StockMacro
Company, fund or insider

Help

Menu

Job search

AI accelerators

Custom silicon for AI training and inference, including optical compute.

Measures activity, not value. Not investment advice.

Open postings mentioning its keywords

Open postings with any of the theme's keywords: 5 on 11 Dec 2025 (tracking began), 5,241 on 24 Nov 2026, highest 5,241. Lines for the 6 largest of 12 keywords.

What it follows

Keywords (12)

Companies

Companies behind it (30 days, every tracked company)

Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026; until then no percent is shown.

Company Open mentions Change New mentions
Amazon.Com Inc AMZN 1,016 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 17 *
Qualcomm Inc QCOM 305 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Micron Technology, Inc. MU 288 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 3 *
Astera Labs ALAB 280 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 11 *
Apple Inc. AAPL 279 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Space Exploration Technologies Corp. SPCX 227 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 12 *
Cisco Systems, Inc. CSCO 213 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 2 *
Tenstorrent picked 201 up +88 – (No percent: tracking began less than 30 days ago) 14
Etched picked 116 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 12
Teradyne, Inc. TER 106 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 1 *
Graphcore picked 104 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
L3Harris Technologies, Inc. LHX 103 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Celestica, Inc. CLS 100 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 1 *
SambaNova Systems picked 90 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 13 *
Cirrus Logic Inc CRUS 78 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
MatX picked 72 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 2 *
Eliyan 71 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Hewlett Packard Enterprise Company HPE 68 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Cerebras Systems picked 63 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 3 *
Broadcom Inc. AVGO 63 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Lightmatter picked 61 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 12 *
Skyworks Solutions Inc SWKS 60 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
TE Connectivity plc TEL 53 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Ambiq Micro, Inc. AMBQ 47 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 6 *
Silicon Labs SLAB 46 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
OpenAI 43 down −3 – (No percent: tracking began less than 30 days ago) 8
d-Matrix picked 43 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
SiTime SITM 41 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Analog Devices ADI 40 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Marvell Technology MRVL 39 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
RTX Corporation RTX 39 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Super Micro Computer, Inc. SMCI 37 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Fractile picked 35 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 3 *
Microsoft Corp MSFT 33 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Texas Instruments Incorporated TXN 33 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Lockheed Martin Corp. LMT 29 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Mobileye MBLY 24 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Advanced Energy Industries Inc AEIS 23 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Waymo 21 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Lattice Semiconductor Corp LSCC 21 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Nebius NBIS 20 up +2 – (No percent: tracking began less than 30 days ago) 0
Ametek, Inc. AME 19 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
IonQ, Inc. IONQ 19 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
indie Semiconductor INDI 18 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 2 *
Anthropic 16 down −15 – (No percent: tracking began less than 30 days ago) 1
Rocket Lab Corporation RKLB 16 up +13 – (No percent: tracking began less than 30 days ago) 0
PsiQuantum 15 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 2 *
Ethernovia 14 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Microchip Technology Inc MCHP 14 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Mercury Systems Inc. MRCY 13 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 1 *

Changes in hiring

None so far for this theme, its companies or its keywords. A company needs 14 days of tracking first.

Postings that mention its keywords (3,837, newest first)

Title Company Role Location First seen Status
Senior Engineer - IC Design (RTL AMS) Silicon Labs Chip design (ASIC / RTL / verification / physical design) Senior Hyderabad Open
Design Verification Engineer II Silicon Labs Chip design (ASIC / RTL / verification / physical design) Mid level Singapore Open
Senior Design Engineer Silicon Labs Mechanical engineering Senior Singapore Open
Senior Design Verification Engineer Silicon Labs Chip design (ASIC / RTL / verification / physical design) Senior Austin Open
Chip Lead Silicon Labs Chip design (ASIC / RTL / verification / physical design) Senior Austin Open
RFIC Design Engineer I Silicon Labs Mechanical engineering Entry level Austin Open
Associate Staff Design Modeling Engineer Silicon Labs Chip design (ASIC / RTL / verification / physical design) Staff / principal Austin Open
Static Timing Analysis Engineer Silicon Labs Chip design (ASIC / RTL / verification / physical design) Mid level Austin Open
Director, Digital IP Roadmap Silicon Labs Product management Director Austin Open
Design Engineer II Silicon Labs Mechanical engineering Mid level Austin Open
Senior Engineer – IC Verification Silicon Labs Software engineering Senior Hyderabad Open
Staff Physical Design Engineer Silicon Labs Chip design (ASIC / RTL / verification / physical design) Staff / principal Hyderabad Open
Staff Design Engineer - SOC Silicon Labs Mechanical engineering Staff / principal Singapore Open
Lead RTL Engineer ( Mixed-Signal IPs) Silicon Labs Chip design (ASIC / RTL / verification / physical design) Senior Hyderabad Open
Lead Engineer – IC Verification Silicon Labs Software engineering Senior Hyderabad Open
Lead Engineer – RTL Design (Wireless Modem IP) Silicon Labs Chip design (ASIC / RTL / verification / physical design) Senior Hyderabad Open
Lead Engineer – CAD Digital Verification Silicon Labs Software engineering Senior Hyderabad Open
Physical Design Intern Marvell Technology Chip design (ASIC / RTL / verification / physical design) Intern Cordoba, Argentina Open
Architecture ASIC Engineer Marvell Technology Chip design (ASIC / RTL / verification / physical design) Mid level Cordoba, Argentina Open
Physical Design Engineer Marvell Technology Chip design (ASIC / RTL / verification / physical design) Mid level Cordoba, Argentina Open
Physical design CAD engineer Marvell Technology Chip design (ASIC / RTL / verification / physical design) Mid level – Open
Sr. Staff CAD- ASIC Design Verification Agentic Workflow Marvell Technology Chip design (ASIC / RTL / verification / physical design) Staff / principal Santa Clara, CA Open
Physical Design Intern - Master's Degree Marvell Technology Chip design (ASIC / RTL / verification / physical design) Intern Singapore Open
Design Verification- Intern Marvell Technology Chip design (ASIC / RTL / verification / physical design) Intern Petah-Tikva Open
Principal Engineer, Physical Design Marvell Technology Chip design (ASIC / RTL / verification / physical design) Staff / principal Hsinchu City Open