Chiplets and interconnect
Die-to-die links, chip-to-chip fabrics and high-speed I/O for AI systems.
Measures activity, not value. Not investment advice.
Open postings mentioning its keywords
What it follows
Keywords (12)
Companies
Companies behind it (30 days, every tracked company)
Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026; until then no percent is shown.
| Company | Open mentions | Change | New mentions |
|---|---|---|---|
| Amazon.Com Inc AMZN | 441 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 5 * |
| Astera Labs ALAB picked | 389 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 19 * |
| TE Connectivity plc TEL | 170 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 5 * |
| Celestica, Inc. CLS | 142 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Space Exploration Technologies Corp. SPCX | 141 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 4 * |
| Teradyne, Inc. TER | 123 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Eliyan picked | 85 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| Graphcore | 74 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Tenstorrent | 69 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 7 * |
| Super Micro Computer, Inc. SMCI | 64 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Ethernovia | 55 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Marvell Technology MRVL picked | 54 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Cisco Systems, Inc. CSCO | 48 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Etched | 46 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| Lightmatter | 44 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 7 * |
| SambaNova Systems | 39 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 2 * |
| Mobileye MBLY | 36 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| SiTime SITM | 33 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Ubiquiti Inc. UI | 33 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Everpure, Inc. P | 32 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Apptronik | 30 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| d-Matrix | 30 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Ametek, Inc. AME | 26 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Skyworks Solutions Inc SWKS | 26 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| OpenAI | 24 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Nebius NBIS | 21 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Cerebras Systems | 21 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Black Semiconductor | 20 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Mercury Systems Inc. MRCY | 18 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| CoreWeave CRWV | 16 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 2 * |
| Broadcom Inc. AVGO | 16 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Crusoe | 15 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| MatX | 15 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Penguin Solutions, Inc. PENG | 15 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Rocket Lab Corporation RKLB | 14 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Fractile | 13 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 3 * |
| Silicon Labs SLAB | 12 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Zipline | 12 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Micron Technology, Inc. MU | 11 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Zoox | 10 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| AST SpaceMobile, Inc. ASTS | 10 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Together AI | 9 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Lumai | 8 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| IonQ, Inc. IONQ | 7 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| Lambda | 7 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Figure AI | 7 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Waymo | 7 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Wayve | 7 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Ciena CIEN | 6 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Anthropic | 6 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
Changes in hiring
None so far for this theme, its companies or its keywords. A company needs 14 days of tracking first.
Postings that mention its keywords (1,679, newest first)
| Title | Company | Role | Location | First seen | Status |
|---|---|---|---|---|---|
| BSP - Senior Lead Engineer, Software | Celestica, Inc. | Embedded & firmware Senior | Penang, 07, MY | Open | |
| Senior Open BMC Engineer | Celestica, Inc. | Software engineering Senior | Taipei, TPQ, TW | Open | |
| Senior Open BMC Engineer | Celestica, Inc. | Software engineering Senior | Taipei, TPQ, TW | Open | |
| Senior Manager - OpenBMC | Celestica, Inc. | Software engineering Manager | Guindy, Chennai, TN, IN | Open | |
| Staff Engineer, PCB Layout | Celestica, Inc. | Hardware & electrical engineering Staff / principal | Remote Employee US, CA, US | Open | |
| Senior Manager, Hardware Design Engineering (Power) | Celestica, Inc. | Hardware & electrical engineering Manager | Austin, TX, US | Open | |
| Senior Staff Engineer, Hardware Design (x86) | Celestica, Inc. | Hardware & electrical engineering Staff / principal | Austin, TX, US | Open | |
| Senior Principal, HW Design Engineering (AI/ ML Architect ) | Celestica, Inc. | ML / AI Staff / principal | San Jose, CA, US | Open | |
| Engineer, Software - Graduate Development Program | Celestica, Inc. | Software engineering Entry level | Austin, TX, US | Open | |
| Senior Manager, Hardware Design Engineering | Celestica, Inc. | Hardware & electrical engineering Manager | San Jose, CA, US | Open | |
| Lead Engineer, FPGA Design (Advanced Technology Solutions) | Celestica, Inc. | Chip design (ASIC / RTL / verification / physical design) Senior | Penang, 07, MY | Open | |
| Senior Principal, Design Engineering | Celestica, Inc. | Software engineering Staff / principal | Remote Employee Canada, ON, CA | Open | |
| Staff BIOS / UEFI Firmware Engineer | Celestica, Inc. | Embedded & firmware Staff / principal | Taipei, TPQ, TW | Open | |
| Director, Field System Architect | Celestica, Inc. | Software engineering Director | Austin, TX, US | Open | |
| Staff Engineer, Signal Test Leader | Celestica, Inc. | Test, quality & reliability Staff / principal | Penang, 07, MY | Open | |
| Senior Signal Integrity Engineer | Celestica, Inc. | Hardware & electrical engineering Senior | Penang, 07, MY | Open | |
| Student Intern, Software & Hardware Engineer | Celestica, Inc. | Hardware & electrical engineering Intern | Austin, TX, US | Open | |
| Sr. Lead Engineer - Power Design | Celestica, Inc. | Software engineering Senior | Austin, TX, US | Open | |
| HW & SW Applications Admin 1 | Celestica, Inc. | Corporate IT Entry level | Toronto, ON, CA | Open | |
| Staff Engineer, Electrical Design | Celestica, Inc. | Software engineering Staff / principal | Austin, TX, US | Open | |
| Staff Engineer, PCB Layout | Celestica, Inc. | Hardware & electrical engineering Staff / principal | San Jose, CA, US | Open | |
| Factory Applications Engineer (Production Board Test, North Reading, MA) | Teradyne, Inc. | Solutions & sales engineering Mid level | North Reading, MA, US | Open | |
| Software Engineer Embedded Firmware (LitePoint, San Jose, CA) | Teradyne, Inc. | Embedded & firmware Mid level | San Jose, CA, US | Open | |
| RF Systems Engineer (Teradyne, North Reading, MA) | Teradyne, Inc. | Hardware & electrical engineering Mid level | North Reading, MA, US | Open | |
| Field Application Engineer (SEG, Irvine) | Teradyne, Inc. | Solutions & sales engineering Mid level | Irvine, CA, US | Open |