Chiplets and interconnect
Die-to-die links, chip-to-chip fabrics and high-speed I/O for AI systems.
Measures activity, not value. Not investment advice.
Open postings mentioning its keywords
What it follows
Keywords (12)
Companies
Companies behind it (30 days, every tracked company)
Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026; until then no percent is shown.
| Company | Open mentions | Change | New mentions |
|---|---|---|---|
| Amazon.Com Inc AMZN | 441 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 5 * |
| Astera Labs ALAB picked | 389 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 19 * |
| TE Connectivity plc TEL | 170 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 5 * |
| Celestica, Inc. CLS | 142 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Space Exploration Technologies Corp. SPCX | 141 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 4 * |
| Teradyne, Inc. TER | 123 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Eliyan picked | 85 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| Graphcore | 74 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Tenstorrent | 69 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 7 * |
| Super Micro Computer, Inc. SMCI | 64 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Ethernovia | 55 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Marvell Technology MRVL picked | 54 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Cisco Systems, Inc. CSCO | 48 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Etched | 46 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| Lightmatter | 44 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 7 * |
| SambaNova Systems | 39 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 2 * |
| Mobileye MBLY | 36 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| SiTime SITM | 33 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Ubiquiti Inc. UI | 33 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Everpure, Inc. P | 32 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Apptronik | 30 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| d-Matrix | 30 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Ametek, Inc. AME | 26 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Skyworks Solutions Inc SWKS | 26 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| OpenAI | 24 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Nebius NBIS | 21 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Cerebras Systems | 21 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Black Semiconductor | 20 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Mercury Systems Inc. MRCY | 18 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| CoreWeave CRWV | 16 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 2 * |
| Broadcom Inc. AVGO | 16 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Crusoe | 15 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| MatX | 15 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Penguin Solutions, Inc. PENG | 15 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Rocket Lab Corporation RKLB | 14 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Fractile | 13 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 3 * |
| Silicon Labs SLAB | 12 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Zipline | 12 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Micron Technology, Inc. MU | 11 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Zoox | 10 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| AST SpaceMobile, Inc. ASTS | 10 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Together AI | 9 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Lumai | 8 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| IonQ, Inc. IONQ | 7 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| Lambda | 7 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Figure AI | 7 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Waymo | 7 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Wayve | 7 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Ciena CIEN | 6 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Anthropic | 6 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
Changes in hiring
None so far for this theme, its companies or its keywords. A company needs 14 days of tracking first.
Postings that mention its keywords (1,679, newest first)
| Title | Company | Role | Location | First seen | Status |
|---|---|---|---|---|---|
| Field Application Engineer (Product Test; Plano, TX) | Teradyne, Inc. | Solutions & sales engineering Mid level | Plano, TX, US | Open | |
| Senior Microwave R&D Engineer (Teradyne Innovation Lab, North Reading, MA) Test Division) | Teradyne, Inc. | Software engineering Senior | North Reading, MA, US | Open | |
| Senior PCB Design Engineer (Nextest, Philippines: Alabang) | Teradyne, Inc. | Hardware & electrical engineering Senior | Lapu-Lapu City, PH | Open | |
| Senior Silicon Photonics PIC Design Engineer (Teradyne, North Reading, MA) | Teradyne, Inc. | Chip design (ASIC / RTL / verification / physical design) Senior | North Reading, MA, US | Open | |
| FPGA Engineering Manager (MTD, San Jose, CA) | Teradyne, Inc. | Chip design (ASIC / RTL / verification / physical design) Manager | San Jose, CA, US | Open | |
| Digital Verification Engineer (MTD, San Jose, CA) | Teradyne, Inc. | Chip design (ASIC / RTL / verification / physical design) Mid level | San Jose, CA, US | Open | |
| Supply Line Engineer (TERADYNE, North Reading, MA) | Teradyne, Inc. | Operations & administration Mid level | North Reading, MA, US | Open | |
| Mixed Signal Electrical Engineer (Compute Test, North Reading, MA) | Teradyne, Inc. | Hardware & electrical engineering Mid level | North Reading, MA, US | Open | |
| Engineering Manager - Signal Delivery (Compute Test, Agoura Hills) | Teradyne, Inc. | Software engineering Manager | Agoura Hills, CA, US | Open | |
| ASIC Bench Characterization Manager (TERADYNE, Agoura Hills, CA) | Teradyne, Inc. | Chip design (ASIC / RTL / verification / physical design) Manager | Agoura Hills, CA, US | Open | |
| Digital Verification Engineer Lead (MTD, Tualatin, OR) | Teradyne, Inc. | Chip design (ASIC / RTL / verification / physical design) Senior | Tualatin, OR, US | Open | |
| Signal and Power Integrity Engineer (Memory Test, Agoura Hills or San Jose, CA ) | Teradyne, Inc. | Hardware & electrical engineering Mid level | Agoura Hills, CA, US | Open | |
| Senior Calibration Engineer (Memory Test, Tualatin, OR) | Teradyne, Inc. | Test, quality & reliability Senior | Tualatin, OR, US | Open | |
| Product Manager, Test Cell (Teradyne, MA, CA, OR) | Teradyne, Inc. | Product management Mid level | North Reading, MA, US | Open | |
| Digital Verification Engineer (Teradyne, Costa Rica | Teradyne, Inc. | Chip design (ASIC / RTL / verification / physical design) Mid level | Alajuela, CR | Open | |
| Calibration and Diagnostics Engineer (Teradyne, Costa Rica) | Teradyne, Inc. | Test, quality & reliability Mid level | Alajuela, CR | Open | |
| Field Application Engineer | Teradyne, Inc. | Solutions & sales engineering Mid level | Haifa, IL | Open | |
| Hardware/Software Integration Engineer (Compute Test, North Reading) | Teradyne, Inc. | Hardware & electrical engineering Mid level | North Reading, MA, US | Open | |
| Signal and Power Integrity (SIPI) Engineer (Teradyne, Penang) | Teradyne, Inc. | Hardware & electrical engineering Mid level | MY | Open | |
| Field Application Engineer | Teradyne, Inc. | Solutions & sales engineering Mid level | Jubei City, TW | Open | |
| FPGA Developer (Compute Test, North Reading) | Teradyne, Inc. | Chip design (ASIC / RTL / verification / physical design) Mid level | North Reading, MA, US | Open | |
| Hardware Engineer, (Defense & Aerospace, North Reading, MA) | Teradyne, Inc. | Hardware & electrical engineering Mid level | North Reading, MA, US | Open | |
| Senior Hardware Circuit Design Engineer (Memory Test, Teradyne, Tualatin, OR) | Teradyne, Inc. | Chip design (ASIC / RTL / verification / physical design) Senior | Tualatin, OR, US | Open | |
| Field Application Engineer (SEG, Austin) | Teradyne, Inc. | Solutions & sales engineering Mid level | Austin, TX, US | Open | |
| Senior Hardware Design Engineer, Power Electronics (Compute Test, North Reading) | Teradyne, Inc. | Electrical power & energy Senior | North Reading, MA, US | Open |