Wafer fab equipment
Front-end process, inspection and test equipment and materials for chip fabs.
Measures activity, not value. Not investment advice.
Open postings mentioning its keywords
What it follows
Keywords (13)
- Clean room
- CMP
- EUV lithography
- High-NA EUV
- Ion implantation
- Lithography
- plasma etch
- Process integration
- thin film deposition
- Wafer fab
- wafer inspection
- wafer metrology
- Yield enhancement
Companies
Companies behind it (30 days, every tracked company)
Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026; until then no percent is shown.
| Company | Open mentions | Change | New mentions |
|---|---|---|---|
| Skyworks Solutions Inc SWKS | 164 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| Amazon.Com Inc AMZN | 156 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Micron Technology, Inc. MU | 154 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Space Exploration Technologies Corp. SPCX | 153 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Seagate Technology Holdings PLC STX | 135 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| AST SpaceMobile, Inc. ASTS | 56 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Onto Innovation ONTO picked | 53 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Veeco Instruments Inc VECO | 47 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Leonardo DRS, Inc. DRS | 36 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| SiTime SITM | 33 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| ON Semiconductor Corp ON | 33 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Wolfspeed | 28 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Analog Devices ADI | 27 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Black Semiconductor | 27 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Cintas Corp CTAS | 26 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Rocket Lab Corporation RKLB | 24 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| TE Connectivity plc TEL | 24 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Texas Instruments Incorporated TXN | 24 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Celestica, Inc. CLS | 23 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| T1 Energy Inc. TE | 22 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Lumentum LITE | 21 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| PDF Solutions Inc PDFS | 20 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| FormFactor FORM picked | 17 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Quantinuum Inc. QNT | 17 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| ABM Industries, Inc. ABM | 16 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Element Solutions Inc. ESI | 14 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Teradyne, Inc. TER | 14 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| PsiQuantum | 13 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Coherent Corp. COHR | 13 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Ametek, Inc. AME | 12 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Super Micro Computer, Inc. SMCI | 12 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Cirrus Logic Inc CRUS | 11 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| OSI Systems Inc OSIS | 11 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Commonwealth Fusion Systems | 10 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Mativ Holdings, Inc. MATV | 9 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| STMicroelectronics N.V. STM | 9 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Etched | 8 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| Axcelis Technologies picked | 8 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Colgate-Palmolive Company CL | 8 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Twist Bioscience Corporation TWST | 8 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Lightmatter | 7 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 5 * |
| TerraPower | 7 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| Valar Atomics | 7 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| Universal Display Corp OLED | 7 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Snowflake Inc. SNOW | 7 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Cerebras Systems | 6 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 2 * |
| Astera Labs ALAB | 6 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Substrate picked | 6 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Ambiq Micro, Inc. AMBQ | 6 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Broadcom Inc. AVGO | 6 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
Changes in hiring
None so far for this theme, its companies or its keywords. A company needs 14 days of tracking first.
Postings that mention its keywords (1,527, newest first)
| Title | Company | Role | Location | First seen | Status |
|---|---|---|---|---|---|
| Mechanical Engineer - Equipment and Fixtures | Cerebras Systems | Mechanical engineering Mid level | Sunnyvale, CA | Open | |
| Equipment Engineering Intern (BAW & SAW Equipment) | Skyworks Solutions Inc | Manufacturing & production Intern | Singapore, SG, 469269 | Open | |
| Senior Wafer Fab Planner | Semtech Corp | Manufacturing & production Senior | USA - Alhambra, CA | Open | |
| Wafer Fab Technician – Metallization, Dry Etch & Wet Etch | Semtech Corp | Manufacturing & production Mid level | USA - City of Industry, CA | Open | |
| Wafer Fab Technician – Photolithography & Wet Etch | Semtech Corp | Manufacturing & production Mid level | USA - City of Industry, CA | Open | |
| Wafer Fab Technician – PECVD, Dry Etch & Wet Etch | Semtech Corp | Manufacturing & production Mid level | USA - City of Industry, CA | Open | |
| Wafer Fab Supervisor | Semtech Corp | Manufacturing & production Manager | USA - City of Industry, CA | Open | |
| Materials & Cleanroom Operator (18 months fixed term contract) | Bio-Techne Corp. | Other Mid level | Bristol, UK | Open | |
| Senior Engineer, Process Integration (Contract Manufacturers Operation) | Illumina Inc | Process engineering (semiconductor / materials) Senior | Singapore - Woodlands - NorthTech | Open | |
| Technical Staff Engineer - Process Integration | Microchip Technology Inc | Process engineering (semiconductor / materials) Mid level | CA - San Jose - Holger | Open | |
| Production Specialist (Wafer Fab) | Microchip Technology Inc | Manufacturing & production Mid level | MA - Lowell | Open | |
| Technician III -Yield Enhancement | Microchip Technology Inc | Process engineering (semiconductor / materials) Senior | AZ - Chandler | Open | |
| Technician III-Manufacturing (Wafer Fab) | Microchip Technology Inc | Manufacturing & production Senior | MA - Lowell | Open | |
| Principal Engineer-Yield Enhancement | Microchip Technology Inc | Process engineering (semiconductor / materials) Staff / principal | CO - Colorado Springs - East Cheyenne Mountain Blvd | Open | |
| Engineer - Yield Enhancement | Microchip Technology Inc | Process engineering (semiconductor / materials) Mid level | Taiwan - Development Center (Hsinchu) | Open | |
| Wafer Fab Material Handler | Broadcom Inc. | Supply chain & procurement Mid level | USA-Pennsylvania-Breinigsville-9999 Hamilton Blvd | Open | |
| Wafer Fab Process Engineer | Broadcom Inc. | Manufacturing & production Mid level | Singapore-Depot Road | Open | |
| CMP/Plating/Wafer Bond Equipment Maintenance Technician (Night Shift) | Broadcom Inc. | Manufacturing & production Mid level | USA-Colorado-Fort Collins-4380 Ziegler Road | Open | |
| Chemical Mechanical Planarization (CMP) Process Engineer | Broadcom Inc. | Mechanical engineering Mid level | USA-Colorado-Fort Collins-4380 Ziegler Road | Open | |
| Senior/Staff Process Integration Engineer (Optoelectronics) | Broadcom Inc. | Process engineering (semiconductor / materials) Staff / principal | – | Open | |
| FBAR Process Integration Engineer | Broadcom Inc. | Process engineering (semiconductor / materials) Mid level | USA-Colorado-Fort Collins-4380 Ziegler Road | Open | |
| Supervisor II, Clean Room | Merit Medical Systems Inc | Other Manager | Tijuana, Mexico | Open | |
| Process Integration & Foundry Engineer | Allegro MicroSystems, Inc. | Process engineering (semiconductor / materials) Mid level | Minnesota, USA | Open | |
| Device and Process Integration Engineer | Texas Instruments Incorporated | Process engineering (semiconductor / materials) Mid level | Lehi, UT, United States | Open | |
| Photolithography Process Development Engineer (Advanced Patterning) | Texas Instruments Incorporated | Process engineering (semiconductor / materials) Mid level | Lehi, UT, United States | Open |