Measures activity, not value. Not investment advice.
Open postings mentioning its keywords
What it follows
Keywords (12)
- AI accelerators
- ASIC
- Chiplets
- Computer architecture
- Design verification
- GPU kernels
- HBM
- MLIR
- Network-on-chip
- Physical design
- RTL design
- Tapeout
Companies
Companies behind it (30 days, every tracked company)
Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026; until then no percent is shown.
| Company | Open mentions | Change | New mentions |
|---|---|---|---|
| Amazon.Com Inc AMZN | 1,009 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 5 * |
| Micron Technology, Inc. MU | 289 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| Astera Labs ALAB | 275 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 6 * |
| Space Exploration Technologies Corp. SPCX | 227 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 2 * |
| Cisco Systems, Inc. CSCO | 200 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Tenstorrent picked | 199 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 12 * |
| Etched picked | 117 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 2 * |
| Graphcore picked | 107 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Teradyne, Inc. TER | 105 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Celestica, Inc. CLS | 99 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| SambaNova Systems picked | 91 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 13 * |
| Cirrus Logic Inc CRUS | 78 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Eliyan | 71 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| MatX picked | 70 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Cerebras Systems picked | 63 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Broadcom Inc. AVGO | 63 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Lightmatter picked | 60 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 11 * |
| Skyworks Solutions Inc SWKS | 60 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| TE Connectivity plc TEL | 53 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Ambiq Micro, Inc. AMBQ | 47 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 5 * |
| Silicon Labs SLAB | 46 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| OpenAI | 43 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| d-Matrix picked | 43 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| SiTime SITM | 41 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Analog Devices ADI | 40 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Marvell Technology MRVL | 39 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Super Micro Computer, Inc. SMCI | 39 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| RTX Corporation RTX | 37 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Fractile picked | 35 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 3 * |
| Texas Instruments Incorporated TXN | 33 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Microsoft Corp MSFT | 30 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Mobileye MBLY | 24 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Waymo | 21 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Lattice Semiconductor Corp LSCC | 21 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Nebius NBIS | 20 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Ametek, Inc. AME | 19 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| IonQ, Inc. IONQ | 19 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| indie Semiconductor INDI | 18 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 2 * |
| Anthropic | 16 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Rocket Lab Corporation RKLB | 16 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Ethernovia | 14 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Microchip Technology Inc MCHP | 14 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| PsiQuantum | 13 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Leonardo DRS, Inc. DRS | 13 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Apptronik | 12 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 2 * |
| Mercury Systems Inc. MRCY | 12 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Zoox | 11 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| AST SpaceMobile, Inc. ASTS | 11 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Cohere | 10 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Quantinuum Inc. QNT | 10 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
Changes in hiring
None so far for this theme, its companies or its keywords. A company needs 14 days of tracking first.
Postings that mention its keywords (2,941, newest first)
| Title | Company | Role | Location | First seen | Status |
|---|---|---|---|---|---|
| Senior Electrical Engineer II | Rocket Lab Corporation | Hardware & electrical engineering Senior | Long Beach, CA | Open | |
| Senior Electrical Engineer II | Rocket Lab Corporation | Hardware & electrical engineering Senior | Pasadena, CA | Open | |
| Senior Electrical Engineer I | Rocket Lab Corporation | Hardware & electrical engineering Senior | Long Beach, CA | Open | |
| Senior Avionics Manufacturing Technician | Rocket Lab Corporation | Manufacturing & production Senior | Pasadena, CA | Open | |
| Principal Electrical Engineer | Rocket Lab Corporation | Hardware & electrical engineering Staff / principal | Tucson, AZ | Open | |
| Lead Assembly Integration & Test Technician | Rocket Lab Corporation | Manufacturing & production Senior | Pasadena, CA | Open | |
| Electrical Engineer II | Rocket Lab Corporation | Hardware & electrical engineering Mid level | Long Beach, CA | Open | |
| Electrical Engineer II | Rocket Lab Corporation | Hardware & electrical engineering Mid level | Pasadena, CA | Open | |
| Electrical Engineer I | Rocket Lab Corporation | Hardware & electrical engineering Entry level | Pasadena, CA | Open | |
| Avionics Engineer II - Design | Rocket Lab Corporation | Hardware & electrical engineering Mid level | Auckland, NZ | Open | |
| RTL Design Engineer (ARM) | STMicroelectronics N.V. | Chip design (ASIC / RTL / verification / physical design) Mid level | Greater Noida, India; Bangalore, India | Open | |
| Digital Design Engineer – AI Accelerators | STMicroelectronics N.V. | Chip design (ASIC / RTL / verification / physical design) Mid level | Greater Noida, India | Open | |
| RTL Design - Technical Lead | STMicroelectronics N.V. | Chip design (ASIC / RTL / verification / physical design) Senior | Greater Noida, India | Open | |
| Design Verification- Technical Leader | STMicroelectronics N.V. | Chip design (ASIC / RTL / verification / physical design) Mid level | Greater Noida, India | Open | |
| Design Verification - Technical Leader | STMicroelectronics N.V. | Chip design (ASIC / RTL / verification / physical design) Mid level | Greater Noida, India | Open | |
| Design Verification Manager | STMicroelectronics N.V. | Chip design (ASIC / RTL / verification / physical design) Manager | Greater Noida, India | Open | |
| Intern, Digital Design Verification | STMicroelectronics N.V. | Chip design (ASIC / RTL / verification / physical design) Intern | Singapore, Singapore | Open | |
| ASIC Design Verification Intern | STMicroelectronics N.V. | Chip design (ASIC / RTL / verification / physical design) Intern | Coppell, United States | Open | |
| RTL Design Leader | STMicroelectronics N.V. | Chip design (ASIC / RTL / verification / physical design) Mid level | Greater Noida, India; Bangalore, India | Open | |
| Commercial Manager, Airline Distribution & GDS | Booking Holdings Inc. | Sales & business development Manager | Amsterdam, Netherlands | Open | |
| Wi-Fi Engineer, Hardware Reliability (Starlink) | Space Exploration Technologies Corp. | Hardware & electrical engineering Mid level | Bastrop, TX | Open | |
| Test Stand Design & Build Engineer (Structures/Fluid Systems) | Space Exploration Technologies Corp. | Thermal & cooling Mid level | McGregor, TX | Open | |
| Summer 2027 Software Engineering Internship/Co-op | Space Exploration Technologies Corp. | Software engineering Intern | Flexible - Any SpaceX Site | Open | |
| Summer 2027 Silicon Engineering Internship/Co-op | Space Exploration Technologies Corp. | Chip design (ASIC / RTL / verification / physical design) Intern | Flexible - Any SpaceX Site | Open | |
| Sr. Transmission & Generation Planning Engineer (PE) | Space Exploration Technologies Corp. | Legal, policy & compliance Senior | Starbase, TX | Open |