Chiplets and interconnect
Die-to-die links, chip-to-chip fabrics and high-speed I/O for AI systems.
Measures activity, not value. Not investment advice.
Open postings mentioning its keywords
What it follows
Keywords (12)
Companies
Companies behind it (30 days, every tracked company)
Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026; until then no percent is shown.
| Company | Open mentions | Change | New mentions |
|---|---|---|---|
| Amazon.Com Inc AMZN | 441 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 5 * |
| Astera Labs ALAB picked | 389 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 19 * |
| TE Connectivity plc TEL | 170 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 5 * |
| Celestica, Inc. CLS | 142 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Space Exploration Technologies Corp. SPCX | 141 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 4 * |
| Teradyne, Inc. TER | 123 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Eliyan picked | 85 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| Graphcore | 74 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Tenstorrent | 69 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 7 * |
| Super Micro Computer, Inc. SMCI | 64 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Ethernovia | 55 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Marvell Technology MRVL picked | 54 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Cisco Systems, Inc. CSCO | 48 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Etched | 46 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| Lightmatter | 44 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 7 * |
| SambaNova Systems | 39 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 2 * |
| Mobileye MBLY | 36 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| SiTime SITM | 33 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Ubiquiti Inc. UI | 33 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Everpure, Inc. P | 32 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Apptronik | 30 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| d-Matrix | 30 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Ametek, Inc. AME | 26 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Skyworks Solutions Inc SWKS | 26 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| OpenAI | 24 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Nebius NBIS | 21 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Cerebras Systems | 21 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Black Semiconductor | 20 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Mercury Systems Inc. MRCY | 18 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| CoreWeave CRWV | 16 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 2 * |
| Broadcom Inc. AVGO | 16 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Crusoe | 15 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| MatX | 15 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Penguin Solutions, Inc. PENG | 15 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Rocket Lab Corporation RKLB | 14 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Fractile | 13 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 3 * |
| Silicon Labs SLAB | 12 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Zipline | 12 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Micron Technology, Inc. MU | 11 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Zoox | 10 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| AST SpaceMobile, Inc. ASTS | 10 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Together AI | 9 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Lumai | 8 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| IonQ, Inc. IONQ | 7 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| Lambda | 7 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Figure AI | 7 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Waymo | 7 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Wayve | 7 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Ciena CIEN | 6 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Anthropic | 6 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
Changes in hiring
None so far for this theme, its companies or its keywords. A company needs 14 days of tracking first.
Postings that mention its keywords (1,679, newest first)
| Title | Company | Role | Location | First seen | Status |
|---|---|---|---|---|---|
| Senior Firmware Engineer | Astera Labs | Embedded & firmware Senior | San Jose, California, United States | Open | |
| Technical Program Manager, Silicon Enablement and System Software | Tenstorrent | Program & project management Mid level | Toronto, Ontario, Canada; Vancouver, British Columbia, Canada | Open | |
| SI/PI Intern | Etched | Hardware & electrical engineering Intern | San Jose | Open | |
| Staff Mechanical Engineer – Torso | Apptronik | Mechanical engineering Staff / principal | Austin, TX | Open | |
| Staff/ Sr. Staff Product Engineer | Lightmatter | Software engineering Staff / principal | Mountain View, CA | Open | |
| Staff/ Sr. Staff Product Engineer | Lightmatter | Software engineering Staff / principal | Toronto, ON | Open | |
| Sr Staff Technical Program Manager | Lightmatter | Program & project management Staff / principal | Mountain View, CA | Open | |
| Principal Analog/Mixed Signal Architect | Lightmatter | Software engineering Staff / principal | Boston, MA; Mountain View, CA | Open | |
| Principal Analog/Mixed Signal Architect | Lightmatter | Software engineering Staff / principal | Toronto, ON | Open | |
| FPGA Firmware Engineer | OSI Systems Inc | Chip design (ASIC / RTL / verification / physical design) Mid level | Richardson, Texas | Open | |
| Sr FPGA Engineer | OSI Systems Inc | Chip design (ASIC / RTL / verification / physical design) Senior | Richardson, Texas | Open | |
| FPGA Firmware Engineer | OSI Systems Inc | Chip design (ASIC / RTL / verification / physical design) Mid level | Richardson, Texas | Open | |
| Embedded Software Engineer 3 | OSI Systems Inc | Embedded & firmware Mid level | Richardson, Texas | Open | |
| Embedded Software Engineer 3 | OSI Systems Inc | Embedded & firmware Mid level | Richardson, Texas | Open | |
| Sr Embedded Software Engineer | OSI Systems Inc | Embedded & firmware Senior | Richardson, Texas | Open | |
| Senior RF Digital Payload Engineer I Pipeline | Rocket Lab Corporation | Hardware & electrical engineering Senior | Long Beach, CA | Open | |
| Senior RF Digital Payload Engineer II Pipeline | Rocket Lab Corporation | Hardware & electrical engineering Senior | Long Beach, CA | Open | |
| Senior PCB Layout Engineer I | Rocket Lab Corporation | Hardware & electrical engineering Senior | Long Beach, CA | Open | |
| Senior FPGA Engineer II | Rocket Lab Corporation | Chip design (ASIC / RTL / verification / physical design) Senior | Chantilly, VA | Open | |
| Senior FPGA Engineer II | Rocket Lab Corporation | Chip design (ASIC / RTL / verification / physical design) Senior | Long Beach, CA | Open | |
| Principal Electrical Engineer | Rocket Lab Corporation | Hardware & electrical engineering Staff / principal | Tucson, AZ | Open | |
| Principal Avionics Engineer - Neutron | Rocket Lab Corporation | Electrical power & energy Staff / principal | Auckland, NZ | Open | |
| Harness Engineer II | Rocket Lab Corporation | Hardware & electrical engineering Mid level | Long Beach, CA | Open | |
| Harness Engineer I | Rocket Lab Corporation | Hardware & electrical engineering Entry level | Long Beach, CA | Open | |
| Avionics Engineer II - Design | Rocket Lab Corporation | Hardware & electrical engineering Mid level | Auckland, NZ | Open |