Measures activity, not value. Not investment advice.
Open postings mentioning its keywords
What it follows
Keywords (12)
- AI accelerators
- ASIC
- Chiplets
- Computer architecture
- Design verification
- GPU kernels
- HBM
- MLIR
- Network-on-chip
- Physical design
- RTL design
- Tapeout
Companies
Companies behind it (30 days, every tracked company)
Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026; until then no percent is shown.
| Company | Open mentions | Change | New mentions |
|---|---|---|---|
| Amazon.Com Inc AMZN | 1,016 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 17 * |
| Qualcomm Inc QCOM | 305 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Micron Technology, Inc. MU | 288 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 3 * |
| Astera Labs ALAB | 280 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 11 * |
| Apple Inc. AAPL | 279 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Space Exploration Technologies Corp. SPCX | 227 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 2 * |
| Cisco Systems, Inc. CSCO | 213 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 2 * |
| Tenstorrent picked | 201 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 14 * |
| Etched picked | 116 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 2 * |
| Teradyne, Inc. TER | 106 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| Graphcore picked | 104 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| L3Harris Technologies, Inc. LHX | 103 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Celestica, Inc. CLS | 100 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| SambaNova Systems picked | 90 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 13 * |
| Cirrus Logic Inc CRUS | 78 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| MatX picked | 72 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 2 * |
| Eliyan | 71 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Hewlett Packard Enterprise Company HPE | 68 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Cerebras Systems picked | 63 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Broadcom Inc. AVGO | 63 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Lightmatter picked | 61 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 12 * |
| Skyworks Solutions Inc SWKS | 60 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| TE Connectivity plc TEL | 53 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Ambiq Micro, Inc. AMBQ | 47 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 5 * |
| Silicon Labs SLAB | 46 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| OpenAI | 43 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| d-Matrix picked | 43 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| SiTime SITM | 41 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Analog Devices ADI | 40 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Marvell Technology MRVL | 39 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| RTX Corporation RTX | 39 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Super Micro Computer, Inc. SMCI | 37 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Fractile picked | 35 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 3 * |
| Microsoft Corp MSFT | 33 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Texas Instruments Incorporated TXN | 33 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Lockheed Martin Corp. LMT | 29 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Mobileye MBLY | 24 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Advanced Energy Industries Inc AEIS | 23 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Waymo | 21 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Lattice Semiconductor Corp LSCC | 21 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Nebius NBIS | 20 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Ametek, Inc. AME | 19 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| IonQ, Inc. IONQ | 19 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| indie Semiconductor INDI | 18 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 2 * |
| Anthropic | 16 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Rocket Lab Corporation RKLB | 16 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| PsiQuantum | 15 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 2 * |
| Ethernovia | 14 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Microchip Technology Inc MCHP | 14 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Mercury Systems Inc. MRCY | 13 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
Changes in hiring
None so far for this theme, its companies or its keywords. A company needs 14 days of tracking first.
