Measures activity, not value. Not investment advice.
Open postings mentioning its keywords
What it follows
Keywords (12)
- AI accelerators
- ASIC
- Chiplets
- Computer architecture
- Design verification
- GPU kernels
- HBM
- MLIR
- Network-on-chip
- Physical design
- RTL design
- Tapeout
Companies
Companies behind it (30 days, every tracked company)
Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026; until then no percent is shown.
| Company | Open mentions | Change | New mentions |
|---|---|---|---|
| Amazon.Com Inc AMZN | 1,016 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 17 * |
| Qualcomm Inc QCOM | 305 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Micron Technology, Inc. MU | 288 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 3 * |
| Astera Labs ALAB | 280 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 11 * |
| Apple Inc. AAPL | 279 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Space Exploration Technologies Corp. SPCX | 227 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 12 * |
| Cisco Systems, Inc. CSCO | 213 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 2 * |
| Tenstorrent picked | 201 | up +88 – (No percent: tracking began less than 30 days ago) | 14 |
| Etched picked | 116 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 12 |
| Teradyne, Inc. TER | 106 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| Graphcore picked | 104 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| L3Harris Technologies, Inc. LHX | 103 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Celestica, Inc. CLS | 100 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| SambaNova Systems picked | 90 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 13 * |
| Cirrus Logic Inc CRUS | 78 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| MatX picked | 72 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 2 * |
| Eliyan | 71 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Hewlett Packard Enterprise Company HPE | 68 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Cerebras Systems picked | 63 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 3 * |
| Broadcom Inc. AVGO | 63 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Lightmatter picked | 61 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 12 * |
| Skyworks Solutions Inc SWKS | 60 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| TE Connectivity plc TEL | 53 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Ambiq Micro, Inc. AMBQ | 47 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 6 * |
| Silicon Labs SLAB | 46 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| OpenAI | 43 | down −3 – (No percent: tracking began less than 30 days ago) | 8 |
| d-Matrix picked | 43 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| SiTime SITM | 41 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Analog Devices ADI | 40 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Marvell Technology MRVL | 39 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| RTX Corporation RTX | 39 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Super Micro Computer, Inc. SMCI | 37 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Fractile picked | 35 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 3 * |
| Microsoft Corp MSFT | 33 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Texas Instruments Incorporated TXN | 33 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Lockheed Martin Corp. LMT | 29 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Mobileye MBLY | 24 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Advanced Energy Industries Inc AEIS | 23 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Waymo | 21 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Lattice Semiconductor Corp LSCC | 21 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Nebius NBIS | 20 | up +2 – (No percent: tracking began less than 30 days ago) | 0 |
| Ametek, Inc. AME | 19 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| IonQ, Inc. IONQ | 19 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| indie Semiconductor INDI | 18 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 2 * |
| Anthropic | 16 | down −15 – (No percent: tracking began less than 30 days ago) | 1 |
| Rocket Lab Corporation RKLB | 16 | up +13 – (No percent: tracking began less than 30 days ago) | 0 |
| PsiQuantum | 15 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 2 * |
| Ethernovia | 14 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Microchip Technology Inc MCHP | 14 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Mercury Systems Inc. MRCY | 13 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
Changes in hiring
None so far for this theme, its companies or its keywords. A company needs 14 days of tracking first.
Postings that mention its keywords (3,837, newest first)
| Title | Company | Role | Location | First seen | Status |
|---|---|---|---|---|---|
| Staff Software Engineer (ML QA) | Graphcore | ML / AI Staff / principal | London, UK | Open | |
| Staff SoC Architect | Graphcore | Chip design (ASIC / RTL / verification / physical design) Staff / principal | Bristol, UK | Open | |
| Staff Silicon Verification Engineer | Graphcore | Chip design (ASIC / RTL / verification / physical design) Staff / principal | Bengaluru, India | Open | |
| Staff Silicon Physical Design Engineer | Graphcore | Chip design (ASIC / RTL / verification / physical design) Staff / principal | Bengaluru, India | Open | |
| Staff Silicon Logical Design Engineer - Multiple Vacancies | Graphcore | Chip design (ASIC / RTL / verification / physical design) Staff / principal | Bengaluru, India | Open | |
| Staff Hardware Validation Engineer | Graphcore | Hardware & electrical engineering Staff / principal | Austin, Texas, United States | Open | |
| Staff Embedded SW/FW Engineer (Bringup) - Multiple Vacancies | Graphcore | Embedded & firmware Staff / principal | Bengaluru, India | Open | |
| Staff Cloud Software Engineer | Graphcore | Software engineering Staff / principal | Gdańsk, Pomeranian Voivodeship, Poland | Open | |
| Silicon Verification Engineer - Multiple Levels | Graphcore | Chip design (ASIC / RTL / verification / physical design) Mid level | Bristol, UK; Cambridge, UK; London, UK | Open | |
| Silicon Summer Intern 2027 | Graphcore | Chip design (ASIC / RTL / verification / physical design) Intern | Bristol, UK; Cambridge, UK | Open | |
| Silicon Physical Design Engineer — Multiple Levels | Graphcore | Chip design (ASIC / RTL / verification / physical design) Mid level | Bristol, UK; Cambridge, UK | Open | |
| Silicon Logical Design Engineer - Multiple Levels | Graphcore | Chip design (ASIC / RTL / verification / physical design) Mid level | Bristol, UK; Cambridge, UK | Open | |
| Silicon DFT Engineer — Multiple Levels | Graphcore | Chip design (ASIC / RTL / verification / physical design) Mid level | Bristol, UK; Cambridge, UK | Open | |
| Senior System Tests & Diagnostics Engineer | Graphcore | Test, quality & reliability Senior | Austin, Texas, United States | Open | |
| Senior Software Engineer (ML QA) | Graphcore | ML / AI Senior | London, UK | Open | |
| Senior Software Engineer (ML QA) | Graphcore | ML / AI Senior | Cambridge, UK | Open | |
| Senior Software Engineer (ML QA) | Graphcore | ML / AI Senior | Bristol, UK | Open | |
| Senior Software Engineer | Graphcore | Software engineering Senior | Gdańsk, Pomeranian Voivodeship, Poland | Open | |
| Senior SoC Architect | Graphcore | Chip design (ASIC / RTL / verification / physical design) Senior | Bristol, UK | Open | |
| Senior Silicon Verification Engineer | Graphcore | Chip design (ASIC / RTL / verification / physical design) Senior | Bengaluru, India | Open | |
| Senior Silicon Logical Design Engineer - Multiple Vacancies | Graphcore | Chip design (ASIC / RTL / verification / physical design) Senior | Bengaluru, India | Open | |
| Senior Power & Performance Validation Engineer | Graphcore | Test, quality & reliability Senior | Bengaluru, India | Open | |
| Senior Physical Design Engineer | Graphcore | Chip design (ASIC / RTL / verification / physical design) Senior | Bengaluru, India | Open | |
| Senior Execution and Quality Validation Engineer | Graphcore | Test, quality & reliability Senior | Bengaluru, India | Open | |
| Senior Director, ML Software | Graphcore | ML / AI Director | Bristol, UK | Open |