Chiplets and interconnect
Die-to-die links, chip-to-chip fabrics and high-speed I/O for AI systems.
Measures activity, not value. Not investment advice.
Open postings mentioning its keywords
What it follows
Keywords (12)
Companies
Companies behind it (30 days, every tracked company)
Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026; until then no percent is shown.
| Company | Open mentions | Change | New mentions |
|---|---|---|---|
| Amazon.Com Inc AMZN | 441 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 5 * |
| Astera Labs ALAB picked | 389 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 19 * |
| TE Connectivity plc TEL | 170 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 5 * |
| Celestica, Inc. CLS | 142 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Space Exploration Technologies Corp. SPCX | 141 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 4 * |
| Teradyne, Inc. TER | 123 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Eliyan picked | 85 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| Graphcore | 74 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Tenstorrent | 69 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 7 * |
| Super Micro Computer, Inc. SMCI | 64 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Ethernovia | 55 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Marvell Technology MRVL picked | 54 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Cisco Systems, Inc. CSCO | 48 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Etched | 46 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| Lightmatter | 44 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 7 * |
| SambaNova Systems | 39 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 2 * |
| Mobileye MBLY | 36 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| SiTime SITM | 33 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Ubiquiti Inc. UI | 33 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Everpure, Inc. P | 32 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Apptronik | 30 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| d-Matrix | 30 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Ametek, Inc. AME | 26 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Skyworks Solutions Inc SWKS | 26 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| OpenAI | 24 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Nebius NBIS | 21 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Cerebras Systems | 21 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Black Semiconductor | 20 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Mercury Systems Inc. MRCY | 18 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| CoreWeave CRWV | 16 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 2 * |
| Broadcom Inc. AVGO | 16 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Crusoe | 15 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| MatX | 15 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Penguin Solutions, Inc. PENG | 15 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Rocket Lab Corporation RKLB | 14 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Fractile | 13 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 3 * |
| Silicon Labs SLAB | 12 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Zipline | 12 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Micron Technology, Inc. MU | 11 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Zoox | 10 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| AST SpaceMobile, Inc. ASTS | 10 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Together AI | 9 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Lumai | 8 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| IonQ, Inc. IONQ | 7 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| Lambda | 7 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Figure AI | 7 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Waymo | 7 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Wayve | 7 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Ciena CIEN | 6 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Anthropic | 6 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
Changes in hiring
None so far for this theme, its companies or its keywords. A company needs 14 days of tracking first.
Postings that mention its keywords (1,679, newest first)
| Title | Company | Role | Location | First seen | Status |
|---|---|---|---|---|---|
| Staff Signal Integrity Engineer - Product Development and R&D | TE Connectivity plc | Hardware & electrical engineering Staff / principal | HERMOSILLO SONORA, SON, MX, 83174 | Open | |
| Senior Electronics Hardware Design Engineer | Seagate Technology Holdings PLC | Hardware & electrical engineering Senior | Samut Prakan, TH | Open | |
| Edge IoT Engineering Intern, Electronics Design Engineering | Seagate Technology Holdings PLC | Other Intern | Taipei, TW | Open | |
| Mechanical Design Senior Staff Engineer | Seagate Technology Holdings PLC | Mechanical engineering Staff / principal | Bloomington, MN, US | Open | |
| Senior Electronic Design Engineer | Deere & Company | Mechanical engineering Senior | Torrance, California, US, 90503 | Open | |
| Senior Electrical Engineer - Power Systems | Momentus Inc. | Electrical power & energy Senior | San Jose, CA, United States | Open | |
| Electrical Engineer - Avionics | Momentus Inc. | Hardware & electrical engineering Mid level | San Jose, CA, United States | Open | |
| Senior/Staff Embedded Engineer | CeriBell, Inc. | Embedded & firmware Staff / principal | Sunnyvale, CA | Open | |
| Staff Validation Engineer - Wireless Radio Lead | Ambiq Micro, Inc. | Test, quality & reliability Staff / principal | Austin, Texas, United States | Open | |
| Sr. Engineer - Analog Validation | Ambiq Micro, Inc. | Software engineering Senior | Austin, Texas, United States | Open | |
| SoC Architect | Ambiq Micro, Inc. | Chip design (ASIC / RTL / verification / physical design) Mid level | Singapore | Open | |
| Principal Solutions Architect Req #1341 | ePlus Inc | Solutions & sales engineering Staff / principal | Irvine, CA | Open | |
| Principal Solutions Architect Req #1048 | ePlus Inc | Solutions & sales engineering Staff / principal | San Ramon, CA | Open | |
| Senior RF/EMC Engineer | Alarm.com Holdings, Inc. | Hardware & electrical engineering Senior | Tysons, Virginia | Open | |
| Senior Flight Software Engineer | Planet Labs PBC | Software engineering Senior | San Francisco, CA | Open | |
| PCB Design Engineer | Planet Labs PBC | Hardware & electrical engineering Mid level | San Francisco, CA | Closed 21 Nov 2026 | |
| Electrical Engineer | Planet Labs PBC | Hardware & electrical engineering Mid level | San Francisco, CA | Open | |
| Electrical Engineer | Planet Labs PBC | Hardware & electrical engineering Mid level | San Francisco, CA | Open | |
| Staff Design Engineer, IC Layout | Impinj, Inc. | Mechanical engineering Staff / principal | Remote, USA | Open | |
| Senior Staff Post Silicon Validation Engineer - Global Operations | Cirrus Logic Inc | Chip design (ASIC / RTL / verification / physical design) Staff / principal | Austin, Texas | Open | |
| Senior PCB Designer | Cirrus Logic Inc | Hardware & electrical engineering Senior | Austin, Texas | Open | |
| Spacecraft Power Systems Engineer (Mid/Senior) | AST SpaceMobile, Inc. | Electrical power & energy Senior | Lanham, Maryland, United States | Open | |
| SoC Validation Engineer | AST SpaceMobile, Inc. | Chip design (ASIC / RTL / verification / physical design) Mid level | Edinburgh, Scotland, United Kingdom | Open | |
| Senior FPGA Team Lead | AST SpaceMobile, Inc. | Chip design (ASIC / RTL / verification / physical design) Manager | Riga, Latvia | Open | |
| RAN Validation Engineer | AST SpaceMobile, Inc. | Test, quality & reliability Mid level | Hyderabad, Telangana, India | Open |