Chiplets and interconnect
Die-to-die links, chip-to-chip fabrics and high-speed I/O for AI systems.
Measures activity, not value. Not investment advice.
Open postings mentioning its keywords
What it follows
Keywords (12)
Companies
Companies behind it (30 days, every tracked company)
Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026; until then no percent is shown.
| Company | Open mentions | Change | New mentions |
|---|---|---|---|
| Amazon.Com Inc AMZN | 441 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 5 * |
| Astera Labs ALAB picked | 389 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 19 * |
| TE Connectivity plc TEL | 170 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 5 * |
| Celestica, Inc. CLS | 142 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Space Exploration Technologies Corp. SPCX | 141 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 4 * |
| Teradyne, Inc. TER | 123 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Eliyan picked | 85 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| Graphcore | 74 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Tenstorrent | 69 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 7 * |
| Super Micro Computer, Inc. SMCI | 64 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Ethernovia | 55 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Marvell Technology MRVL picked | 54 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Cisco Systems, Inc. CSCO | 48 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Etched | 46 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| Lightmatter | 44 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 7 * |
| SambaNova Systems | 39 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 2 * |
| Mobileye MBLY | 36 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| SiTime SITM | 33 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Ubiquiti Inc. UI | 33 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Everpure, Inc. P | 32 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Apptronik | 30 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| d-Matrix | 30 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Ametek, Inc. AME | 26 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Skyworks Solutions Inc SWKS | 26 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| OpenAI | 24 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Nebius NBIS | 21 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Cerebras Systems | 21 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Black Semiconductor | 20 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Mercury Systems Inc. MRCY | 18 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| CoreWeave CRWV | 16 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 2 * |
| Broadcom Inc. AVGO | 16 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Crusoe | 15 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| MatX | 15 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Penguin Solutions, Inc. PENG | 15 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Rocket Lab Corporation RKLB | 14 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Fractile | 13 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 3 * |
| Silicon Labs SLAB | 12 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Zipline | 12 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Micron Technology, Inc. MU | 11 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Zoox | 10 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| AST SpaceMobile, Inc. ASTS | 10 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Together AI | 9 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Lumai | 8 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| IonQ, Inc. IONQ | 7 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| Lambda | 7 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Figure AI | 7 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Waymo | 7 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Wayve | 7 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Ciena CIEN | 6 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Anthropic | 6 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
Changes in hiring
None so far for this theme, its companies or its keywords. A company needs 14 days of tracking first.
Postings that mention its keywords (1,679, newest first)
| Title | Company | Role | Location | First seen | Status |
|---|---|---|---|---|---|
| Sr. Staff Physical Design Engineer | Lightmatter | Chip design (ASIC / RTL / verification / physical design) Staff / principal | Mountain View, CA | Open | |
| Sr. Staff Physical Design Engineer | Lightmatter | Chip design (ASIC / RTL / verification / physical design) Staff / principal | Boston, MA | Open | |
| Sr/Staff Digital Design Engineer | Lightmatter | Chip design (ASIC / RTL / verification / physical design) Staff / principal | Toronto, ON | Open | |
| Sr/Staff Digital Design Engineer | Lightmatter | Chip design (ASIC / RTL / verification / physical design) Staff / principal | Boston, MA | Open | |
| Sr/Staff Digital Design Engineer | Lightmatter | Chip design (ASIC / RTL / verification / physical design) Staff / principal | Mountain View, CA | Open | |
| Signal Integrity Engineer | Lightmatter | Hardware & electrical engineering Mid level | Mountain View, CA | Open | |
| Principal Hardware Systems Technical Lead | Lightmatter | Hardware & electrical engineering Staff / principal | Mountain View, CA | Closed 20 Nov 2026 | |
| Principal Field Application Engineer | Lightmatter | Solutions & sales engineering Staff / principal | Mountain View, CA | Open | |
| Power Integrity Engineer | Lightmatter | Hardware & electrical engineering Mid level | Mountain View, CA | Open | |
| Package Layout Engineer | Lightmatter | Chip design (ASIC / RTL / verification / physical design) Mid level | Mountain View, CA | Open | |
| Mixed-Signal Validation Engineer | Lightmatter | Test, quality & reliability Mid level | Mountain View, CA | Open | |
| Machine Learning Infrastructure Researcher | Lightmatter | ML / AI Mid level | Mountain View, CA | Open | |
| Machine Learning Infrastructure Researcher | Lightmatter | ML / AI Mid level | Toronto, ON | Open | |
| Hardware Systems Technical Lead | Lightmatter | Hardware & electrical engineering Senior | Mountain View, CA | Open | |
| Electro-Optic Link Hardware Engineer | Lightmatter | Hardware & electrical engineering Mid level | Boston, MA; Mountain View, CA | Open | |
| Electro-Optic Link Hardware Engineer | Lightmatter | Hardware & electrical engineering Mid level | Mountain View, CA | Open | |
| Digital Architect | Lightmatter | Software engineering Mid level | Toronto, ON | Open | |
| Digital Architect | Lightmatter | Software engineering Mid level | Boston, MA; Mountain View, CA | Open | |
| Analog/Mixed Signal Architect | Lightmatter | Software engineering Mid level | Boston, MA; Mountain View, CA | Open | |
| Analog/Mixed Signal Architect | Lightmatter | Software engineering Mid level | Toronto, ON | Open | |
| Analog IC Design Engineer, High-Speed | Lightmatter | Chip design (ASIC / RTL / verification / physical design) Mid level | Mountain View, CA | Open | |
| Analog IC Design Engineer, High-Speed | Lightmatter | Chip design (ASIC / RTL / verification / physical design) Mid level | Toronto, ON | Open | |
| Sr. Embedded Software/Firmware Engineer | Ethernovia | Embedded & firmware Senior | Canada-Remote | Open | |
| Sr. Embedded Software/Firmware Engineer | Ethernovia | Embedded & firmware Senior | United States - Remote | Open | |
| Software Engineer-Device Drivers | Ethernovia | Embedded & firmware Mid level | India | Open |