Measures activity, not value. Not investment advice.
Open postings mentioning its keywords
What it follows
Keywords (12)
- AI accelerators
- ASIC
- Chiplets
- Computer architecture
- Design verification
- GPU kernels
- HBM
- MLIR
- Network-on-chip
- Physical design
- RTL design
- Tapeout
Companies
Companies behind it (30 days, every tracked company)
Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026; until then no percent is shown.
| Company | Open mentions | Change | New mentions |
|---|---|---|---|
| Amazon.Com Inc AMZN | 1,009 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 5 * |
| Micron Technology, Inc. MU | 289 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| Astera Labs ALAB | 275 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 6 * |
| Space Exploration Technologies Corp. SPCX | 227 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 2 * |
| Cisco Systems, Inc. CSCO | 200 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Tenstorrent picked | 199 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 12 * |
| Etched picked | 117 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 2 * |
| Graphcore picked | 107 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Teradyne, Inc. TER | 105 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Celestica, Inc. CLS | 99 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| SambaNova Systems picked | 91 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 13 * |
| Cirrus Logic Inc CRUS | 78 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Eliyan | 71 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| MatX picked | 70 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Cerebras Systems picked | 63 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Broadcom Inc. AVGO | 63 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Lightmatter picked | 60 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 11 * |
| Skyworks Solutions Inc SWKS | 60 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| TE Connectivity plc TEL | 53 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Ambiq Micro, Inc. AMBQ | 47 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 5 * |
| Silicon Labs SLAB | 46 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| OpenAI | 43 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| d-Matrix picked | 43 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| SiTime SITM | 41 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Analog Devices ADI | 40 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Marvell Technology MRVL | 39 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Super Micro Computer, Inc. SMCI | 39 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| RTX Corporation RTX | 37 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Fractile picked | 35 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 3 * |
| Texas Instruments Incorporated TXN | 33 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Microsoft Corp MSFT | 30 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Mobileye MBLY | 24 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Waymo | 21 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Lattice Semiconductor Corp LSCC | 21 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Nebius NBIS | 20 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Ametek, Inc. AME | 19 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| IonQ, Inc. IONQ | 19 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| indie Semiconductor INDI | 18 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 2 * |
| Anthropic | 16 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Rocket Lab Corporation RKLB | 16 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Ethernovia | 14 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Microchip Technology Inc MCHP | 14 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| PsiQuantum | 13 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Leonardo DRS, Inc. DRS | 13 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Apptronik | 12 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 2 * |
| Mercury Systems Inc. MRCY | 12 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Zoox | 11 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| AST SpaceMobile, Inc. ASTS | 11 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Cohere | 10 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Quantinuum Inc. QNT | 10 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
Changes in hiring
None so far for this theme, its companies or its keywords. A company needs 14 days of tracking first.
Postings that mention its keywords (2,941, newest first)
| Title | Company | Role | Location | First seen | Status |
|---|---|---|---|---|---|
| Data Center Technician, ADC InfraOps DCO | Amazon.Com Inc | Data-centre infrastructure Mid level | Aurora, Colorado, USA | Open | |
| Principal Quantum Design Verification Engineer | Microsoft Corp | Chip design (ASIC / RTL / verification / physical design) Staff / principal | United States, Washington, Redmond | Open | |
| Senior Quantum Design Verification Engineer | Microsoft Corp | Chip design (ASIC / RTL / verification / physical design) Senior | United States, Washington, Redmond | Open | |
