Measures activity, not value. Not investment advice.
Open postings mentioning its keywords
What it follows
Keywords (12)
- AI accelerators
- ASIC
- Chiplets
- Computer architecture
- Design verification
- GPU kernels
- HBM
- MLIR
- Network-on-chip
- Physical design
- RTL design
- Tapeout
Companies
Companies behind it (30 days, every tracked company)
Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026; until then no percent is shown.
| Company | Open mentions | Change | New mentions |
|---|---|---|---|
| Amazon.Com Inc AMZN | 1,034 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 41 * |
| Qualcomm Inc QCOM | 307 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 4 * |
| Micron Technology, Inc. MU | 290 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 9 * |
| Apple Inc. AAPL | 279 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Astera Labs ALAB | 271 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 12 * |
| Cisco Systems, Inc. CSCO | 229 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 6 * |
| Space Exploration Technologies Corp. SPCX | 228 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 13 * |
| Tenstorrent picked | 201 | up +88 – (No percent: tracking began less than 30 days ago) | 19 |
| Etched picked | 118 | up +8 – (No percent: tracking began less than 30 days ago) | 12 |
| Teradyne, Inc. TER | 108 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 3 * |
| L3Harris Technologies, Inc. LHX | 103 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Celestica, Inc. CLS | 101 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 5 * |
| Graphcore picked | 100 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| SambaNova Systems picked | 98 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 23 * |
| Cirrus Logic Inc CRUS | 87 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 9 * |
| MatX picked | 72 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 2 * |
| Eliyan | 71 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Broadcom Inc. AVGO | 69 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 4 * |
| Hewlett Packard Enterprise Company HPE | 69 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| Lightmatter picked | 64 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 15 * |
| Marvell Technology MRVL | 61 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 22 * |
| Cerebras Systems picked | 60 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 3 * |
| Skyworks Solutions Inc SWKS | 60 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| TE Connectivity plc TEL | 53 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Silicon Labs SLAB | 46 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| OpenAI | 43 | down −3 – (No percent: tracking began less than 30 days ago) | 8 |
| Ambiq Micro, Inc. AMBQ | 43 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 6 * |
| d-Matrix picked | 43 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| SiTime SITM | 41 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| RTX Corporation RTX | 41 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Analog Devices ADI | 40 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Super Micro Computer, Inc. SMCI | 37 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Fractile picked | 35 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 3 * |
| Texas Instruments Incorporated TXN | 33 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Microsoft Corp MSFT | 31 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Lockheed Martin Corp. LMT | 29 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Advanced Energy Industries Inc AEIS | 24 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| Mobileye MBLY | 24 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Lattice Semiconductor Corp LSCC | 22 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| Waymo | 21 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Nebius NBIS | 20 | up +2 – (No percent: tracking began less than 30 days ago) | 0 |
| Ametek, Inc. AME | 19 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| IonQ, Inc. IONQ | 19 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| indie Semiconductor INDI | 18 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 2 * |
| Anthropic | 16 | down −15 – (No percent: tracking began less than 30 days ago) | 1 |
| Rocket Lab Corporation RKLB | 16 | up +13 – (No percent: tracking began less than 30 days ago) | 0 |
| PsiQuantum | 15 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 2 * |
| Ethernovia | 14 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Mercury Systems Inc. MRCY | 13 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| Cadence Design Systems CDNS | 13 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
Changes in hiring
-
-
Cerebras Systems: first open postings in role family 'manufacturing' (2 open; first time since tracking began on 8 Nov 2026)
-
Axelera AI: first open postings in role family 'people_recruiting' (2 open; first time since tracking began on 2 Nov 2026)
-
Axelera AI: first open postings in role family 'finance' (2 open; first time since tracking began on 2 Nov 2026)
Postings that mention its keywords (3,946, newest first)
| Title | Company | Role | Location | First seen | Status |
|---|---|---|---|---|---|
| Staff/Senior Staff Engineer - AMS Verification | Silicon Labs | Chip design (ASIC / RTL / verification / physical design) Staff / principal | Hyderabad | Open | |
| IC Design Engineer | Silicon Labs | Chip design (ASIC / RTL / verification / physical design) Mid level | Singapore | Open | |
| Associate Staff/Staff Implementation Design Engineer | Silicon Labs | Mechanical engineering Staff / principal | Singapore | Open | |
| IC Design Engineer | Silicon Labs | Chip design (ASIC / RTL / verification / physical design) Mid level | Singapore | Open | |
| 2027 New College Graduates - Design Engineering | Silicon Labs | Chip design (ASIC / RTL / verification / physical design) Mid level | Austin | Open | |
| Summer 2027 Internships - Design Engineering | Silicon Labs | Chip design (ASIC / RTL / verification / physical design) Intern | Austin | Open | |
| Senior Staff/ Staff Design Engineer | Silicon Labs | Mechanical engineering Staff / principal | Singapore | Open | |
| Manager / Senior Manager – Design Verification | Silicon Labs | Chip design (ASIC / RTL / verification / physical design) Manager | Hyderabad | Open | |
| Senior Engineer - IC Design (RTL AMS) | Silicon Labs | Chip design (ASIC / RTL / verification / physical design) Senior | Hyderabad | Open | |
| Design Verification Engineer II | Silicon Labs | Chip design (ASIC / RTL / verification / physical design) Mid level | Singapore | Open | |
| Senior Design Engineer | Silicon Labs | Mechanical engineering Senior | Singapore | Open | |
| Senior Design Verification Engineer | Silicon Labs | Chip design (ASIC / RTL / verification / physical design) Senior | Austin | Open | |
| Chip Lead | Silicon Labs | Chip design (ASIC / RTL / verification / physical design) Senior | Austin | Open | |
| RFIC Design Engineer I | Silicon Labs | Mechanical engineering Entry level | Austin | Open | |
| Associate Staff Design Modeling Engineer | Silicon Labs | Chip design (ASIC / RTL / verification / physical design) Staff / principal | Austin | Open | |
| Static Timing Analysis Engineer | Silicon Labs | Chip design (ASIC / RTL / verification / physical design) Mid level | Austin | Open | |
| Director, Digital IP Roadmap | Silicon Labs | Product management Director | Austin | Open | |
| Design Engineer II | Silicon Labs | Mechanical engineering Mid level | Austin | Open | |
| Senior Engineer – IC Verification | Silicon Labs | Software engineering Senior | Hyderabad | Open | |
| Staff Physical Design Engineer | Silicon Labs | Chip design (ASIC / RTL / verification / physical design) Staff / principal | Hyderabad | Open | |
| Staff Design Engineer - SOC | Silicon Labs | Mechanical engineering Staff / principal | Singapore | Open | |
| Lead RTL Engineer ( Mixed-Signal IPs) | Silicon Labs | Chip design (ASIC / RTL / verification / physical design) Senior | Hyderabad | Open | |
| Lead Engineer – IC Verification | Silicon Labs | Software engineering Senior | Hyderabad | Open | |
| Lead Engineer – RTL Design (Wireless Modem IP) | Silicon Labs | Chip design (ASIC / RTL / verification / physical design) Senior | Hyderabad | Open | |
| Lead Engineer – CAD Digital Verification | Silicon Labs | Software engineering Senior | Hyderabad | Open |