StockMacro
Company, fund or insider

Help

Menu

Job search

Silicon photonics

Photonic integrated circuits, co-packaged and pluggable optics for data-centre links.

Measures activity, not value. Not investment advice.

Open postings mentioning its keywords

Open postings with any of the theme's keywords: 0 on 20 Sep 2026 (tracking began), 626 on 24 Nov 2026, highest 626. Lines for the 6 largest of 10 keywords.

What it follows

Keywords (10)

Companies

Companies behind it (30 days, every tracked company)

Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026; until then no percent is shown.

Company Open mentions Change New mentions
Lightmatter picked 88 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 24 *
Space Exploration Technologies Corp. SPCX 61 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 14 *
Cisco Systems, Inc. CSCO 52 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Teradyne, Inc. TER 52 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
PsiQuantum picked 50 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 1 *
TE Connectivity plc TEL 49 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Amazon.Com Inc AMZN 31 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 1 *
Super Micro Computer, Inc. SMCI 28 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Astera Labs ALAB 23 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Marvell Technology MRVL picked 21 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Aeva AEVA picked 19 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 1 *
Quantinuum Inc. QNT 13 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Skyworks Solutions Inc SWKS 11 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Black Semiconductor picked 10 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Lumentum LITE picked 10 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Coherent Corp. COHR 10 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
L3Harris Technologies, Inc. LHX 10 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Seagate Technology Holdings PLC STX 8 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 4 *
Apple Inc. AAPL 8 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Eliyan 7 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 2 *
Corning Incorporated GLW 6 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Etched 5 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Ciena CIEN picked 5 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Celestica, Inc. CLS 5 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Tenstorrent 4 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
IonQ, Inc. IONQ 4 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
OpenAI 3 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 1 *
Lumai picked 3 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
STMicroelectronics N.V. STM 3 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Lambda 2 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 1 *
Cerebras Systems 2 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
FormFactor FORM 2 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Lumotive 2 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Commonwealth Fusion Systems 2 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Hewlett Packard Enterprise Company HPE 2 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Crusoe 1 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Nebius NBIS 1 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
SambaNova Systems 1 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Graphcore 1 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Analog Devices ADI 1 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Ethernovia 1 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Onto Innovation ONTO 1 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Anthropic 1 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Zipline 1 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Micron Technology, Inc. MU 1 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Penguin Solutions, Inc. PENG 1 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
ePlus Inc PLUS 1 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Texas Instruments Incorporated TXN 1 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Ubiquiti Inc. UI 1 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *
Vuzix Corporation VUZI 1 – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) 0 *

Changes in hiring

None so far for this theme, its companies or its keywords. A company needs 14 days of tracking first.

Postings that mention its keywords (434, newest first)

Title Company Role Location First seen Status
Applications Engineering Manager - Ethernet Astera Labs Solutions & sales engineering Manager San Jose, California, United States Open
Analog Mixed Signal Design Engineer Astera Labs Chip design (ASIC / RTL / verification / physical design) Mid level Singapore, Singapore Open
Active Electric Cable / Smart Cable Module Lead, AVP Astera Labs Hardware & electrical engineering Senior San Jose, California, United States Open
Active Electrical Cable Module FW Engineer – Tech Lead Astera Labs Embedded & firmware Senior San Jose, California, United States Open
Principal Network Engineer Graphcore SRE, DevOps & infrastructure Staff / principal Milpitas, California, United States Open
Sr. Staff High-Speed Communication Architect – AI Systems Tenstorrent ML / AI Staff / principal Austin, Texas, United States; Santa Clara, California, United States; Toronto, Ontario, Canada Open
Principal Post-Silicon Validation Engineer SambaNova Systems Chip design (ASIC / RTL / verification / physical design) Staff / principal San Jose, California, United States Open
DWDM-IP Engineer Nebius Data-centre infrastructure Mid level Amsterdam, Netherlands Open
Intern - Microwave Engineer - Summer 2027 Commonwealth Fusion Systems Hardware & electrical engineering Intern Devens, MA Open