| Director, Silicon Physical Design CAD | Microsoft Corp | Chip design (ASIC / RTL / verification / physical design) Director | India, Karnataka, Bangalore | Open | |
| Principal Physical Design Engineer | Microsoft Corp | Chip design (ASIC / RTL / verification / physical design) Staff / principal | India, Karnataka, Bangalore; India, Telangana, Hyderabad | Open | |
| Senior Physical Design Engineer | Microsoft Corp | Chip design (ASIC / RTL / verification / physical design) Senior | United States, Oregon, Hillsboro; United States, California, Mountain View; United States, Texas, Austin; United States, North Carolina, Raleigh; United States, Washington, Redmond | Open | |
| Physical Design Engineer II | Microsoft Corp | Chip design (ASIC / RTL / verification / physical design) Mid level | India, Karnataka, Bangalore | Open | |
| Principal Silicon Design Verification Manager | Microsoft Corp | Chip design (ASIC / RTL / verification / physical design) Manager | Israel, Tel Aviv, Herzliya; Israel, Multiple Locations, Multiple Locations | Open | |
| Design Verification Engineer | Microsoft Corp | Chip design (ASIC / RTL / verification / physical design) Mid level | United States, North Carolina, Raleigh; United States, Texas, Austin | Open | |
| Silicon Physical Design CAD Engineer | Microsoft Corp | Chip design (ASIC / RTL / verification / physical design) Mid level | India, Karnataka, Bangalore | Open | |
| Principal Formal Design Verification Engineer | Microsoft Corp | Chip design (ASIC / RTL / verification / physical design) Staff / principal | India, Karnataka, Bangalore | Open | |
| Senior Design Verification Engineer | Microsoft Corp | Chip design (ASIC / RTL / verification / physical design) Senior | United States, Washington, Redmond; United States, California, Mountain View; United States, Texas, Austin | Open | |
| Senior Physical Design Engineer | Microsoft Corp | Chip design (ASIC / RTL / verification / physical design) Senior | United States, Oregon, Hillsboro; United States, California, Mountain View; United States, Texas, Austin; United States, North Carolina, Raleigh; United States, Washington, Redmond | Open | |
| Senior Physical Design Engineer | Microsoft Corp | Chip design (ASIC / RTL / verification / physical design) Senior | India, Karnataka, Bangalore; India, Telangana, Hyderabad | Open | |
| Design Verification Engineer- Senior / Principal | Microsoft Corp | Chip design (ASIC / RTL / verification / physical design) Staff / principal | India, Multiple Locations, Multiple Locations | Open | |
| Design Verification Engineer II | Microsoft Corp | Chip design (ASIC / RTL / verification / physical design) Mid level | India, Karnataka, Bangalore | Open | |
| Principal Design Verification Engineer | Microsoft Corp | Chip design (ASIC / RTL / verification / physical design) Staff / principal | United States, Texas, Austin; United States, Washington, Redmond; United States, North Carolina, Raleigh; United States, Oregon, Hillsboro; United States, Idaho, Boise; United States, California, Mountain View | Closed 22 Nov 2026 | |
| Senior Silicon Design Verification Engineer | Microsoft Corp | Chip design (ASIC / RTL / verification / physical design) Senior | United States, California, Mountain View | Open | |
| Senior Design Verification Engineer - Fabric Interconnect | Microsoft Corp | Chip design (ASIC / RTL / verification / physical design) Senior | United States, North Carolina, Raleigh; United States, Oregon, Hillsboro; United States, California, Mountain View; United States, Texas, Austin | Open | |
| Design Verification Engineer - Fabric Interconnect | Microsoft Corp | Chip design (ASIC / RTL / verification / physical design) Mid level | United States, North Carolina, Raleigh; United States, Oregon, Hillsboro; United States, Texas, Austin; United States, California, Mountain View | Open | |
| Principal Design Verification Engineer | Microsoft Corp | Chip design (ASIC / RTL / verification / physical design) Staff / principal | United States, North Carolina, Raleigh; United States, Texas, Austin | Open | |
| Senior Physical Design Verification Engineer | Microsoft Corp | Chip design (ASIC / RTL / verification / physical design) Senior | United States, Oregon, Hillsboro; United States, California, Mountain View; United States, Texas, Austin; United States, North Carolina, Raleigh | Open | |
| Senior Silicon Design Verification Engineer | Microsoft Corp | Chip design (ASIC / RTL / verification / physical design) Senior | United States, California, Mountain View; United States, Texas, Austin; United States, Oregon, Hillsboro; United States, Washington, Redmond; United States, North Carolina, Raleigh | Open | |
| Senior Design Verification Engineer | Microsoft Corp | Chip design (ASIC / RTL / verification / physical design) Senior | United States, North Carolina, Raleigh; United States, Texas, Austin; United States, Washington, Redmond | Open | |
| Principal Silicon Design Verification Engineer | Microsoft Corp | Chip design (ASIC / RTL / verification / physical design) Staff / principal | United States, California, Santa Clara; United States, California, Mountain View; United States, Oregon, Hillsboro; United States, Texas, Austin; United States, Idaho, Boise; United States, California, San Diego; United States, Washington, Redmond | Closed 22 Nov 2026 |