Measures activity, not value. Not investment advice.
Open postings mentioning its keywords
What it follows
Keywords (12)
- AI accelerators
- ASIC
- Chiplets
- Computer architecture
- Design verification
- GPU kernels
- HBM
- MLIR
- Network-on-chip
- Physical design
- RTL design
- Tapeout
Companies
Companies behind it (30 days, every tracked company)
Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026; until then no percent is shown.
| Company | Open mentions | Change | New mentions |
|---|---|---|---|
| Amazon.Com Inc AMZN | 1,016 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 17 * |
| Qualcomm Inc QCOM | 305 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Micron Technology, Inc. MU | 288 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 3 * |
| Astera Labs ALAB | 280 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 11 * |
| Apple Inc. AAPL | 279 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Space Exploration Technologies Corp. SPCX | 227 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 2 * |
| Cisco Systems, Inc. CSCO | 213 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 2 * |
| Tenstorrent picked | 201 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 14 * |
| Etched picked | 116 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 2 * |
| Teradyne, Inc. TER | 106 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| Graphcore picked | 104 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| L3Harris Technologies, Inc. LHX | 103 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Celestica, Inc. CLS | 100 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| SambaNova Systems picked | 90 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 13 * |
| Cirrus Logic Inc CRUS | 78 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| MatX picked | 72 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 2 * |
| Eliyan | 71 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Hewlett Packard Enterprise Company HPE | 68 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Cerebras Systems picked | 63 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Broadcom Inc. AVGO | 63 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Lightmatter picked | 61 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 12 * |
| Skyworks Solutions Inc SWKS | 60 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| TE Connectivity plc TEL | 53 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Ambiq Micro, Inc. AMBQ | 47 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 5 * |
| Silicon Labs SLAB | 46 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| OpenAI | 43 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| d-Matrix picked | 43 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| SiTime SITM | 41 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Analog Devices ADI | 40 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Marvell Technology MRVL | 39 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| RTX Corporation RTX | 39 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Super Micro Computer, Inc. SMCI | 37 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Fractile picked | 35 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 3 * |
| Microsoft Corp MSFT | 33 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Texas Instruments Incorporated TXN | 33 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Lockheed Martin Corp. LMT | 29 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Mobileye MBLY | 24 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Advanced Energy Industries Inc AEIS | 23 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Waymo | 21 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Lattice Semiconductor Corp LSCC | 21 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Nebius NBIS | 20 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Ametek, Inc. AME | 19 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| IonQ, Inc. IONQ | 19 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| indie Semiconductor INDI | 18 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 2 * |
| Anthropic | 16 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Rocket Lab Corporation RKLB | 16 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| PsiQuantum | 15 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 2 * |
| Ethernovia | 14 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Microchip Technology Inc MCHP | 14 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Mercury Systems Inc. MRCY | 13 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
Changes in hiring
None so far for this theme, its companies or its keywords. A company needs 14 days of tracking first.
