StockMacro
Company, fund or insider

Help

Menu

Job search

Chiplets and interconnect

Die-to-die links, chip-to-chip fabrics and high-speed I/O for AI systems.

Measures activity, not value. Not investment advice.

Open postings mentioning its keywords

Open postings with any of the theme's keywords: 1 on 11 Oct 2026, 2,920 on 24 Nov 2026, highest 2,920. Lines for the 6 largest of 12 keywords.

What it follows

Keywords (12)

Companies

Companies behind it (30 days, every tracked company)

Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026; until then no percent is shown.

Company Open mentions Change New mentions
Amazon.Com Inc AMZN 447 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 13 *
Astera Labs ALAB picked 393 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 23 *
TE Connectivity plc TEL 171 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 7 *
Celestica, Inc. CLS 142 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Space Exploration Technologies Corp. SPCX 141 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 4 *
Teradyne, Inc. TER 123 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Eliyan picked 85 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 1 *
Graphcore 72 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Tenstorrent 71 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 9 *
Super Micro Computer, Inc. SMCI 64 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Apple Inc. AAPL 56 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
L3Harris Technologies, Inc. LHX 56 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Ethernovia 55 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Marvell Technology MRVL picked 54 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Cisco Systems, Inc. CSCO 54 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Etched 46 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 1 *
Lightmatter 45 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 8 *
SambaNova Systems 39 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 2 *
Mobileye MBLY 36 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
SiTime SITM 33 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Ubiquiti Inc. UI 33 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Everpure, Inc. P 32 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Qualcomm Inc QCOM 31 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Apptronik 30 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 1 *
d-Matrix 30 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Ametek, Inc. AME 26 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Skyworks Solutions Inc SWKS 26 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
OpenAI 24 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Cerebras Systems 21 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Nebius NBIS 20 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Black Semiconductor 20 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Mercury Systems Inc. MRCY 19 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 1 *
CoreWeave CRWV 16 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 2 *
Broadcom Inc. AVGO 16 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Crusoe 15 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
MatX 15 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Penguin Solutions, Inc. PENG 15 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Rocket Lab Corporation RKLB 14 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Fractile 13 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 3 *
Hewlett Packard Enterprise Company HPE 13 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Silicon Labs SLAB 12 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Zipline 12 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
BlackSky Technology Inc. BKSY 12 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Voyager Technologies, Inc. VOYG 12 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Micron Technology, Inc. MU 11 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Zoox 10 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
AST SpaceMobile, Inc. ASTS 10 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Together AI 9 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Lumai 8 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
IonQ, Inc. IONQ 7 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 1 *

Changes in hiring

None so far for this theme, its companies or its keywords. A company needs 14 days of tracking first.

Postings that mention its keywords (1,867, newest first)

Title Company Role Location First seen Status
Global Supply Manager, EE and Semiconductors Figure AI Supply chain & procurement Manager San Jose, CA Open
Electrical Engineer, Torso Figure AI Hardware & electrical engineering Mid level San Jose, CA Open
Electrical Engineer, Actuator Systems Figure AI Robotics & autonomy Mid level San Jose, CA Closed 21 Nov 2026
Silicon Engineer Anthropic Chip design (ASIC / RTL / verification / physical design) Mid level San Francisco, CA Open
Hardware Systems Architect Anthropic Hardware & electrical engineering Mid level San Francisco, CA; New York City, NY; Seattle, WA Open
Principal Power Systems Architect, Quantum Infrastructure PsiQuantum Electrical power & energy Staff / principal Milpitas, California Open
Principal Hardware Engineer PsiQuantum Hardware & electrical engineering Staff / principal Milpitas, California Open
Principal Hardware Design Engineer PsiQuantum Hardware & electrical engineering Staff / principal Milpitas, California Open
Electronics Engineer PsiQuantum Hardware & electrical engineering Mid level Daresbury, England Open
Cryogenic Electrical Interconnect Engineer PsiQuantum Hardware & electrical engineering Mid level Milpitas, California Open
Systems Integration and Manufacturing Engineer Lightmatter Manufacturing & production Mid level Mountain View, CA Open
Staff Electrical Design Engineer Lightmatter Hardware & electrical engineering Staff / principal Mountain View, CA Open
Sr. Staff Physical Design Engineer Lightmatter Chip design (ASIC / RTL / verification / physical design) Staff / principal Toronto, ON Open
Sr. Staff Physical Design Engineer Lightmatter Chip design (ASIC / RTL / verification / physical design) Staff / principal Mountain View, CA Open
Sr. Staff Physical Design Engineer Lightmatter Chip design (ASIC / RTL / verification / physical design) Staff / principal Boston, MA Open
Sr/Staff Digital Design Engineer Lightmatter Chip design (ASIC / RTL / verification / physical design) Staff / principal Toronto, ON Open
Sr/Staff Digital Design Engineer Lightmatter Chip design (ASIC / RTL / verification / physical design) Staff / principal Boston, MA Open
Sr/Staff Digital Design Engineer Lightmatter Chip design (ASIC / RTL / verification / physical design) Staff / principal Mountain View, CA Open
Signal Integrity Engineer Lightmatter Hardware & electrical engineering Mid level Mountain View, CA Open
Principal Hardware Systems Technical Lead Lightmatter Hardware & electrical engineering Staff / principal Mountain View, CA Closed 20 Nov 2026
Principal Field Application Engineer Lightmatter Solutions & sales engineering Staff / principal Mountain View, CA Open
Power Integrity Engineer Lightmatter Hardware & electrical engineering Mid level Mountain View, CA Open
Package Layout Engineer Lightmatter Chip design (ASIC / RTL / verification / physical design) Mid level Mountain View, CA Open
Mixed-Signal Validation Engineer Lightmatter Test, quality & reliability Mid level Mountain View, CA Open
Machine Learning Infrastructure Researcher Lightmatter ML / AI Mid level Mountain View, CA Open