Measures activity, not value. Not investment advice.
Open postings mentioning its keywords
What it follows
Keywords (12)
- AI accelerators
- ASIC
- Chiplets
- Computer architecture
- Design verification
- GPU kernels
- HBM
- MLIR
- Network-on-chip
- Physical design
- RTL design
- Tapeout
Companies
Companies behind it (30 days, every tracked company)
Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026; until then no percent is shown.
| Company | Open mentions | Change | New mentions |
|---|---|---|---|
| Amazon.Com Inc AMZN | 1,034 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 41 * |
| Qualcomm Inc QCOM | 307 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 4 * |
| Micron Technology, Inc. MU | 290 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 9 * |
| Apple Inc. AAPL | 279 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Astera Labs ALAB | 271 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 12 * |
| Cisco Systems, Inc. CSCO | 229 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 6 * |
| Space Exploration Technologies Corp. SPCX | 228 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 13 * |
| Tenstorrent picked | 201 | up +88 – (No percent: tracking began less than 30 days ago) | 19 |
| Etched picked | 118 | up +8 – (No percent: tracking began less than 30 days ago) | 12 |
| Teradyne, Inc. TER | 108 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 3 * |
| L3Harris Technologies, Inc. LHX | 103 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Celestica, Inc. CLS | 101 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 5 * |
| Graphcore picked | 100 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| SambaNova Systems picked | 98 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 23 * |
| Cirrus Logic Inc CRUS | 87 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 9 * |
| MatX picked | 72 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 2 * |
| Eliyan | 71 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Broadcom Inc. AVGO | 69 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 4 * |
| Hewlett Packard Enterprise Company HPE | 69 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| Lightmatter picked | 64 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 15 * |
| Marvell Technology MRVL | 61 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 22 * |
| Cerebras Systems picked | 60 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 3 * |
| Skyworks Solutions Inc SWKS | 60 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| TE Connectivity plc TEL | 53 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Silicon Labs SLAB | 46 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| OpenAI | 43 | down −3 – (No percent: tracking began less than 30 days ago) | 8 |
| Ambiq Micro, Inc. AMBQ | 43 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 6 * |
| d-Matrix picked | 43 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| SiTime SITM | 41 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| RTX Corporation RTX | 41 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Analog Devices ADI | 40 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Super Micro Computer, Inc. SMCI | 37 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Fractile picked | 35 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 3 * |
| Texas Instruments Incorporated TXN | 33 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Microsoft Corp MSFT | 31 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Lockheed Martin Corp. LMT | 29 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Advanced Energy Industries Inc AEIS | 24 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| Mobileye MBLY | 24 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Lattice Semiconductor Corp LSCC | 22 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| Waymo | 21 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Nebius NBIS | 20 | up +2 – (No percent: tracking began less than 30 days ago) | 0 |
| Ametek, Inc. AME | 19 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| IonQ, Inc. IONQ | 19 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| indie Semiconductor INDI | 18 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 2 * |
| Anthropic | 16 | down −15 – (No percent: tracking began less than 30 days ago) | 1 |
| Rocket Lab Corporation RKLB | 16 | up +13 – (No percent: tracking began less than 30 days ago) | 0 |
| PsiQuantum | 15 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 2 * |
| Ethernovia | 14 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Mercury Systems Inc. MRCY | 13 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| Cadence Design Systems CDNS | 13 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
Changes in hiring
-
-
Cerebras Systems: first open postings in role family 'manufacturing' (2 open; first time since tracking began on 8 Nov 2026)
-
Axelera AI: first open postings in role family 'people_recruiting' (2 open; first time since tracking began on 2 Nov 2026)
-
Axelera AI: first open postings in role family 'finance' (2 open; first time since tracking began on 2 Nov 2026)
Postings that mention its keywords (3,946, newest first)
| Title | Company | Role | Location | First seen | Status |
|---|---|---|---|---|---|
| Senior Manager, Information Security | d-Matrix | Security Manager | Santa Clara | Open | |
| Sr. Staff PCB Design Engineer | d-Matrix | Hardware & electrical engineering Staff / principal | Santa Clara | Open | |
| Staff Analog Design Engineer, TX/RX Datapath | d-Matrix | Chip design (ASIC / RTL / verification / physical design) Staff / principal | Santa Clara | Open | |
| Staff Analog Design Engineer, SerDes Clocking | d-Matrix | Chip design (ASIC / RTL / verification / physical design) Staff / principal | Santa Clara | Open | |
| Staff Technical Recruiter - Contract | d-Matrix | People & recruiting Staff / principal | Bangalore | Open | |
| Senior Staff LLM Inference Engineer | d-Matrix | ML / AI Staff / principal | Santa Clara | Open | |
| Principal Software Engineer, Kernels | d-Matrix | Software engineering Staff / principal | Santa Clara | Open | |
| Sr. Staff Hardware Qualification Engineer | d-Matrix | Hardware & electrical engineering Staff / principal | Santa Clara | Open | |
| Sr. Staff Power Performance Architect | d-Matrix | Software engineering Staff / principal | Santa Clara | Open | |
| Sr. Staff Thermal Design Engineer | d-Matrix | Thermal & cooling Staff / principal | Santa Clara | Open | |
| Principal Software Engineer, Kernels | d-Matrix | Software engineering Staff / principal | Santa Clara | Open | |
| Principal Software Engineer, SDK & Lowering Stack | d-Matrix | Software engineering Staff / principal | Santa Clara | Open | |
| Staff Software Engineer, SIMD Kernels | d-Matrix | Software engineering Staff / principal | Santa Clara | Open | |
| Principal System Software Engineer, AI Inference Execution | d-Matrix | ML / AI Staff / principal | Santa Clara | Open | |
| Sr. Staff Design Verification Engineer | d-Matrix | Chip design (ASIC / RTL / verification / physical design) Staff / principal | Santa Clara | Open | |
| Principal Architect, Performance Analysis and Modeling | d-Matrix | Software engineering Staff / principal | Santa Clara; Remote | Open | |
| Vice President, Investor Relations | d-Matrix | Finance & accounting VP / executive | San Francisco; New York | Open | |
| Manufacturing Test Engineer | Etched | Manufacturing & production Mid level | San Jose | Open | |
| High-Speed Peripheral Firmware Lead | Etched | Embedded & firmware Senior | San Jose | Closed 21 Nov 2026 | |
| Site Reliability Engineer - Fleet Command & Control | Etched | SRE, DevOps & infrastructure Mid level | San Jose | Open | |
| IA Research Engineer Intern | Etched | Research & science Intern | San Jose | Open | |
| People Operations Generalist | Etched | People & recruiting Mid level | San Jose | Open | |
| Manufacturing Design Engineer (Taiwan) | Etched | Manufacturing & production Mid level | Taipei | Open | |
| Hardware Lab Manager | Cerebras Systems | Hardware & electrical engineering Manager | Sunnyvale, CA | Open | |
| PCB Layout Engineering Lead | Cerebras Systems | Hardware & electrical engineering Senior | Remote (US); Sunnyvale, CA | Open |