Data-centre power
Power distribution, conversion and on-site generation for AI data centres.
Measures activity, not value. Not investment advice.
Open postings mentioning its keywords
What it follows
Keywords (12)
- 800 VDC
- Behind-the-meter generation
- Busbar
- Critical facilities
- Grid interconnection
- HVDC
- Medium voltage
- PDU
- Power shelves
- Solid-state transformer
- Switchgear
- UPS
Companies
Companies behind it (30 days, every tracked company)
Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026; until then no percent is shown.
| Company | Open mentions | Change | New mentions |
|---|---|---|---|
| Amazon.Com Inc AMZN | 4,259 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 92 * |
| Space Exploration Technologies Corp. SPCX | 264 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 15 * |
| Nebius NBIS | 105 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 8 * |
| Microsoft Corp MSFT | 96 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 3 * |
| Crusoe picked | 85 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| TE Connectivity plc TEL | 63 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 3 * |
| Freeport-McMoran Inc. FCX | 50 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Amperesand picked | 44 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| Modexus Solutions, Inc. MOD | 42 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Valar Atomics | 41 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Super Micro Computer, Inc. SMCI | 41 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Hut 8 HUT picked | 37 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| CoreWeave CRWV | 36 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 4 * |
| Redwood Materials | 34 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 2 * |
| Anthropic | 34 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Lambda | 32 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Hubbell Incorporated HUBB | 29 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Formic | 28 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 5 * |
| Eaton Corporation, plc ETN | 26 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Mainspring Energy picked | 24 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Celestica, Inc. CLS | 22 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| TensorWave | 21 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| L3Harris Technologies, Inc. LHX | 20 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| OpenAI | 19 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| ON.energy picked | 19 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Entergy Corporation ETR | 19 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Oracle Corp ORCL | 19 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Ametek, Inc. AME | 18 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| BCE, Inc. BCE | 18 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| PG&E Corporation PCG | 18 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Cerebras Systems | 17 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Enerflex Ltd. EFXT | 17 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Keel Infrastructure Corp. KEEL | 17 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| ABM Industries, Inc. ABM | 16 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 2 * |
| General Matter | 16 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| Zipline | 15 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Form Energy | 13 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Energy Vault Holdings, Inc. NRGV | 13 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Apple Inc. AAPL | 12 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| EdgeConneX picked | 11 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Submer | 11 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Cloudflare NET | 11 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| PubMatic, Inc. PUBM | 11 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| SPX Technologies, Inc. SPXC | 11 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Etched | 10 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Ubiquiti Inc. UI | 10 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Advanced Energy Industries Inc AEIS | 9 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Rocket Lab Corporation RKLB | 9 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| PsiQuantum | 8 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Exowatt picked | 8 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
Changes in hiring
None so far for this theme, its companies or its keywords. A company needs 14 days of tracking first.
Postings that mention its keywords (3,490, newest first)
| Title | Company | Role | Location | First seen | Status |
|---|---|---|---|---|---|
| Summer 2027 Internship - Electrical Engineering (Buildings) | General Matter | Hardware & electrical engineering Intern | Los Angeles, CA | Open | |
| Specialist Lab Piping Designer (Buildings) | General Matter | Mechanical engineering Mid level | Los Angeles, CA | Open | |
| Software Engineer, Data Visualization | General Matter | Software engineering Mid level | Los Angeles, CA | Open | |
| Software Engineer, Data Platform | General Matter | Data & analytics Mid level | Los Angeles, CA | Open | |
| Nuclear Design Basis Engineer | General Matter | Nuclear fission & fusion Mid level | Los Angeles, CA | Open | |
| Electrical Engineer, Rack Power Distribution | General Matter | Electrical power & energy Mid level | Los Angeles, CA | Open | |
| Electrical Engineer (PE) - Los Angeles | General Matter | Hardware & electrical engineering Mid level | Los Angeles, CA | Open | |
| Staff Instrumentation & Controls Engineer - Hardware | Valar Atomics | Hardware & electrical engineering Staff / principal | Orangeville, Utah, United States | Open | |
| Staff Electrical Engineer | Valar Atomics | Hardware & electrical engineering Staff / principal | Torrance, California, United States | Open | |
| Staff Electrical Engineer | Valar Atomics | Hardware & electrical engineering Staff / principal | Orangeville, Utah, United States | Open | |
| Staff Electrical Designer | Valar Atomics | Hardware & electrical engineering Staff / principal | Torrance, California, United States | Open | |
| Senior Instrumentation & Controls Engineer - Hardware | Valar Atomics | Hardware & electrical engineering Senior | Orangeville, Utah, United States | Open | |
| Senior Electrical Maintenance Planner | Valar Atomics | Operations & administration Senior | Orangeville, Utah, United States | Open | |
| Senior Electrical Engineer | Valar Atomics | Hardware & electrical engineering Senior | Torrance, California, United States | Open | |
| Senior Electrical Designer | Valar Atomics | Hardware & electrical engineering Senior | Torrance, California, United States | Open | |
| Electrical Maintenance Planner | Valar Atomics | Operations & administration Mid level | Orangeville, Utah, United States | Open | |
| Electrical Engineer – LV Power Distribution | Valar Atomics | Electrical power & energy Mid level | Orangeville, Utah, United States | Open | |
| Director, Electrical - Power Distribution | Valar Atomics | Electrical power & energy Director | Torrance, California, United States | Open | |
| Director, Project Management Office (TPI) | TerraPower | Program & project management Director | Everett, WA | Open | |
| PITA Pre-Commissioning Engineer | Kairos Power | Facilities & construction Mid level | Oak Ridge, TN | Open | |
| Director of Transmission & Interconnection | Oklo | Electrical power & energy Director | Santa Clara, CA or Remote | Open | |
| VP of Product Management (Data Centers) | ON.energy | Product management VP / executive | Houston, Texas, United States; Miami, Florida, United States; Reston, Virginia, United States | Open | |
| Site Readiness Technician I – Data Center Energy Storage & Power Systems | ON.energy | Data-centre infrastructure Entry level | Amarillo, Texas, United States | Open | |
| Senior Project Manager, Energy Storage | ON.energy | Program & project management Senior | Houston, Texas, United States; Reston, Virginia, United States; Tysons | Open | |
| Site Project Safety Manager | ON.energy | Facilities & construction Manager | Houston, Texas, United States | Open |