Chiplets and interconnect
Die-to-die links, chip-to-chip fabrics and high-speed I/O for AI systems.
Measures activity, not value. Not investment advice.
Open postings mentioning its keywords
What it follows
Keywords (12)
Companies
Companies behind it (30 days, every tracked company)
Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026; until then no percent is shown.
| Company | Open mentions | Change | New mentions |
|---|---|---|---|
| Amazon.Com Inc AMZN | 441 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 5 * |
| Astera Labs ALAB picked | 389 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 19 * |
| TE Connectivity plc TEL | 170 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 5 * |
| Celestica, Inc. CLS | 142 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Space Exploration Technologies Corp. SPCX | 141 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 4 * |
| Teradyne, Inc. TER | 123 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Eliyan picked | 85 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| Graphcore | 74 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Tenstorrent | 69 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 7 * |
| Super Micro Computer, Inc. SMCI | 64 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Ethernovia | 55 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Marvell Technology MRVL picked | 54 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Cisco Systems, Inc. CSCO | 48 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Etched | 46 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| Lightmatter | 44 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 7 * |
| SambaNova Systems | 39 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 2 * |
| Mobileye MBLY | 36 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| SiTime SITM | 33 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Ubiquiti Inc. UI | 33 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Everpure, Inc. P | 32 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Apptronik | 30 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| d-Matrix | 30 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Ametek, Inc. AME | 26 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Skyworks Solutions Inc SWKS | 26 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| OpenAI | 24 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Nebius NBIS | 21 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Cerebras Systems | 21 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Black Semiconductor | 20 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Mercury Systems Inc. MRCY | 18 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| CoreWeave CRWV | 16 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 2 * |
| Broadcom Inc. AVGO | 16 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Crusoe | 15 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| MatX | 15 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Penguin Solutions, Inc. PENG | 15 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Rocket Lab Corporation RKLB | 14 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Fractile | 13 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 3 * |
| Silicon Labs SLAB | 12 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Zipline | 12 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Micron Technology, Inc. MU | 11 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Zoox | 10 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| AST SpaceMobile, Inc. ASTS | 10 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Together AI | 9 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Lumai | 8 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| IonQ, Inc. IONQ | 7 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| Lambda | 7 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Figure AI | 7 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Waymo | 7 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Wayve | 7 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Ciena CIEN | 6 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Anthropic | 6 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
Changes in hiring
None so far for this theme, its companies or its keywords. A company needs 14 days of tracking first.
Postings that mention its keywords (1,679, newest first)
| Title | Company | Role | Location | First seen | Status |
|---|---|---|---|---|---|
| Senior Design Verification Engineer | Silicon Labs | Chip design (ASIC / RTL / verification / physical design) Senior | Austin | Open | |
| Chip Lead | Silicon Labs | Chip design (ASIC / RTL / verification / physical design) Senior | Austin | Open | |
| RF Validation Engineer II | Silicon Labs | Hardware & electrical engineering Mid level | Austin | Open | |
| RF Validation Engineer I | Silicon Labs | Hardware & electrical engineering Entry level | Austin | Open | |
| Static Timing Analysis Engineer | Silicon Labs | Chip design (ASIC / RTL / verification / physical design) Mid level | Austin | Open | |
| Lead Engineer - SW Design (Classic/BLE & LE Audio) | Silicon Labs | Software engineering Senior | Hyderabad | Open | |
| Senior Engineer - SW Design (Classic/BLE & LE Audio) | Silicon Labs | Software engineering Senior | Hyderabad | Open | |
| Lead Engineer – IC Verification | Silicon Labs | Software engineering Senior | Hyderabad | Open | |
| Lead Engineer – RTL Design (Wireless Modem IP) | Silicon Labs | Chip design (ASIC / RTL / verification / physical design) Senior | Hyderabad | Open | |
| Lead Engineer - SW Design - RAIL | Silicon Labs | Software engineering Senior | Hyderabad | Open | |
| Staff/ Senior Staff QA Engineer (C, C++, Python, CXL, PCIE) | Marvell Technology | Test, quality & reliability Staff / principal | Hyderabad | Open | |
| Staff Engineer - Embedded Firmware Development - CXL / PCIe / Near-memory accelerator / Memory-Expansion Controllers | Marvell Technology | Embedded & firmware Staff / principal | Santa Clara, CA | Open | |
| Principal Engineer , Software/Firmware - CXL/PCIe | Marvell Technology | Embedded & firmware Staff / principal | Santa Clara, CA | Open | |
| Signal Integrity Intern, MS – 2027 Co-Op | Marvell Technology | Hardware & electrical engineering Intern | CA-ON - Toronto - TOR | Open | |
| Principal Validation and Hardware Design Engineer (SerDes) | Marvell Technology | Chip design (ASIC / RTL / verification / physical design) Staff / principal | Santa Clara, CA | Open | |
| Staff Firmware/Software Engineer - Embedded SoC/Microcontroller/DSP/SERDES/AEC/MicroLED/ODSP/PHY/AI Connectivity | Marvell Technology | Chip design (ASIC / RTL / verification / physical design) Staff / principal | Santa Clara, CA | Open | |
| Senior Principal Engineer, Hardware Application Engineering — Signal Integrity & Power Integrity | Marvell Technology | Solutions & sales engineering Staff / principal | Santa Clara, CA | Open | |
| Signal and Power Integrity Intern, MS - Summer 2027 | Marvell Technology | Hardware & electrical engineering Intern | Santa Clara, CA | Open | |
| Staff CAD Engineer (Power Signal Integrity) | Marvell Technology | Hardware & electrical engineering Staff / principal | Bangalore | Open | |
| Network Platform Development Engineer (PHY, Switch, SAI, NOS/SDK, L1/L2 Development, C, Linux Kernel, MACsec, SerDes) | Marvell Technology | Chip design (ASIC / RTL / verification / physical design) Mid level | Bangalore | Open | |
| High-Speed SerDes & Mixed-Signal Validation Engineer | Marvell Technology | Chip design (ASIC / RTL / verification / physical design) Mid level | Pavia, Italy | Open | |
| Package Design, Signal and Power Integrity Senior Staff Engineer | Marvell Technology | Chip design (ASIC / RTL / verification / physical design) Staff / principal | Santa Clara, CA | Open | |
| Hardware Signal Integrity Intern, MS - Summer 2027 | Marvell Technology | Hardware & electrical engineering Intern | Santa Clara, CA | Open | |
| Principal Engineer, Signal Integrity | Marvell Technology | Hardware & electrical engineering Staff / principal | Santa Clara, CA | Open | |
| Principal Engineer, Power Integrity | Marvell Technology | Hardware & electrical engineering Staff / principal | Santa Clara, CA | Open |