Data-centre power
Power distribution, conversion and on-site generation for AI data centres.
Measures activity, not value. Not investment advice.
Open postings mentioning its keywords
What it follows
Keywords (12)
- 800 VDC
- Behind-the-meter generation
- Busbar
- Critical facilities
- Grid interconnection
- HVDC
- Medium voltage
- PDU
- Power shelves
- Solid-state transformer
- Switchgear
- UPS
Companies
Companies behind it (30 days, every tracked company)
Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026; until then no percent is shown.
| Company | Open mentions | Change | New mentions |
|---|---|---|---|
| Amazon.Com Inc AMZN | 4,225 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 40 * |
| Space Exploration Technologies Corp. SPCX | 259 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 10 * |
| Nebius NBIS | 104 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 7 * |
| Microsoft Corp MSFT | 94 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| Crusoe picked | 85 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| TE Connectivity plc TEL | 63 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 3 * |
| Freeport-McMoran Inc. FCX | 50 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Amperesand picked | 44 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| Valar Atomics | 41 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Super Micro Computer, Inc. SMCI | 41 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Hut 8 HUT picked | 37 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| CoreWeave CRWV | 34 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 2 * |
| Anthropic | 34 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Redwood Materials | 33 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| Lambda | 32 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Formic | 28 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 5 * |
| Mainspring Energy picked | 26 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Celestica, Inc. CLS | 22 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| TensorWave | 21 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| ON.energy picked | 21 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| OpenAI | 19 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| Entergy Corporation ETR | 19 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Ametek, Inc. AME | 18 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| BCE, Inc. BCE | 18 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Oracle Corp ORCL | 18 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Cerebras Systems | 17 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Enerflex Ltd. EFXT | 17 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Keel Infrastructure Corp. KEEL | 17 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| General Matter | 16 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| Zipline | 15 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| ABM Industries, Inc. ABM | 14 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Form Energy | 13 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Energy Vault Holdings, Inc. NRGV | 13 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| EdgeConneX picked | 11 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Submer | 11 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Cloudflare NET | 11 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| PubMatic, Inc. PUBM | 11 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| SPX Technologies, Inc. SPXC | 11 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Etched | 10 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Ubiquiti Inc. UI | 10 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| AST SpaceMobile, Inc. ASTS | 9 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Rocket Lab Corporation RKLB | 9 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| PsiQuantum | 8 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Exowatt picked | 8 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Galaxy Digital Inc. GLXY | 8 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| NextEra Energy, Inc. NEE | 8 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Kairos Power | 7 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 2 * |
| Antares | 7 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Comstock Holding Companies, Inc. CHCI | 7 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| FuelCell Energy Inc NEW (DE) FCEL | 7 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
Changes in hiring
None so far for this theme, its companies or its keywords. A company needs 14 days of tracking first.
Postings that mention its keywords (3,155, newest first)
| Title | Company | Role | Location | First seen | Status |
|---|---|---|---|---|---|
| Data Center Chief Engineer, DCEO | Amazon.Com Inc | Data-centre infrastructure Mid level | Hobart, Indiana, USA | Open | |
| Electrical/Mechanical Engineering Technician - Data Center, TLC DCEO | Amazon.Com Inc | Data-centre infrastructure Mid level | Tel Aviv-Yafo, Tel Aviv, ISR | Open | |
| Data Center Engineering Operations Chief Engineer, DCEO | Amazon.Com Inc | Data-centre infrastructure Mid level | Milan, Lombardy, ITA | Open | |
| Commissioning Engineer, AWS Commissioning | Amazon.Com Inc | Facilities & construction Mid level | New Carlisle, Indiana, USA | Open | |
| Engineering Operation Technician, DCC Communities | Amazon.Com Inc | Customer success & support Mid level | New Albany, Ohio, USA; Jeffersonville, Ohio, USA | Open | |
| Pre-Construction Manager, AWS AMER Construction | Amazon.Com Inc | Facilities & construction Manager | Seattle, Washington, USA; Chicago, Illinois, USA | Open | |
| Engineering Operation Technician, DCC Communities | Amazon.Com Inc | Customer success & support Mid level | Jeffersonville, Ohio, USA; Johnstown, Ohio, USA | Open | |
| Engineering Operation Technician, DCC Communities | Amazon.Com Inc | Customer success & support Mid level | Jeffersonville, Ohio, USA; Johnstown, Ohio, USA | Open | |
| Engineering Operation Technician, DCC Communities | Amazon.Com Inc | Customer success & support Mid level | Jeffersonville, Ohio, USA; Johnstown, Ohio, USA | Open | |
| Engineering Operations Technician | Amazon.Com Inc | Customer success & support Mid level | Boardman, Oregon, USA | Open | |
| Data Center Technical Operations Engineer, AWS Data Center Engineering Operations | Amazon.Com Inc | Data-centre infrastructure Mid level | Sydney, New South Wales, AUS | Open | |
| Data Center Engineering Operations Technician, AWS Data Center Engineering Operations | Amazon.Com Inc | Data-centre infrastructure Mid level | Sydney, New South Wales, AUS | Open | |
| Engineering Operations Technician | Amazon.Com Inc | Customer success & support Mid level | Mineral, Virginia, USA | Open | |
| Facility Operations Center Engineer, Facilities Operation Center | Amazon.Com Inc | Facilities & construction Mid level | Dublin, IRL | Open | |
| Sr. Electrical Engineer, Data Center Engineering | Amazon.Com Inc | Data-centre infrastructure Senior | Austin, Texas, USA; Seattle, Washington, USA; Atlanta, Georgia, USA; Herndon, Virginia, USA; Columbus, Ohio, USA | Open | |
| Sr. Electrical Engineer, Data Center Engineering | Amazon.Com Inc | Data-centre infrastructure Senior | Austin, Texas, USA; Seattle, Washington, USA; Atlanta, Georgia, USA; Herndon, Virginia, USA; Columbus, Ohio, USA | Open | |
| Engineering Operations Technician, ADC InfraOps DCEO | Amazon.Com Inc | Customer success & support Mid level | New Albany, Ohio, USA | Open | |
| Engineering Operations Technician, ADC InfraOps DCEO | Amazon.Com Inc | Customer success & support Mid level | Aurora, Colorado, USA | Open | |
| Data Center Controls Engineer, Data Center Capacity Delivery - Controls | Amazon.Com Inc | Data-centre infrastructure Mid level | Herndon, Virginia, USA | Open | |
| Data Center Engineering Operations , DCEO | Amazon.Com Inc | Data-centre infrastructure Mid level | Mumbai, Maharashtra, IND | Open | |
| Data Center Technician | Amazon.Com Inc | Data-centre infrastructure Mid level | Hamlet, North Carolina, USA | Open | |
| Sr Pre-Construction Manager, AMER DCCD Pre-Construction | Amazon.Com Inc | Facilities & construction Manager | Herndon, Virginia, USA | Open | |
| Electrical Engineering Manager, Data Center Design Engineering | Amazon.Com Inc | Data-centre infrastructure Manager | Austin, Texas, USA; Herndon, Virginia, USA | Open | |
| Gestionnaire de bâtiments, Exploitation de centre de données / Data Center Facility Manager, DCEO | Amazon.Com Inc | Data-centre infrastructure Manager | Montreal, Quebec, CAN | Open | |
| Data Center Cluster Operations Leader, AWS Data Centers | Amazon.Com Inc | Data-centre infrastructure Mid level | Benton, Louisiana, USA | Open |