Chiplets and interconnect
Die-to-die links, chip-to-chip fabrics and high-speed I/O for AI systems.
Measures activity, not value. Not investment advice.
Open postings mentioning its keywords
What it follows
Keywords (12)
Companies
Companies behind it (30 days, every tracked company)
Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026; until then no percent is shown.
| Company | Open mentions | Change | New mentions |
|---|---|---|---|
| Amazon.Com Inc AMZN | 441 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 5 * |
| Astera Labs ALAB picked | 389 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 19 * |
| TE Connectivity plc TEL | 170 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 5 * |
| Celestica, Inc. CLS | 142 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Space Exploration Technologies Corp. SPCX | 141 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 4 * |
| Teradyne, Inc. TER | 123 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Eliyan picked | 85 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| Graphcore | 74 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Tenstorrent | 69 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 7 * |
| Super Micro Computer, Inc. SMCI | 64 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Ethernovia | 55 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Marvell Technology MRVL picked | 54 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Cisco Systems, Inc. CSCO | 48 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Etched | 46 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| Lightmatter | 44 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 7 * |
| SambaNova Systems | 39 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 2 * |
| Mobileye MBLY | 36 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| SiTime SITM | 33 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Ubiquiti Inc. UI | 33 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Everpure, Inc. P | 32 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Apptronik | 30 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| d-Matrix | 30 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Ametek, Inc. AME | 26 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Skyworks Solutions Inc SWKS | 26 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| OpenAI | 24 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Nebius NBIS | 21 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Cerebras Systems | 21 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Black Semiconductor | 20 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Mercury Systems Inc. MRCY | 18 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| CoreWeave CRWV | 16 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 2 * |
| Broadcom Inc. AVGO | 16 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Crusoe | 15 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| MatX | 15 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Penguin Solutions, Inc. PENG | 15 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Rocket Lab Corporation RKLB | 14 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Fractile | 13 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 3 * |
| Silicon Labs SLAB | 12 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Zipline | 12 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Micron Technology, Inc. MU | 11 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Zoox | 10 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| AST SpaceMobile, Inc. ASTS | 10 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Together AI | 9 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Lumai | 8 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| IonQ, Inc. IONQ | 7 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| Lambda | 7 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Figure AI | 7 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Waymo | 7 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Wayve | 7 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Ciena CIEN | 6 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Anthropic | 6 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
Changes in hiring
None so far for this theme, its companies or its keywords. A company needs 14 days of tracking first.
Postings that mention its keywords (1,679, newest first)
| Title | Company | Role | Location | First seen | Status |
|---|---|---|---|---|---|
| Sr. Customer Engineer | 1471 | SiTime | Solutions & sales engineering Senior | Taipei | Open | |
| Senior Engineer, Layout Design | 10022 | SiTime | Software engineering Senior | Japan | Open | |
| Senior Engineer, Layout Design | 10020 | SiTime | Software engineering Senior | Bangalore | Open | |
| Principal Physical Design Engineer | 10030 | SiTime | Chip design (ASIC / RTL / verification / physical design) Staff / principal | Arizona, Tempe; California, Santa Clara | Open | |
| Principal Hardware SI/PI Architect | 1447 | SiTime | Hardware & electrical engineering Staff / principal | California, Santa Clara | Open | |
| Principal FPGA Design Engineer | 1486 | SiTime | Chip design (ASIC / RTL / verification / physical design) Staff / principal | California, Santa Clara | Open | |
| Principal Engineer, Layout Design | 1758 | SiTime | Software engineering Staff / principal | California, Santa Clara | Open | |
| Principal Engineer, Infrastructure Hardware | 1661 | SiTime | Hardware & electrical engineering Staff / principal | Rijswijk | Open | |
| Principal Engineer, Infrastructure Hardware | 1627 | SiTime | Hardware & electrical engineering Staff / principal | California, Santa Clara; United States | Open | |
| Principal Engineer, Analog Mixed-Signal Design | 1703 | SiTime | Chip design (ASIC / RTL / verification / physical design) Staff / principal | Germany; Munich, Bavaria, Germany | Open | |
| Principal Applications Engineer | 10036 | SiTime | Solutions & sales engineering Staff / principal | Arizona, Tempe | Open | |
| Principal Applications Engineer | 10035 | SiTime | Solutions & sales engineering Staff / principal | Ottawa | Open | |
| Principal Applications Engineer | 10007 | SiTime | Solutions & sales engineering Staff / principal | United States | Open | |
| Principal Analog Mixed-Signal Engineer | 1530 | SiTime | Other Staff / principal | Rijswijk | Open | |
| Intern | 1805 | SiTime | Software engineering Intern | Arizona, Tempe | Open | |
| Hardware Engineer | 1599 | SiTime | Hardware & electrical engineering Mid level | Taipei; Taiwan | Open | |
| Director, Circuit Design Engineering | 1740 | SiTime | Chip design (ASIC / RTL / verification / physical design) Director | Rijswijk | Open | |
| Technical Lead Digital Design Engineer | Astera Labs | Chip design (ASIC / RTL / verification / physical design) Senior | San Jose, California, United States | Open | |
| Tech Lead, STA | Astera Labs | Chip design (ASIC / RTL / verification / physical design) Senior | Hyderabad, Telangana, India | Open | |
| Tech Lead Engineer, Design Verification | Astera Labs | Chip design (ASIC / RTL / verification / physical design) Senior | San Jose, California, United States | Open | |
| Tech Lead, Digital Design Engineer | Astera Labs | Chip design (ASIC / RTL / verification / physical design) Senior | San Jose, California, United States | Open | |
| Tech Lead Analog Mixed-Signal IC Layout Engineer | Astera Labs | Chip design (ASIC / RTL / verification / physical design) Senior | Singapore, Singapore | Open | |
| Teach Lead Physical Design Engineer | Astera Labs | Chip design (ASIC / RTL / verification / physical design) Senior | Singapore, Singapore | Open | |
| System Validation manager | Astera Labs | Test, quality & reliability Manager | Haifa District, Israel | Open | |
| System Validation Engineer - Haifa | Astera Labs | Test, quality & reliability Mid level | Haifa District, Israel | Open |