Postings that mention its keywords (3,827, newest first)
| Title | Company | Role | Location | First seen | Status |
|---|---|---|---|---|---|
| Software Engineer, System Verification, Graviton Team | Amazon.Com Inc | Software engineering Mid level | Haifa, Haifa, ISR; Tel Aviv-Yafo, Tel Aviv, ISR | Open | |
| Hardware Support Engineer, RDPI Global Engineering Hardware Development | Amazon.Com Inc | Customer success & support Mid level | Westborough, Massachusetts, USA | Open | |
| Sr. RF Test Systems Development Engineer, Avionics Verification and Test, Amazon Leo | Amazon.Com Inc | Hardware & electrical engineering Senior | Redmond, Washington, USA | Open | |
| ASIC Engineer Intern, Summer 2027 | Amazon.Com Inc | Chip design (ASIC / RTL / verification / physical design) Intern | Sunnyvale, California, USA | Open | |
| ASIC Engineer Early Career - 2027, Project Leo | Amazon.Com Inc | Chip design (ASIC / RTL / verification / physical design) Entry level | Redmond, Washington, USA; San Diego, California, USA; Cupertino, California, USA | Open | |
| Sr. Site Technical Manager, Devices Postponement Operations (DPO) | Amazon.Com Inc | Operations & administration Manager | Flower Mound, Texas, USA | Open | |
| Hardware Development Engineer Intern, Summer 2027 | Amazon.Com Inc | Hardware & electrical engineering Intern | Sunnyvale, California, USA; North Reading, Massachusetts, USA; Hawthorne, California, USA | Open | |
| Manufacturing Tooling & Test Equipment Design Engineer | Amazon.Com Inc | Mechanical engineering Mid level | Redmond, Washington, USA | Open | |
| Hardware Development Engineer Intern , Winter 2027 | Amazon.Com Inc | Hardware & electrical engineering Intern | Bellevue, Washington, USA | Open | |
| Junior Formal Verification Engineer, Annapurna Labs | Amazon.Com Inc | Chip design (ASIC / RTL / verification / physical design) Entry level | Haifa, Haifa, ISR | Open | |
| ASIC Formal Verification Engineer I, Annapurna Labs | Amazon.Com Inc | Chip design (ASIC / RTL / verification / physical design) Entry level | Austin, Texas, USA; Cupertino, California, USA | Open | |
| ASIC Formal Verification Engineer I, Annapurna Labs | Amazon.Com Inc | Chip design (ASIC / RTL / verification / physical design) Entry level | Austin, Texas, USA; Cupertino, California, USA | Open | |
| MLA Design Verification Engineer I, Annapurna Labs | Amazon.Com Inc | Chip design (ASIC / RTL / verification / physical design) Entry level | Cupertino, California, USA | Open | |
| Sr. Manager, Post-Silicon Eng, AWS Hardware Engineering Services | Amazon.Com Inc | Chip design (ASIC / RTL / verification / physical design) Manager | Seattle, Washington, USA | Open | |
| HW Test Development Engineer, Amazon LEO | Amazon.Com Inc | Test, quality & reliability Mid level | Redmond, Washington, USA | Closed 23 Nov 2026 | |
| PCIe System Integration Engineer | Amazon.Com Inc | Hardware & electrical engineering Mid level | Haifa, Haifa, ISR | Open | |
| Senior Manager , Analog IP Design , Analog IP Design | Amazon.Com Inc | Hardware & electrical engineering Manager | Haifa, Haifa, ISR; Tel Aviv-Yafo, Tel Aviv, ISR | Open | |
| Formal Verification Engineer, Annapurna Labs | Amazon.Com Inc | Chip design (ASIC / RTL / verification / physical design) Mid level | Haifa, Haifa, ISR; Tel Aviv-Yafo, Tel Aviv, ISR | Open | |
| Senior Electrical Engineer, Amazon Robotics | Amazon.Com Inc | Robotics & autonomy Senior | North Reading, Massachusetts, USA; Westborough, Massachusetts, USA | Open | |
| Actuator Systems Engineer, Fauna | Amazon.Com Inc | Robotics & autonomy Mid level | New York, New York, USA | Open | |
| Sr. Manager, Foundation IP (Standard Cells & Memories),, Annapurna Labs | Amazon.Com Inc | Hardware & electrical engineering Manager | Austin, Texas, USA; San Diego, California, USA; Cupertino, California, USA | Open | |
| Senior SerDes Characterization Engineer | Amazon.Com Inc | Chip design (ASIC / RTL / verification / physical design) Senior | Haifa, Haifa, ISR | Open | |
| Chip Design Engineer, Nitro Team | Amazon.Com Inc | Chip design (ASIC / RTL / verification / physical design) Mid level | Haifa, Haifa, ISR; Tel Aviv-Yafo, Tel Aviv, ISR | Open | |
| Senior Hardware Development Engineer, AWS Mainstream Compute | Amazon.Com Inc | Hardware & electrical engineering Senior | Seattle, Washington, USA; Cupertino, California, USA | Open | |
| Design Verification Engineer, Silicon and Systems Group | Amazon.Com Inc | Chip design (ASIC / RTL / verification / physical design) Mid level | Bengaluru, Karnataka, IND | Open |