Wafer fab equipment
Front-end process, inspection and test equipment and materials for chip fabs.
Measures activity, not value. Not investment advice.
Open postings mentioning its keywords
What it follows
Keywords (13)
- Clean room
- CMP
- EUV lithography
- High-NA EUV
- Ion implantation
- Lithography
- plasma etch
- Process integration
- thin film deposition
- Wafer fab
- wafer inspection
- wafer metrology
- Yield enhancement
Companies
Companies behind it (30 days, every tracked company)
Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026; until then no percent is shown.
| Company | Open mentions | Change | New mentions |
|---|---|---|---|
| Skyworks Solutions Inc SWKS | 164 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| Amazon.Com Inc AMZN | 159 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 3 * |
| Space Exploration Technologies Corp. SPCX | 157 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 4 * |
| Micron Technology, Inc. MU | 154 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| Seagate Technology Holdings PLC STX | 139 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 7 * |
| AST SpaceMobile, Inc. ASTS | 57 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Onto Innovation ONTO picked | 50 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Veeco Instruments Inc VECO | 49 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 2 * |
| L3Harris Technologies, Inc. LHX | 40 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Modexus Solutions, Inc. MOD | 37 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Leonardo DRS, Inc. DRS | 36 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| SiTime SITM | 33 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| ON Semiconductor Corp ON | 33 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Advanced Energy Industries Inc AEIS | 30 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| TE Connectivity plc TEL | 28 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 4 * |
| Wolfspeed | 28 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Analog Devices ADI | 27 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Black Semiconductor | 27 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Cintas Corp CTAS | 26 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Celestica, Inc. CLS | 25 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 2 * |
| Rocket Lab Corporation RKLB | 24 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Texas Instruments Incorporated TXN | 24 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| T1 Energy Inc. TE | 22 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Lumentum LITE | 21 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| PDF Solutions Inc PDFS | 20 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| FormFactor FORM picked | 17 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Quantinuum Inc. QNT | 17 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| ABM Industries, Inc. ABM | 16 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Voyager Technologies, Inc. VOYG | 16 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Element Solutions Inc. ESI | 14 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Teradyne, Inc. TER | 14 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Ametek, Inc. AME | 13 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| PsiQuantum | 13 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Coherent Corp. COHR | 13 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Super Micro Computer, Inc. SMCI | 12 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Twist Bioscience Corporation TWST | 11 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 3 * |
| Cirrus Logic Inc CRUS | 11 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| OSI Systems Inc OSIS | 11 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| STMicroelectronics N.V. STM | 10 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| Lightmatter | 9 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 7 * |
| Commonwealth Fusion Systems | 9 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Mativ Holdings, Inc. MATV | 9 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Etched | 8 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| Axcelis Technologies picked | 8 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Colgate-Palmolive Company CL | 8 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Universal Display Corp OLED | 7 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| RTX Corporation RTX | 7 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Snowflake Inc. SNOW | 7 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Thermo Fisher Scientific, Inc. TMO | 7 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Cerebras Systems | 6 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 2 * |
Changes in hiring
None so far for this theme, its companies or its keywords. A company needs 14 days of tracking first.
Postings that mention its keywords (1,729, newest first)
| Title | Company | Role | Location | First seen | Status |
|---|---|---|---|---|---|
| Instrumentation & Controls Specialist | Valar Atomics | Controls & instrumentation Mid level | Orangeville, Utah, United States | Open | |
| Chemical Vapor Deposition Engineer (TRISO) | Valar Atomics | Process engineering (semiconductor / materials) Mid level | Orangeville, Utah, United States | Open | |
| Radioisotopes Production Specialist | TerraPower | Nuclear fission & fusion Mid level | Everett, WA | Open | |
| Quality Control Microbiologist | TerraPower | Test, quality & reliability Mid level | Everett, WA | Closed 21 Nov 2026 | |
| Project Manager | TerraPower | Program & project management Mid level | Everett, WA, USA | Open | |
| Manager, Quality Control Microbiology (TPI) | TerraPower | Test, quality & reliability Manager | Everett,WA | Open | |
| Manager, Integration & Facility Engineering | TerraPower | Facilities & construction Manager | Everett, WA | Open | |
| Staff Equipment Mechanical Design Engineer | Amperesand | Mechanical engineering Staff / principal | Reno, Nevada, United States | Open | |
| Senior NPI Technical Program Manager | Amperesand | Program & project management Senior | Reno, Nevada, United States | Open | |
| Staff Vehicle Manufacturing Engineer | Kodiak AI | Manufacturing & production Staff / principal | Mountain View, CA | Open | |
| Industrialization Engineer | Waymo | Manufacturing & production Mid level | Mountain View, CA, USA; Novi, MI, USA | Open | |
| Senior Motor Technology Development Engineer | Zipline | Hardware & electrical engineering Senior | South San Francisco, California, USA | Open | |
| Quality Engineer | Zipline | Test, quality & reliability Mid level | South San Francisco, California, USA | Open | |
| Production Manager of Manufacturing Operations | Zipline | Manufacturing & production Manager | South San Francisco, California, USA | Open | |
| Manager, Manufacturing Engineering | Apptronik | Manufacturing & production Manager | Austin, TX | Open | |
| Senior Manufacturing Engineer – Photonics Manufacturing & NPI | PsiQuantum | Manufacturing & production Senior | Milpitas, California | Open | |
| Senior Automation Engineer, Optical Packaging | PsiQuantum | Controls & instrumentation Senior | Milpitas, California | Open | |
| R&D Technician | PsiQuantum | Process engineering (semiconductor / materials) Mid level | New York | Open | |
| Production Technician | PsiQuantum | Manufacturing & production Mid level | Milpitas, California | Open | |
| Principal Power Systems Architect, Quantum Infrastructure | PsiQuantum | Electrical power & energy Staff / principal | Milpitas, California | Open | |
| Photonic Design Engineer | PsiQuantum | Mechanical engineering Mid level | Remote | Open | |
| Manager, Photonics Hardware Validation Engineering | PsiQuantum | Hardware & electrical engineering Manager | Milpitas, California | Open | |
| Engineering Resume Submission | PsiQuantum | General applications (not a specific job) Mid level | Palo Alto, California | Open | |
| Director Quality, Reliability & I/O | PsiQuantum | Test, quality & reliability Director | New York | Open | |
| Director of Facilities | PsiQuantum | Facilities & construction Director | Brisbane, Queensland, Australia | Open |