Wafer fab equipment
Front-end process, inspection and test equipment and materials for chip fabs.
Measures activity, not value. Not investment advice.
Open postings mentioning its keywords
What it follows
Keywords (13)
- Clean room
- CMP
- EUV lithography
- High-NA EUV
- Ion implantation
- Lithography
- plasma etch
- Process integration
- thin film deposition
- Wafer fab
- wafer inspection
- wafer metrology
- Yield enhancement
Companies
Companies behind it (30 days, every tracked company)
Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026; until then no percent is shown.
| Company | Open mentions | Change | New mentions |
|---|---|---|---|
| Space Exploration Technologies Corp. SPCX | 159 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 17 * |
| Amazon.Com Inc AMZN | 159 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 5 * |
| Micron Technology, Inc. MU | 154 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 2 * |
| Skyworks Solutions Inc SWKS | 154 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| Seagate Technology Holdings PLC STX | 138 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 10 * |
| AST SpaceMobile, Inc. ASTS | 57 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Onto Innovation ONTO picked | 50 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Veeco Instruments Inc VECO | 49 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 2 * |
| L3Harris Technologies, Inc. LHX | 42 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 2 * |
| Modexus Solutions, Inc. MOD | 41 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 4 * |
| Analog Devices ADI | 35 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 8 * |
| Leonardo DRS, Inc. DRS | 34 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| SiTime SITM | 33 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| ON Semiconductor Corp ON | 33 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Advanced Energy Industries Inc AEIS | 31 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| TE Connectivity plc TEL | 29 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 5 * |
| Wolfspeed | 27 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Black Semiconductor | 27 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Celestica, Inc. CLS | 25 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 2 * |
| Cintas Corp CTAS | 25 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Rocket Lab Corporation RKLB | 24 | up +22 – (No percent: tracking began less than 30 days ago) | 0 |
| Texas Instruments Incorporated TXN | 23 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| T1 Energy Inc. TE | 22 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| PDF Solutions Inc PDFS | 20 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Lumentum LITE | 19 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Voyager Technologies, Inc. VOYG | 17 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| FormFactor FORM picked | 17 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| ABM Industries, Inc. ABM | 15 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Applied Materials Inc AMAT | 15 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Coherent Corp. COHR | 14 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| Element Solutions Inc. ESI | 14 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Teradyne, Inc. TER | 14 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Ametek, Inc. AME | 13 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| PsiQuantum | 13 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Twist Bioscience Corporation TWST | 12 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 4 * |
| Super Micro Computer, Inc. SMCI | 12 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Cirrus Logic Inc CRUS | 11 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Quantinuum Inc. QNT | 11 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Thermo Fisher Scientific, Inc. TMO | 11 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| STMicroelectronics N.V. STM | 10 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| OSI Systems Inc OSIS | 10 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Lightmatter | 9 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 7 * |
| Commonwealth Fusion Systems | 9 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Mativ Holdings, Inc. MATV | 9 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Etched | 8 | up +3 – (No percent: tracking began less than 30 days ago) | 3 |
| Axcelis Technologies picked | 8 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Colgate-Palmolive Company CL | 8 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| RTX Corporation RTX | 8 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Astera Labs ALAB | 7 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| Broadcom Inc. AVGO | 7 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
Changes in hiring
None so far for this theme, its companies or its keywords. A company needs 14 days of tracking first.
Postings that mention its keywords (1,817, newest first)
| Title | Company | Role | Location | First seen | Status |
|---|---|---|---|---|---|
| Senior Supplier Industrialization Engineer, Battery Materials | Form Energy | Supply chain & procurement Senior | Somerville, MA; Berkeley, CA; Weirton, WV | Open | |
| Senior Process Engineer, Wet Etch | T1 Energy Inc. | Process engineering (semiconductor / materials) Senior | Rockdale, TX | Open | |
| Equipment Engineer, Wet Process | T1 Energy Inc. | Manufacturing & production Mid level | Rockdale, TX | Open | |
| Equipment Engineer, Deposition | T1 Energy Inc. | Manufacturing & production Mid level | Rockdale, TX | Open | |
| Equipment Engineer, Thermal | T1 Energy Inc. | Thermal & cooling Mid level | Rockdale, TX | Open | |
| Equipment Engineer, Screen Printing | T1 Energy Inc. | Manufacturing & production Mid level | Rockdale, TX | Open | |
| Staff Process Engineer | T1 Energy Inc. | Process engineering (semiconductor / materials) Staff / principal | Rockdale, TX | Open | |
| Electrical Technician | T1 Energy Inc. | Operations & administration Mid level | Dallas, TX | Open | |
| Senior Diffusion Process Engineer | T1 Energy Inc. | Process engineering (semiconductor / materials) Senior | Rockdale, TX | Open | |
| Manager, Quality | T1 Energy Inc. | Test, quality & reliability Manager | Rockdale, TX | Open | |
| Manager, Process Engineering | T1 Energy Inc. | Process engineering (semiconductor / materials) Manager | Rockdale, TX | Open | |
| Senior Deposition Process Engineer | T1 Energy Inc. | Process engineering (semiconductor / materials) Senior | Rockdale, TX | Open | |
| Subassemblies Technician | Commonwealth Fusion Systems | Manufacturing & production Mid level | Devens, MA | Open | |
| Subassemblies Specialist | Commonwealth Fusion Systems | Manufacturing & production Mid level | Devens, MA | Open | |
| Staff Mechanical Engineer - Vacuum | Commonwealth Fusion Systems | Mechanical engineering Staff / principal | Milpitas, CA | Open | |
| Senior Mechanical Engineer - Vacuum | Commonwealth Fusion Systems | Mechanical engineering Senior | Milpitas, CA | Open | |
| Senior Mechanical Engineer | Commonwealth Fusion Systems | Mechanical engineering Senior | Milpitas, CA | Open | |
| Operations Coordinator - Assembly | Commonwealth Fusion Systems | Manufacturing & production Mid level | Devens, MA | Closed 21 Nov 2026 | |
| Lead Technician, Mechanical Assembly Testing | Commonwealth Fusion Systems | Manufacturing & production Senior | Devens, MA | Open | |
| Lead Assembly Technician - Third Shfit | Commonwealth Fusion Systems | Manufacturing & production Senior | Devens, MA | Open | |
| Lead Assembly Technician | Commonwealth Fusion Systems | Manufacturing & production Senior | Devens, MA | Open | |
| Equipment Technician | Commonwealth Fusion Systems | Manufacturing & production Mid level | Milpitas, CA | Open | |
| Senior Product, Test and Yield Enhancement Engineer - Taiwan | Cerebras Systems | Process engineering (semiconductor / materials) Senior | Sunnyvale, CA | Open | |
| Physical Security Lead, Manufacturing Operations | Cerebras Systems | Security Senior | Sunnyvale, CA | Open | |
| Yield Engineer, RF Final Test Integration (Starlink/Akoustis) | Space Exploration Technologies Corp. | Hardware & electrical engineering Mid level | Bastrop, TX | Closed 21 Nov 2026 |