Chiplets and interconnect
Die-to-die links, chip-to-chip fabrics and high-speed I/O for AI systems.
Measures activity, not value. Not investment advice.
Open postings mentioning its keywords
What it follows
Keywords (12)
Companies
Companies behind it (30 days, every tracked company)
Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026; until then no percent is shown.
| Company | Open mentions | Change | New mentions |
|---|---|---|---|
| Amazon.Com Inc AMZN | 441 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 5 * |
| Astera Labs ALAB picked | 389 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 19 * |
| TE Connectivity plc TEL | 170 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 5 * |
| Celestica, Inc. CLS | 142 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Space Exploration Technologies Corp. SPCX | 141 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 4 * |
| Teradyne, Inc. TER | 123 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Eliyan picked | 85 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| Graphcore | 74 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Tenstorrent | 69 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 7 * |
| Super Micro Computer, Inc. SMCI | 64 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Ethernovia | 55 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Marvell Technology MRVL picked | 54 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Cisco Systems, Inc. CSCO | 48 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Etched | 46 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| Lightmatter | 44 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 7 * |
| SambaNova Systems | 39 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 2 * |
| Mobileye MBLY | 36 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| SiTime SITM | 33 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Ubiquiti Inc. UI | 33 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Everpure, Inc. P | 32 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Apptronik | 30 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| d-Matrix | 30 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Ametek, Inc. AME | 26 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Skyworks Solutions Inc SWKS | 26 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| OpenAI | 24 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Nebius NBIS | 21 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Cerebras Systems | 21 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Black Semiconductor | 20 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Mercury Systems Inc. MRCY | 18 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| CoreWeave CRWV | 16 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 2 * |
| Broadcom Inc. AVGO | 16 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Crusoe | 15 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| MatX | 15 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Penguin Solutions, Inc. PENG | 15 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Rocket Lab Corporation RKLB | 14 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Fractile | 13 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 3 * |
| Silicon Labs SLAB | 12 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Zipline | 12 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Micron Technology, Inc. MU | 11 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Zoox | 10 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| AST SpaceMobile, Inc. ASTS | 10 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Together AI | 9 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Lumai | 8 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| IonQ, Inc. IONQ | 7 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| Lambda | 7 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Figure AI | 7 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Waymo | 7 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Wayve | 7 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Ciena CIEN | 6 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Anthropic | 6 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
Changes in hiring
None so far for this theme, its companies or its keywords. A company needs 14 days of tracking first.
Postings that mention its keywords (1,679, newest first)
| Title | Company | Role | Location | First seen | Status |
|---|---|---|---|---|---|
| Chip Design Engineer, Graviton Chip Design Team | Amazon.Com Inc | Chip design (ASIC / RTL / verification / physical design) Mid level | Haifa, Haifa, ISR | Open | |
| Sr. Physical Design Engineer, Annapurna Labs | Amazon.Com Inc | Chip design (ASIC / RTL / verification / physical design) Senior | Austin, Texas, USA; Cupertino, California, USA | Open | |
| Sr. Signal Integrity and Power Integrity Engineer, Amazon Leo | Amazon.Com Inc | Hardware & electrical engineering Senior | Redmond, Washington, USA | Open | |
| Signal Integrity & Power Integrity Engineer, Amazon Leo | Amazon.Com Inc | Hardware & electrical engineering Mid level | Redmond, Washington, USA | Open | |
| Cloud Hardware Development Engineer, Storage , AWS Hardware Engineering, Hardware Engineering Services | Amazon.Com Inc | Hardware & electrical engineering Mid level | Denver, Colorado, USA | Open | |
| Cloud Hardware Development Engineer, Storage , AWS Hardware Engineering, Hardware Engineering Services | Amazon.Com Inc | Hardware & electrical engineering Mid level | Seattle, Washington, USA; Denver, Colorado, USA; Cupertino, California, USA | Open | |
| Sr. PCBA Manufacturing Test Engineer, Amazon Leo | Amazon.Com Inc | Manufacturing & production Senior | Bellevue, Washington, USA | Open | |
| Sr. PCBA Manufacturing Test Engineer, Amazon Leo, Electronic Supply Chain | Amazon.Com Inc | Supply chain & procurement Senior | Bellevue, Washington, USA | Open | |
| Sr. PCBA Aerospace Manufacturing Test Engineer, Amazon Leo | Amazon.Com Inc | Manufacturing & production Senior | Wisconsin, USA | Open | |
| Chip Design Engineer, Nitro Team | Amazon.Com Inc | Chip design (ASIC / RTL / verification / physical design) Mid level | Tel Aviv-Yafo, Tel Aviv, ISR | Open | |
| Senior Embedded Electrical Engineer, Manipulation Robotics | Amazon.Com Inc | Embedded & firmware Senior | North Reading, Massachusetts, USA | Open | |
| Hardware Development Engineer, Amazon Leo Customer Terminal Hardware Team | Amazon.Com Inc | Hardware & electrical engineering Mid level | Redmond, Washington, USA | Open | |
| Hardware Dev Engineer, Amazon Leo Customer Terminal Hardware Design | Amazon.Com Inc | Hardware & electrical engineering Mid level | Redmond, Washington, USA | Open | |
| Director, Analog IP Design , Analog IP Design | Amazon.Com Inc | Hardware & electrical engineering Director | Haifa, Haifa, ISR; Tel Aviv-Yafo, Tel Aviv, ISR | Open | |
| HW Engineering Manager, Leo Hardware Development | Amazon.Com Inc | Hardware & electrical engineering Manager | Redmond, Washington, USA; San Diego, California, USA | Open | |
| Sr HW Dev Engineer - Payload, Amazon Leo Hardware Development | Amazon.Com Inc | Hardware & electrical engineering Senior | Redmond, Washington, USA | Open | |
| HW Dev Engineer II - Payload, Amazon Leo Hardware Development | Amazon.Com Inc | Hardware & electrical engineering Mid level | Redmond, Washington, USA | Open | |
| HW Dev Engineer II -Payload, Amazon Leo Hardware Development | Amazon.Com Inc | Hardware & electrical engineering Mid level | Redmond, Washington, USA | Open | |
| HW Test Development Engineer, Amazon LEO | Amazon.Com Inc | Test, quality & reliability Mid level | Redmond, Washington, USA | Open | |
| HW Dev Engineer-Payload, Leo PAA Hardware | Amazon.Com Inc | Hardware & electrical engineering Mid level | Redmond, Washington, USA | Open | |
| HW Dev Engineer-Payload, Leo PAA Hardware | Amazon.Com Inc | Hardware & electrical engineering Mid level | Redmond, Washington, USA | Open | |
| Senior HW Dev Engineer-Payload, Hardware Development | Amazon.Com Inc | Hardware & electrical engineering Senior | Redmond, Washington, USA | Open | |
| Senior HW Dev Engineer-Payload, Leo PAA Hardware | Amazon.Com Inc | Hardware & electrical engineering Senior | Redmond, Washington, USA | Open | |
| Senior HW Dev Engineer-Payload, Leo PAA Hardware | Amazon.Com Inc | Hardware & electrical engineering Senior | Redmond, Washington, USA | Open | |
| Senior FPGA Engineer, Payload Hardware Development, Leo PAA Hardware | Amazon.Com Inc | Chip design (ASIC / RTL / verification / physical design) Senior | Redmond, Washington, USA | Open |