Wafer fab equipment
Front-end process, inspection and test equipment and materials for chip fabs.
Measures activity, not value. Not investment advice.
Open postings mentioning its keywords
What it follows
Keywords (13)
- Clean room
- CMP
- EUV lithography
- High-NA EUV
- Ion implantation
- Lithography
- plasma etch
- Process integration
- thin film deposition
- Wafer fab
- wafer inspection
- wafer metrology
- Yield enhancement
Companies
Companies behind it (30 days, every tracked company)
Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026; until then no percent is shown.
| Company | Open mentions | Change | New mentions |
|---|---|---|---|
| Skyworks Solutions Inc SWKS | 164 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| Amazon.Com Inc AMZN | 156 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Micron Technology, Inc. MU | 154 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Space Exploration Technologies Corp. SPCX | 153 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Seagate Technology Holdings PLC STX | 135 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| AST SpaceMobile, Inc. ASTS | 56 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Onto Innovation ONTO picked | 53 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Veeco Instruments Inc VECO | 47 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Leonardo DRS, Inc. DRS | 36 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| SiTime SITM | 33 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| ON Semiconductor Corp ON | 33 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Wolfspeed | 28 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Analog Devices ADI | 27 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Black Semiconductor | 27 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Cintas Corp CTAS | 26 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Rocket Lab Corporation RKLB | 24 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| TE Connectivity plc TEL | 24 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Texas Instruments Incorporated TXN | 24 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Celestica, Inc. CLS | 23 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| T1 Energy Inc. TE | 22 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Lumentum LITE | 21 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| PDF Solutions Inc PDFS | 20 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| FormFactor FORM picked | 17 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Quantinuum Inc. QNT | 17 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| ABM Industries, Inc. ABM | 16 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Element Solutions Inc. ESI | 14 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Teradyne, Inc. TER | 14 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| PsiQuantum | 13 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Coherent Corp. COHR | 13 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Ametek, Inc. AME | 12 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Super Micro Computer, Inc. SMCI | 12 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Cirrus Logic Inc CRUS | 11 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| OSI Systems Inc OSIS | 11 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Commonwealth Fusion Systems | 10 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Mativ Holdings, Inc. MATV | 9 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| STMicroelectronics N.V. STM | 9 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Etched | 8 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| Axcelis Technologies picked | 8 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Colgate-Palmolive Company CL | 8 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Twist Bioscience Corporation TWST | 8 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Lightmatter | 7 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 5 * |
| TerraPower | 7 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| Valar Atomics | 7 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| Universal Display Corp OLED | 7 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Snowflake Inc. SNOW | 7 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Cerebras Systems | 6 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 2 * |
| Astera Labs ALAB | 6 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Substrate picked | 6 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Ambiq Micro, Inc. AMBQ | 6 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Broadcom Inc. AVGO | 6 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
Changes in hiring
None so far for this theme, its companies or its keywords. A company needs 14 days of tracking first.
Postings that mention its keywords (1,527, newest first)
| Title | Company | Role | Location | First seen | Status |
|---|---|---|---|---|---|
| Principal, Ads Strategy and Partnerships, EMEA , Amazon Ads Strategy and Partnerships | Amazon.Com Inc | Sales & business development Staff / principal | London, England, GBR | Open | |
| Principal Strategy and Partnerships for AgencyTech, Amazon Ads Strategy and Partnerships | Amazon.Com Inc | Sales & business development Staff / principal | New York, New York, USA; Seattle, Washington, USA | Open | |
| Sr. Go-To-Market (GTM) Analytics Specialist, Japan, APJC Data WWSO | Amazon.Com Inc | Data & analytics Senior | Tokyo, JPN | Open | |
| Senior Worldwide Specialist Sales, Amazon Connect (CXE), AWS | Amazon.Com Inc | Sales & business development Senior | Boston, Massachusetts, USA; Austin, Texas, USA; Seattle, Washington, USA; Arlington, Virginia, USA; Atlanta, Georgia, USA; New York, New York, USA; San Francisco, California, USA | Open | |
| Physical Design Verification Manager, Annapurna Labs | Amazon.Com Inc | Chip design (ASIC / RTL / verification / physical design) Manager | Austin, Texas, USA; Cupertino, California, USA | Open | |
| Sr. Supply Chain Manager, AMXL | Amazon.Com Inc | Supply chain & procurement Manager | Nashville, Tennessee, USA; Bellevue, Washington, USA | Open | |
| Launch & Integration Manager, re:Cycle Reverse Logistics | Amazon.Com Inc | Supply chain & procurement Manager | Greencastle, Pennsylvania, USA | Open | |
| Machinist Technician, Amazon Leo | Amazon.Com Inc | Manufacturing & production Mid level | Merritt Island, Florida, USA | Open | |
| Processing Technician - 2nd Shift, Amazon Leo | Amazon.Com Inc | Operations & administration Mid level | Merritt Island, Florida, USA | Open | |
| Processing Technician - 2nd Shift, Amazon Leo | Amazon.Com Inc | Operations & administration Mid level | Merritt Island, Florida, USA | Open | |
| Processing Technician - Launch Operations, Amazon Leo | Amazon.Com Inc | Operations & administration Mid level | Merritt Island, Florida, USA | Open | |
| Sr. Test Process Engineer, Amazon Leo | Amazon.Com Inc | Process engineering (semiconductor / materials) Senior | Bellevue, Washington, USA | Open | |
| Professional Services III - AMZ27006.1 | Amazon.Com Inc | Operations & administration Senior | New York, New York, USA | Open | |
| Maintenance Engineer, LEO EQUIPMENT GROUP | Amazon.Com Inc | Manufacturing & production Mid level | Kennedy Space Center, Florida, USA | Open | |
| Maintenance Engineer , Launch Operations | Amazon.Com Inc | Manufacturing & production Mid level | Kennedy Space Center, Florida, USA | Open | |
| Processing Technician - 2nd Shift, Amazon Leo | Amazon.Com Inc | Operations & administration Mid level | Merritt Island, Florida, USA | Open | |
| Processing Technician, Satellite Integration, Leo Payload Processing Facility | Amazon.Com Inc | Facilities & construction Mid level | Merritt Island, Florida, USA | Open | |
| Processing Technician, Satellite Integration , Amazon Leo | Amazon.Com Inc | Operations & administration Mid level | Merritt Island, Florida, USA | Open | |
| Manufacturing Engineer I - Launch Payload Processing Facility, LEO Satellite Processing Zone | Amazon.Com Inc | Facilities & construction Entry level | Merritt Island, Florida, USA | Open | |
| Processing Technician - 2nd Shift, Amazon Leo | Amazon.Com Inc | Operations & administration Mid level | Merritt Island, Florida, USA | Open | |
| Packaging Engineer II, Amazon Leo | Amazon.Com Inc | Process engineering (semiconductor / materials) Mid level | Everett, Washington, USA | Open | |
| Sr. Site Technical Manager, Device Postponement Operations (DPO) | Amazon.Com Inc | Operations & administration Manager | Manchester, England, GBR | Open | |
| Sr Electrical Engineer, Amazon Leo | Amazon.Com Inc | Hardware & electrical engineering Senior | Redmond, Washington, USA | Open | |
| ASIC Test Engineer, Annapurna Silicon Operations | Amazon.Com Inc | Chip design (ASIC / RTL / verification / physical design) Mid level | Taipei City, TWN; Hsinchu City, TWN | Open | |
| Optical Material and Process Engineer, DOT Hardware | Amazon.Com Inc | Hardware & electrical engineering Mid level | Shenzhen, CHN | Open |