StockMacro
Company, fund or insider

Help

Menu

Job search

Chiplets and interconnect

Die-to-die links, chip-to-chip fabrics and high-speed I/O for AI systems.

Measures activity, not value. Not investment advice.

Open postings mentioning its keywords

Open postings with any of the theme's keywords: 0 on 20 Sep 2026 (tracking began), 2,920 on 24 Nov 2026, highest 2,920. Lines for the 6 largest of 12 keywords.

What it follows

Keywords (12)

Companies

Companies behind it (30 days, every tracked company)

Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026; until then no percent is shown.

Company Open mentions Change New mentions
Amazon.Com Inc AMZN 447 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 13 *
Astera Labs ALAB picked 393 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 23 *
TE Connectivity plc TEL 171 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 7 *
Celestica, Inc. CLS 142 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Space Exploration Technologies Corp. SPCX 141 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 4 *
Teradyne, Inc. TER 123 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Eliyan picked 85 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 1 *
Graphcore 72 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Tenstorrent 71 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 9 *
Super Micro Computer, Inc. SMCI 64 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Apple Inc. AAPL 56 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
L3Harris Technologies, Inc. LHX 56 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Ethernovia 55 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Marvell Technology MRVL picked 54 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Cisco Systems, Inc. CSCO 54 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Etched 46 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 1 *
Lightmatter 45 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 8 *
SambaNova Systems 39 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 2 *
Mobileye MBLY 36 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
SiTime SITM 33 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Ubiquiti Inc. UI 33 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Everpure, Inc. P 32 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Qualcomm Inc QCOM 31 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Apptronik 30 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 1 *
d-Matrix 30 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Ametek, Inc. AME 26 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Skyworks Solutions Inc SWKS 26 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
OpenAI 24 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Cerebras Systems 21 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Nebius NBIS 20 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Black Semiconductor 20 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Mercury Systems Inc. MRCY 19 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 1 *
CoreWeave CRWV 16 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 2 *
Broadcom Inc. AVGO 16 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Crusoe 15 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
MatX 15 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Penguin Solutions, Inc. PENG 15 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Rocket Lab Corporation RKLB 14 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Fractile 13 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 3 *
Hewlett Packard Enterprise Company HPE 13 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Silicon Labs SLAB 12 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Zipline 12 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
BlackSky Technology Inc. BKSY 12 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Voyager Technologies, Inc. VOYG 12 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Micron Technology, Inc. MU 11 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Zoox 10 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
AST SpaceMobile, Inc. ASTS 10 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Together AI 9 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Lumai 8 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
IonQ, Inc. IONQ 7 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 1 *

Changes in hiring

None so far for this theme, its companies or its keywords. A company needs 14 days of tracking first.

Postings that mention its keywords (1,891, newest first)

Title Company Role Location First seen Status
Semiconductor Product Engineer Fractile Software engineering Mid level Kaohsiung City, Taiwan Open
Semiconductor Test Engineering Team Leader Fractile Test, quality & reliability Manager London, UK; Bristol, UK Open
Senior/Principal Physical Design Engineer Fractile Chip design (ASIC / RTL / verification / physical design) Staff / principal London, UK; Bristol, UK Open
Technical Program Manager, Silicon/Hardware MatX Program & project management Mid level Mountain View (HQ) or Remote Open
Senior SoC Power Analysis & Optimization Engineer MatX Chip design (ASIC / RTL / verification / physical design) Senior Mountain View (HQ) or Remote Open
Hardware Lab Manager MatX Hardware & electrical engineering Manager Mountain View Open
Hardware Systems Electrical Engineer MatX Hardware & electrical engineering Mid level Mountain View (HQ) or Remote Open
SOC Integration Engineer MatX Chip design (ASIC / RTL / verification / physical design) Mid level Mountain View Open
Hardware System Diagnostic Engineer MatX Hardware & electrical engineering Mid level Mountain View (HQ) or Remote Open
Emulation Engineer MatX Chip design (ASIC / RTL / verification / physical design) Mid level Israel Open
SOC Micro-Architect and RTL Designer MatX Chip design (ASIC / RTL / verification / physical design) Mid level Mountain View (HQ) or Remote Open
Silicon Design-for-Test (DFT) Engineer MatX Chip design (ASIC / RTL / verification / physical design) Mid level Mountain View (HQ) or Remote Open
Head of Platform Software d-Matrix Software engineering Director Santa Clara Open
Senior Staff Inference Performance Engineer d-Matrix ML / AI Staff / principal Santa Clara; Remote Open
Sr Staff Site Reliability Engineer, AI Infrastructure d-Matrix ML / AI Staff / principal Santa Clara Open
Director Site Reliability Engineer, AI Infrastructure d-Matrix ML / AI Director Santa Clara Open
Sr. Staff PCB Design Engineer d-Matrix Hardware & electrical engineering Staff / principal Santa Clara Open
Staff Analog Design Engineer, TX/RX Datapath d-Matrix Chip design (ASIC / RTL / verification / physical design) Staff / principal Santa Clara Open
Staff Analog Design Engineer, SerDes Clocking d-Matrix Chip design (ASIC / RTL / verification / physical design) Staff / principal Santa Clara Open
Sr. Staff Hardware Qualification Engineer d-Matrix Hardware & electrical engineering Staff / principal Santa Clara Open
Staff Analog Design Engineer d-Matrix Chip design (ASIC / RTL / verification / physical design) Staff / principal Santa Clara Open
High-Speed Peripheral Firmware Lead Etched Embedded & firmware Senior San Jose Closed 21 Nov 2026
Infrastructure Engineer - Labs Etched SRE, DevOps & infrastructure Mid level San Jose Open
Site Reliability Engineer - Fleet Command & Control Etched SRE, DevOps & infrastructure Mid level San Jose Open
Test Architect, Factory Acceleration Etched Test, quality & reliability Mid level San Jose Open