StockMacro
Company, fund or insider

Help

Menu

Job search

Chiplets and interconnect

Die-to-die links, chip-to-chip fabrics and high-speed I/O for AI systems.

Measures activity, not value. Not investment advice.

Open postings mentioning its keywords

Open postings with any of the theme's keywords: 1 on 11 Oct 2026, 2,920 on 24 Nov 2026, highest 2,920. Lines for the 6 largest of 12 keywords.

What it follows

Keywords (12)

Companies

Companies behind it (30 days, every tracked company)

Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026; until then no percent is shown.

Company Open mentions Change New mentions
Amazon.Com Inc AMZN 447 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 13 *
Astera Labs ALAB picked 393 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 23 *
TE Connectivity plc TEL 171 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 7 *
Celestica, Inc. CLS 142 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Space Exploration Technologies Corp. SPCX 141 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 4 *
Teradyne, Inc. TER 123 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Eliyan picked 85 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 1 *
Graphcore 72 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Tenstorrent 71 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 9 *
Super Micro Computer, Inc. SMCI 64 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Apple Inc. AAPL 56 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
L3Harris Technologies, Inc. LHX 56 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Ethernovia 55 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Marvell Technology MRVL picked 54 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Cisco Systems, Inc. CSCO 54 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Etched 46 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 1 *
Lightmatter 45 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 8 *
SambaNova Systems 39 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 2 *
Mobileye MBLY 36 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
SiTime SITM 33 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Ubiquiti Inc. UI 33 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Everpure, Inc. P 32 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Qualcomm Inc QCOM 31 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Apptronik 30 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 1 *
d-Matrix 30 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Ametek, Inc. AME 26 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Skyworks Solutions Inc SWKS 26 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
OpenAI 24 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Cerebras Systems 21 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Nebius NBIS 20 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Black Semiconductor 20 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Mercury Systems Inc. MRCY 19 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 1 *
CoreWeave CRWV 16 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 2 *
Broadcom Inc. AVGO 16 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Crusoe 15 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
MatX 15 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Penguin Solutions, Inc. PENG 15 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Rocket Lab Corporation RKLB 14 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Fractile 13 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 3 *
Hewlett Packard Enterprise Company HPE 13 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Silicon Labs SLAB 12 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Zipline 12 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
BlackSky Technology Inc. BKSY 12 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Voyager Technologies, Inc. VOYG 12 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Micron Technology, Inc. MU 11 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Zoox 10 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
AST SpaceMobile, Inc. ASTS 10 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Together AI 9 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Lumai 8 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
IonQ, Inc. IONQ 7 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 1 *

Changes in hiring

None so far for this theme, its companies or its keywords. A company needs 14 days of tracking first.

Postings that mention its keywords (1,891, newest first)

Title Company Role Location First seen Status
Senior Hardware Compute Architect (f/m/d) Black Semiconductor Hardware & electrical engineering Senior Aachen, Germany Open
Post-Silicon Validation Team Leader Fractile Chip design (ASIC / RTL / verification / physical design) Manager Bristol, UK Open
Senior Linux Kernel Driver Engineer Fractile Embedded & firmware Senior London, UK; Bristol, UK Open
Semiconductor Product Engineer Fractile Software engineering Mid level Kaohsiung City, Taiwan Open
Semiconductor Test Engineering Team Leader Fractile Test, quality & reliability Manager London, UK; Bristol, UK Open
Senior/Principal Physical Design Engineer Fractile Chip design (ASIC / RTL / verification / physical design) Staff / principal London, UK; Bristol, UK Open
Technical Program Manager, Silicon/Hardware MatX Program & project management Mid level Mountain View (HQ) or Remote Open
Senior SoC Power Analysis & Optimization Engineer MatX Chip design (ASIC / RTL / verification / physical design) Senior Mountain View (HQ) or Remote Open
Hardware Lab Manager MatX Hardware & electrical engineering Manager Mountain View Open
Hardware Systems Electrical Engineer MatX Hardware & electrical engineering Mid level Mountain View (HQ) or Remote Open
SOC Integration Engineer MatX Chip design (ASIC / RTL / verification / physical design) Mid level Mountain View Open
Hardware System Diagnostic Engineer MatX Hardware & electrical engineering Mid level Mountain View (HQ) or Remote Open
Emulation Engineer MatX Chip design (ASIC / RTL / verification / physical design) Mid level Israel Open
SOC Micro-Architect and RTL Designer MatX Chip design (ASIC / RTL / verification / physical design) Mid level Mountain View (HQ) or Remote Open
Silicon Design-for-Test (DFT) Engineer MatX Chip design (ASIC / RTL / verification / physical design) Mid level Mountain View (HQ) or Remote Open
Head of Platform Software d-Matrix Software engineering Director Santa Clara Open
Senior Staff Inference Performance Engineer d-Matrix ML / AI Staff / principal Santa Clara; Remote Open
Sr Staff Site Reliability Engineer, AI Infrastructure d-Matrix ML / AI Staff / principal Santa Clara Open
Director Site Reliability Engineer, AI Infrastructure d-Matrix ML / AI Director Santa Clara Open
Sr. Staff PCB Design Engineer d-Matrix Hardware & electrical engineering Staff / principal Santa Clara Open
Staff Analog Design Engineer, TX/RX Datapath d-Matrix Chip design (ASIC / RTL / verification / physical design) Staff / principal Santa Clara Open
Staff Analog Design Engineer, SerDes Clocking d-Matrix Chip design (ASIC / RTL / verification / physical design) Staff / principal Santa Clara Open
Sr. Staff Hardware Qualification Engineer d-Matrix Hardware & electrical engineering Staff / principal Santa Clara Open
Staff Analog Design Engineer d-Matrix Chip design (ASIC / RTL / verification / physical design) Staff / principal Santa Clara Open
High-Speed Peripheral Firmware Lead Etched Embedded & firmware Senior San Jose Closed 21 Nov 2026