this theme, its companies or its keywords. A company needs 14 days of tracking first.

Postings that mention its keywords (343, newest first)

Title Company Role Location First seen Status
Director Quality, Reliability & I/O PsiQuantum Test, quality & reliability Director New York Open
Associate Process Engineer PsiQuantum Process engineering (semiconductor / materials) Entry level Milpitas, California Open
Staff /Sr Staff Laser Module & Systems Characterization Engineer Lightmatter Hardware & electrical engineering Staff / principal Mountain View, CA Open
Staff Operations Program Manager Lightmatter Program & project management Staff / principal Mountain View, CA Open
Staff Global Supply Manager Lightmatter Supply chain & procurement Manager Mountain View, CA Open
Sr. Staff Thermo-Mechanical Engineer Lightmatter Mechanical engineering Staff / principal Mountain View, CA Open
Senior Laser & SOA Characterization Engineer Lightmatter Hardware & electrical engineering Senior Mountain View, CA Open
Principal Hardware Systems Technical Lead Lightmatter Hardware & electrical engineering Staff / principal Mountain View, CA Closed 20 Nov 2026
Power Integrity Engineer Lightmatter Hardware & electrical engineering Mid level Mountain View, CA Open
Packaging Mechanical Design Internship - Summer 2027 Lightmatter Mechanical engineering Intern Mountain View, CA Open
Package Layout Engineer Lightmatter Chip design (ASIC / RTL / verification / physical design) Mid level Mountain View, CA Open
Mechanical Design Engineer Lightmatter Mechanical engineering Mid level Mountain View, CA Open
Hardware Systems Technical Lead Lightmatter Hardware & electrical engineering Senior Mountain View, CA Open
Associate Operations Program Manager Lightmatter Program & project management Entry level Boston, MA; Mountain View, CA Open
Principal IC Package Design Engineer Ethernovia Chip design (ASIC / RTL / verification / physical design) Staff / principal San Jose, CA Open
Sr. Package Engineer | 1715 SiTime Process engineering (semiconductor / materials) Senior Remote - Singapore Open
Sr. Engineer, Package Design | 1678 SiTime Chip design (ASIC / RTL / verification / physical design) Senior California, Santa Clara Open
Principal Engineer, Package Design | 1676 SiTime Chip design (ASIC / RTL / verification / physical design) Staff / principal California, Santa Clara; United States Open
Package Development Engineer | 1825 SiTime Process engineering (semiconductor / materials) Mid level Remote - Thailand Open
Package Development Engineer | 1822 SiTime Process engineering (semiconductor / materials) Mid level Hsin-Chu; Taipei Open
Director, Advanced AI Marketing and Business Development | 1726 SiTime Marketing & communications Director California, Santa Clara Open
Sr Principal Sourcing Manager – Silicon Technologies Astera Labs Supply chain & procurement Manager San Jose, California, United States Open
Senior Principal Photonics Test Engineer Astera Labs Hardware & electrical engineering Staff / principal San Jose, California, United States Open
Product Technical Chip Lead, Senior Director Astera Labs Chip design (ASIC / RTL / verification / physical design) Director San Jose, California, United States Open
Principal Supplier Quality Engineer /China Astera Labs Test, quality & reliability Staff / principal Suzhou Qu, Gansu, China Open