StockMacro
Company, fund or insider

Help

Menu

Job search

AI accelerators

Custom silicon for AI training and inference, including optical compute.

Measures activity, not value. Not investment advice.

Open postings mentioning its keywords

Open postings with any of the theme's keywords: 5 on 11 Dec 2025, 5,575 on 26 Nov 2026, highest 5,575. Lines for the 6 largest of 12 keywords.

What it follows

Keywords (12)

Companies

Companies behind it (30 days, every tracked company)

Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026; until then no percent is shown.

Company Open mentions Change New mentions
Amazon.Com Inc AMZN 1,014 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 48 *
Qualcomm Inc QCOM 307 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 16 *
Micron Technology, Inc. MU 286 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 11 *
Apple Inc. AAPL 276 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Astera Labs ALAB 271 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 12 *
Cisco Systems, Inc. CSCO 247 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 10 *
Space Exploration Technologies Corp. SPCX 228 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 13 *
Tenstorrent picked 210 up +97 – (No percent: tracking began less than 30 days ago) 23
Nvidia Corp NVDA 180 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Etched picked 118 up +8 – (No percent: tracking began less than 30 days ago) 12
SambaNova Systems picked 115 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 40 *
Teradyne, Inc. TER 106 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 3 *
L3Harris Technologies, Inc. LHX 102 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 1 *
Graphcore picked 100 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Celestica, Inc. CLS 98 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 5 *
Cirrus Logic Inc CRUS 87 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 9 *
MatX picked 72 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 2 *
Intel Corp INTC 72 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Eliyan 71 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Hewlett Packard Enterprise Company HPE 69 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 2 *
Broadcom Inc. AVGO 66 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 4 *
Lightmatter picked 64 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 15 *
Cerebras Systems picked 60 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 3 *
Skyworks Solutions Inc SWKS 60 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 1 *
Marvell Technology MRVL 59 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 23 *
TE Connectivity plc TEL 50 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 1 *
Silicon Labs SLAB 46 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
d-Matrix picked 43 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
OpenAI 42 down −2 – (No percent: tracking began less than 30 days ago) 8
SiTime SITM 41 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
RTX Corporation RTX 41 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Analog Devices ADI 36 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Super Micro Computer, Inc. SMCI 36 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Fractile picked 35 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 3 *
Ambiq Micro, Inc. AMBQ 34 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 6 *
Texas Instruments Incorporated TXN 33 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 1 *
Microsoft Corp MSFT 31 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 1 *
Lockheed Martin Corp. LMT 27 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Advanced Energy Industries Inc AEIS 24 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 1 *
Mobileye MBLY 24 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Waymo 21 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
indie Semiconductor INDI 20 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 4 *
Lattice Semiconductor Corp LSCC 20 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 1 *
Nebius NBIS 18 down −1 – (No percent: tracking began less than 30 days ago) 0
Ametek, Inc. AME 18 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
IonQ, Inc. IONQ 18 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Anthropic 16 down −15 – (No percent: tracking began less than 30 days ago) 1
Rocket Lab Corporation RKLB 16 up +13 – (No percent: tracking began less than 30 days ago) 0
PsiQuantum 15 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 2 *
Cadence Design Systems CDNS 14 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 1 *

Changes in hiring

  1. A new keyword in its postings Strength 40

    Antares: followed keyword 'Design verification' in open postings (2 open; first time since tracking began on 29 Oct 2026)

  2. A new kind of role Strength 40

    Cerebras Systems: first open postings in role family 'manufacturing' (2 open; first time since tracking began on 8 Nov 2026)

  3. A new kind of role Strength 40

    Axelera AI: first open postings in role family 'people_recruiting' (2 open; first time since tracking began on 2 Nov 2026)

  4. A new kind of role Strength 40

    Axelera AI: first open postings in role family 'finance' (2 open; first time since tracking began on 2 Nov 2026)

All changes for this theme

Postings that mention its keywords (4,235, newest first)

Title Company Role Location First seen Status
Digital IC Design Engineer indie Semiconductor Chip design (ASIC / RTL / verification / physical design) Mid level Aliso Viejo, CA Open
Cybersecurity Firmware Engineer indie Semiconductor Security Mid level Toronto, Canada Open
Test Development Engineer | 10040 SiTime Test, quality & reliability Mid level California, Santa Clara Open
Sr. Layout Design Engineer | 1711 SiTime Mechanical engineering Senior India Open
Sr. Failure Analysis Engineer | 172 SiTime Test, quality & reliability Senior California, Santa Clara Open
Sr. Engineer, Verifications | 1747 SiTime Software engineering Senior Germany; Munich, Bavaria, Germany Open
Sr. Engineer, Verifications | 1535 SiTime Software engineering Senior Japan; Tokyo Open
Sr. Engineer, Verifications | 1432 SiTime Software engineering Senior Rijswijk Open
Sr. Engineer, Mixed Signal ASIC Systems | 1779 SiTime Chip design (ASIC / RTL / verification / physical design) Senior Canada; Ottawa Open
Sr. Engineer, Layout Design | 1701 SiTime Software engineering Senior Munich, Bavaria, Germany Open
Sr. Engineer, Layout Design | 1693 SiTime Software engineering Senior Tokyo Open
Sr. Engineer, Digital Design | 1728 SiTime Chip design (ASIC / RTL / verification / physical design) Senior Munich, Bavaria, Germany Open
Sr. Engineer, Digital Design | 1278 SiTime Chip design (ASIC / RTL / verification / physical design) Senior Rijswijk Open
Senior Engineer, Layout Design | 10022 SiTime Software engineering Senior Japan Open
Senior Engineer, Layout Design | 10020 SiTime Software engineering Senior Bangalore Open
Senior Engineer, Failure Analysis | 10006 SiTime Test, quality & reliability Senior Taipei; Taiwan Open
Principal Test Architect | 10053 SiTime Test, quality & reliability Staff / principal California, Santa Clara Open
Principal Physical Design Engineer | 10030 SiTime Chip design (ASIC / RTL / verification / physical design) Staff / principal Arizona, Tempe; California, Santa Clara Open
Principal FPGA Design Engineer | 1486 SiTime Chip design (ASIC / RTL / verification / physical design) Staff / principal California, Santa Clara Open
Principal Engineer, Layout Design | 1758 SiTime Software engineering Staff / principal California, Santa Clara Open
Principal Engineer, CAD | 1770 SiTime Software engineering Staff / principal Canada; Ottawa Open
Principal Engineer, CAD | 1769 SiTime Software engineering Staff / principal Arizona, Tempe Open
Principal Engineer, CAD | 1643 SiTime Software engineering Staff / principal United States Open
Principal Engineer, Analog Mixed-Signal Design | 1703 SiTime Chip design (ASIC / RTL / verification / physical design) Staff / principal Germany; Munich, Bavaria, Germany Open
Principal DFT Engineer | 10032 SiTime Chip design (ASIC / RTL / verification / physical design) Staff / principal United States Open