Postings that mention its keywords (3,762, newest first)
| Title | Company | Role | Location | First seen | Status |
|---|---|---|---|---|---|
| Design Verification Engineer, Amazon Leo | Amazon.Com Inc | Chip design (ASIC / RTL / verification / physical design) Mid level | Austin, Texas, USA; Irvine, California, USA; San Diego, California, USA | Open | |
| Engineering Manager - EDA Silicon Infrastructure, Annapurna ML | Amazon.Com Inc | Chip design (ASIC / RTL / verification / physical design) Manager | Austin, Texas, USA | Open | |
| Principal Design Verification Engineer , Annapurna Labs | Amazon.Com Inc | Chip design (ASIC / RTL / verification / physical design) Staff / principal | Cupertino, California, USA | Open | |
| HW Validation Engineer , Amazon Leo Hardware Development, Amazon Leo Hardware Development | Amazon.Com Inc | Hardware & electrical engineering Mid level | Redmond, Washington, USA | Closed 23 Nov 2026 | |
| Robotics Mechanical Engineer, AR - Applied Automation | Amazon.Com Inc | Robotics & autonomy Mid level | Westborough, Massachusetts, USA | Open | |
| ASIC NPI Planning, Amazon Leo | Amazon.Com Inc | Chip design (ASIC / RTL / verification / physical design) Mid level | Sunnyvale, California, USA; Bellevue, Washington, USA | Open | |
| MLA Design Verification Engineer I, Annapurna Labs | Amazon.Com Inc | Chip design (ASIC / RTL / verification / physical design) Entry level | Austin, Texas, USA; Cupertino, California, USA | Open | |
| ASIC Supply Chain Manager, Amazon Leo | Amazon.Com Inc | Supply chain & procurement Manager | Sunnyvale, California, USA | Open | |
| Robotics Electrical Engineer, Vulcan Stow | Amazon.Com Inc | Robotics & autonomy Mid level | Seattle, Washington, USA | Open | |
| ASIC Characterization Engineer, Silicon | Amazon.Com Inc | Chip design (ASIC / RTL / verification / physical design) Mid level | Sunnyvale, California, USA | Open | |
| Drone Avionics Electrical Engineer, Prime Air | Amazon.Com Inc | Robotics & autonomy Mid level | Seattle, Washington, USA | Open | |
| Sr. Drone Perception Systems Electrical Engineer, Prime Air | Amazon.Com Inc | Robotics & autonomy Senior | Seattle, Washington, USA | Open | |
| Verification Engineer, Graviton Team | Amazon.Com Inc | Chip design (ASIC / RTL / verification / physical design) Mid level | Haifa, Haifa, ISR; Tel Aviv-Yafo, Tel Aviv, ISR | Open | |
| FPGA Engineer, Amazon Leo for Government | Amazon.Com Inc | Chip design (ASIC / RTL / verification / physical design) Mid level | Northridge, California, USA | Open | |
| Sr MLA Design Verification Engineer, Cloud-Scale Machine Learning Acceleration - Annapurna Labs | Amazon.Com Inc | Chip design (ASIC / RTL / verification / physical design) Senior | Austin, Texas, USA; Cupertino, California, USA | Open | |
| Sr. ASIC Design Engineer, Amazon Leo | Amazon.Com Inc | Chip design (ASIC / RTL / verification / physical design) Senior | Austin, Texas, USA | Open | |
| Verification Team Lead, Graviton Team | Amazon.Com Inc | Hardware & electrical engineering Manager | Tel Aviv-Yafo, Tel Aviv, ISR | Open | |
| Sr. Physical Design Engineer, Annapurna Labs | Amazon.Com Inc | Chip design (ASIC / RTL / verification / physical design) Senior | Austin, Texas, USA; San Diego, California, USA; Cupertino, California, USA | Open | |
| SOC Top Level Physical Design Engineer, Annapurna Labs | Amazon.Com Inc | Chip design (ASIC / RTL / verification / physical design) Mid level | Austin, Texas, USA; San Diego, California, USA; Cupertino, California, USA | Open | |
| SOC Top Level Physical Design Engineer, Annapurna Labs | Amazon.Com Inc | Chip design (ASIC / RTL / verification / physical design) Mid level | Austin, Texas, USA; San Diego, California, USA; Cupertino, California, USA | Open | |
| ASIC Design Engineer, Satellite Communication | Amazon.Com Inc | Chip design (ASIC / RTL / verification / physical design) Mid level | San Diego, California, USA | Closed 23 Nov 2026 | |
| Senior Mixed-Signal Modeling Engineer, Leo RFIC | Amazon.Com Inc | Hardware & electrical engineering Senior | Sunnyvale, California, USA; Redmond, Washington, USA | Open | |
| Post Silicon Engineer , Amazon LEO | Amazon.Com Inc | Chip design (ASIC / RTL / verification / physical design) Mid level | Austin, Texas, USA | Closed 22 Nov 2026 | |
| Sr. Phased Array DSP & Digital Beamforming Architect, Payload Architecture Team | Amazon.Com Inc | Software engineering Senior | Redmond, Washington, USA | Open | |
| Senior SerDes Characterization Engineer | Amazon.Com Inc | Chip design (ASIC / RTL / verification / physical design) Senior | Haifa, Haifa, ISR | Open |