Chiplets and interconnect
Die-to-die links, chip-to-chip fabrics and high-speed I/O for AI systems.
Measures activity, not value. Not investment advice.
Open postings mentioning its keywords
What it follows
Keywords (12)
Companies
Companies behind it (30 days, every tracked company)
Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026; until then no percent is shown.
| Company | Open mentions | Change | New mentions |
|---|---|---|---|
| Amazon.Com Inc AMZN | 441 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 5 * |
| Astera Labs ALAB picked | 389 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 19 * |
| TE Connectivity plc TEL | 170 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 5 * |
| Celestica, Inc. CLS | 142 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Space Exploration Technologies Corp. SPCX | 141 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 4 * |
| Teradyne, Inc. TER | 123 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Eliyan picked | 85 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| Graphcore | 74 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Tenstorrent | 69 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 7 * |
| Super Micro Computer, Inc. SMCI | 64 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Ethernovia | 55 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Marvell Technology MRVL picked | 54 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Cisco Systems, Inc. CSCO | 48 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Etched | 46 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| Lightmatter | 44 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 7 * |
| SambaNova Systems | 39 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 2 * |
| Mobileye MBLY | 36 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| SiTime SITM | 33 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Ubiquiti Inc. UI | 33 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Everpure, Inc. P | 32 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Apptronik | 30 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| d-Matrix | 30 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Ametek, Inc. AME | 26 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Skyworks Solutions Inc SWKS | 26 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| OpenAI | 24 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Nebius NBIS | 21 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Cerebras Systems | 21 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Black Semiconductor | 20 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Mercury Systems Inc. MRCY | 18 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| CoreWeave CRWV | 16 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 2 * |
| Broadcom Inc. AVGO | 16 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Crusoe | 15 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| MatX | 15 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Penguin Solutions, Inc. PENG | 15 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Rocket Lab Corporation RKLB | 14 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Fractile | 13 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 3 * |
| Silicon Labs SLAB | 12 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Zipline | 12 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Micron Technology, Inc. MU | 11 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Zoox | 10 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| AST SpaceMobile, Inc. ASTS | 10 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Together AI | 9 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Lumai | 8 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| IonQ, Inc. IONQ | 7 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| Lambda | 7 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Figure AI | 7 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Waymo | 7 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Wayve | 7 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Ciena CIEN | 6 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Anthropic | 6 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
Changes in hiring
None so far for this theme, its companies or its keywords. A company needs 14 days of tracking first.
Postings that mention its keywords (1,679, newest first)
| Title | Company | Role | Location | First seen | Status |
|---|---|---|---|---|---|
| 11 - Senior Manager, Hardware Design Engineering | Celestica, Inc. | Hardware & electrical engineering Manager | Richardson, TX, US | Open | |
| Power Test Engineer, Hardware Design | Celestica, Inc. | Hardware & electrical engineering Mid level | Taipei, TPQ, TW | Open | |
| 07 - Engineer, Hardware Design | Celestica, Inc. | Hardware & electrical engineering Mid level | Taipei, TPQ, TW | Open | |
| Staff Engineer, Hardware Design | Celestica, Inc. | Hardware & electrical engineering Staff / principal | Austin, TX, US | Open | |
| Senior Lead Engineer, Digital Hardware Design (Advanced Technology Solutions) | Celestica, Inc. | Hardware & electrical engineering Senior | Penang, 07, MY | Open | |
| Senior Staff Engineer, Hardware Design | Celestica, Inc. | Hardware & electrical engineering Staff / principal | San Jose, CA, US | Open | |
| Senior Lead Digital Hardware Engineer (Advanced Technology Solutions) | Celestica, Inc. | Hardware & electrical engineering Senior | Penang, 07, MY | Open | |
| Staff Engineer, Software | Celestica, Inc. | Software engineering Staff / principal | Austin, TX, US | Open | |
| Power Design Engineer | Celestica, Inc. | Mechanical engineering Mid level | Austin, TX, US | Open | |
| Senior Staff Engineer, Power Design | Celestica, Inc. | Software engineering Staff / principal | Austin, TX, US | Open | |
| Power Test Associate Engineer, Hardware Design | Celestica, Inc. | Hardware & electrical engineering Entry level | Taipei, TPQ, TW | Open | |
| Senior Power Design Engineer | Celestica, Inc. | Mechanical engineering Senior | Taipei, TPQ, TW | Open | |
| Senior Lead, DFM and Process Engineer | Celestica, Inc. | Process engineering (semiconductor / materials) Senior | Richardson, TX, US | Open | |
| Senior Staff Engineer, Hardware Design - (TPL) | Celestica, Inc. | Hardware & electrical engineering Staff / principal | Austin, TX, US | Open | |
| 07 - Engineer, Hardware Design | Celestica, Inc. | Hardware & electrical engineering Mid level | Taipei, TPQ, TW | Open | |
| 09 - Senior Lead Engineer, Hardware Design | Celestica, Inc. | Hardware & electrical engineering Senior | Taipei, TPQ, TW | Open | |
| 07 - Engineer, Hardware Design | Celestica, Inc. | Hardware & electrical engineering Mid level | Taipei, TPQ, TW | Open | |
| Staff Engineer - Power Design | Celestica, Inc. | Software engineering Staff / principal | Austin, TX, US | Open | |
| Senior Staff Engineer, Software | Celestica, Inc. | Software engineering Staff / principal | Austin, TX, US | Open | |
| Senior Hardware Design Engineer (FPGA/CPLD) | Celestica, Inc. | Chip design (ASIC / RTL / verification / physical design) Senior | Penang, 07, MY | Open | |
| Director, Test Engineering | Celestica, Inc. | Test, quality & reliability Director | Penang, 07, MY | Open | |
| BSP Engineer (Linux Kernel, C) | Celestica, Inc. | Embedded & firmware Mid level | Austin, TX, US | Open | |
| Staff Engineer, Software - Open BMC | Celestica, Inc. | Software engineering Staff / principal | Austin, TX, US | Open | |
| 07 - Engineer, Hardware Design | Celestica, Inc. | Hardware & electrical engineering Mid level | Taipei, TPQ, TW | Open | |
| BIOS - Senior Lead Engineer, Software | Celestica, Inc. | Embedded & firmware Senior | Penang, 07, MY | Open |