Measures activity, not value. Not investment advice.
Open postings mentioning its keywords
What it follows
Keywords (12)
- AI accelerators
- ASIC
- Chiplets
- Computer architecture
- Design verification
- GPU kernels
- HBM
- MLIR
- Network-on-chip
- Physical design
- RTL design
- Tapeout
Companies
Companies behind it (30 days, every tracked company)
Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026; until then no percent is shown.
| Company | Open mentions | Change | New mentions |
|---|---|---|---|
| Amazon.Com Inc AMZN | 1,014 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 48 * |
| Qualcomm Inc QCOM | 307 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 16 * |
| Micron Technology, Inc. MU | 286 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 11 * |
| Apple Inc. AAPL | 276 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Astera Labs ALAB | 271 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 12 * |
| Cisco Systems, Inc. CSCO | 247 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 10 * |
| Space Exploration Technologies Corp. SPCX | 228 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 13 * |
| Tenstorrent picked | 210 | up +97 – (No percent: tracking began less than 30 days ago) | 23 |
| Nvidia Corp NVDA | 180 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Etched picked | 118 | up +8 – (No percent: tracking began less than 30 days ago) | 12 |
| SambaNova Systems picked | 115 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 40 * |
| Teradyne, Inc. TER | 106 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 3 * |
| L3Harris Technologies, Inc. LHX | 102 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| Graphcore picked | 100 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Celestica, Inc. CLS | 98 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 5 * |
| Cirrus Logic Inc CRUS | 87 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 9 * |
| MatX picked | 72 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 2 * |
| Intel Corp INTC | 72 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Eliyan | 71 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Hewlett Packard Enterprise Company HPE | 69 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 2 * |
| Broadcom Inc. AVGO | 66 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 4 * |
| Lightmatter picked | 64 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 15 * |
| Cerebras Systems picked | 60 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 3 * |
| Skyworks Solutions Inc SWKS | 60 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| Marvell Technology MRVL | 59 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 23 * |
| TE Connectivity plc TEL | 50 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| Silicon Labs SLAB | 46 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| d-Matrix picked | 43 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| OpenAI | 42 | down −2 – (No percent: tracking began less than 30 days ago) | 8 |
| SiTime SITM | 41 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| RTX Corporation RTX | 41 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Analog Devices ADI | 36 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Super Micro Computer, Inc. SMCI | 36 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Fractile picked | 35 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 3 * |
| Ambiq Micro, Inc. AMBQ | 34 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 6 * |
| Texas Instruments Incorporated TXN | 33 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| Microsoft Corp MSFT | 31 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| Lockheed Martin Corp. LMT | 27 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Advanced Energy Industries Inc AEIS | 24 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| Mobileye MBLY | 24 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Waymo | 21 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| indie Semiconductor INDI | 20 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 4 * |
| Lattice Semiconductor Corp LSCC | 20 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| Nebius NBIS | 18 | down −1 – (No percent: tracking began less than 30 days ago) | 0 |
| Ametek, Inc. AME | 18 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| IonQ, Inc. IONQ | 18 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Anthropic | 16 | down −15 – (No percent: tracking began less than 30 days ago) | 1 |
| Rocket Lab Corporation RKLB | 16 | up +13 – (No percent: tracking began less than 30 days ago) | 0 |
| PsiQuantum | 15 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 2 * |
| Cadence Design Systems CDNS | 14 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
Changes in hiring
-
-
Cerebras Systems: first open postings in role family 'manufacturing' (2 open; first time since tracking began on 8 Nov 2026)
-
Axelera AI: first open postings in role family 'people_recruiting' (2 open; first time since tracking began on 2 Nov 2026)
-
Axelera AI: first open postings in role family 'finance' (2 open; first time since tracking began on 2 Nov 2026)
Postings that mention its keywords (4,235, newest first)
| Title | Company | Role | Location | First seen | Status |
|---|---|---|---|---|---|
| Silicon Operations Program Manager | Etched | Program & project management Mid level | San Jose | Open | |
| Internal Acceleration, Research Engineer (ASIC) | Etched | Chip design (ASIC / RTL / verification / physical design) Mid level | San Jose | Open | |
| Internal Acceleration, Engineer (ASIC) | Etched | Chip design (ASIC / RTL / verification / physical design) Mid level | San Jose | Open | |
| Silicon Validation Engineer, Software | Etched | Chip design (ASIC / RTL / verification / physical design) Mid level | San Jose | Open | |
| Research Engineer, RL Frontiers | Etched | Research & science Mid level | San Jose | Open | |
| Substrate IC Package Layout Design Engineer | Etched | Mechanical engineering Mid level | San Jose | Open | |
| Performance Tools Intern | Etched | Embedded & firmware Intern | San Jose | Open | |
| Power Integrity Engineer | Etched | Hardware & electrical engineering Mid level | San Jose | Open | |
| Test Technical Program Manager | Etched | Program & project management Mid level | San Jose | Open | |
| Manufacturing Design Program Manager | Etched | Program & project management Mid level | San Jose | Open | |
| Physical Design Engineer - Full Chip Implementation | Etched | Chip design (ASIC / RTL / verification / physical design) Mid level | San Jose | Open | |
| Physical Design Engineer - Block Level, Subsystem Implementation | Etched | Chip design (ASIC / RTL / verification / physical design) Mid level | Austin | Open | |
| Physical Design Engineer - Block Level, Subsystem Implementation | Etched | Chip design (ASIC / RTL / verification / physical design) Mid level | San Jose | Open | |
| Physical Design Engineer - Flow & Methodologies | Etched | Chip design (ASIC / RTL / verification / physical design) Mid level | San Jose | Open | |
| Platform Product Reliability | Etched | Test, quality & reliability Mid level | San Jose | Open | |
| Data Center Engineer | Etched | Data-centre infrastructure Mid level | San Jose | Open | |
| Emulation Engineer, Hardware Prototyping (HAPS) | Etched | Chip design (ASIC / RTL / verification / physical design) Mid level | San Jose | Open | |
| Product Quality Engineer | Etched | Test, quality & reliability Mid level | San Jose | Open | |
| Optical Systems Engineer | Etched | Chip design (ASIC / RTL / verification / physical design) Mid level | San Jose | Open | |
| Firmware Engineer | Etched | Embedded & firmware Mid level | San Jose | Open | |
| Advanced Packaging SI/PI Engineer | Etched | Hardware & electrical engineering Mid level | San Jose | Open | |
| Product Engineer, Silicon Validation | Etched | Chip design (ASIC / RTL / verification / physical design) Mid level | San Jose | Open | |
| ASIC Technical Program Manager | Etched | Program & project management Mid level | San Jose | Open | |
| SI/PI Engineer | Etched | Hardware & electrical engineering Mid level | San Jose | Open | |
| Power Validation Engineer | Etched | Test, quality & reliability Mid level | San Jose | Open |