Wafer fab equipment
Front-end process, inspection and test equipment and materials for chip fabs.
Measures activity, not value. Not investment advice.
Open postings mentioning its keywords
What it follows
Keywords (13)
- Clean room
- CMP
- EUV lithography
- High-NA EUV
- Ion implantation
- Lithography
- plasma etch
- Process integration
- thin film deposition
- Wafer fab
- wafer inspection
- wafer metrology
- Yield enhancement
Companies
Companies behind it (30 days, every tracked company)
Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026; until then no percent is shown.
| Company | Open mentions | Change | New mentions |
|---|---|---|---|
| Skyworks Solutions Inc SWKS | 164 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| Amazon.Com Inc AMZN | 159 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 3 * |
| Space Exploration Technologies Corp. SPCX | 157 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 4 * |
| Micron Technology, Inc. MU | 154 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| Seagate Technology Holdings PLC STX | 139 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 7 * |
| AST SpaceMobile, Inc. ASTS | 57 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Onto Innovation ONTO picked | 50 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Veeco Instruments Inc VECO | 49 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 2 * |
| L3Harris Technologies, Inc. LHX | 40 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Modexus Solutions, Inc. MOD | 37 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Leonardo DRS, Inc. DRS | 36 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| SiTime SITM | 33 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| ON Semiconductor Corp ON | 33 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Advanced Energy Industries Inc AEIS | 30 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| TE Connectivity plc TEL | 28 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 4 * |
| Wolfspeed | 28 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Analog Devices ADI | 27 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Black Semiconductor | 27 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Cintas Corp CTAS | 26 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Celestica, Inc. CLS | 25 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 2 * |
| Rocket Lab Corporation RKLB | 24 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Texas Instruments Incorporated TXN | 24 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| T1 Energy Inc. TE | 22 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Lumentum LITE | 21 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| PDF Solutions Inc PDFS | 20 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| FormFactor FORM picked | 17 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Quantinuum Inc. QNT | 17 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| ABM Industries, Inc. ABM | 16 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Voyager Technologies, Inc. VOYG | 16 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Element Solutions Inc. ESI | 14 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Teradyne, Inc. TER | 14 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Ametek, Inc. AME | 13 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| PsiQuantum | 13 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Coherent Corp. COHR | 13 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Super Micro Computer, Inc. SMCI | 12 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Twist Bioscience Corporation TWST | 11 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 3 * |
| Cirrus Logic Inc CRUS | 11 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| OSI Systems Inc OSIS | 11 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| STMicroelectronics N.V. STM | 10 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| Lightmatter | 9 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 7 * |
| Commonwealth Fusion Systems | 9 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Mativ Holdings, Inc. MATV | 9 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Etched | 8 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| Axcelis Technologies picked | 8 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Colgate-Palmolive Company CL | 8 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Universal Display Corp OLED | 7 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| RTX Corporation RTX | 7 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Snowflake Inc. SNOW | 7 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Thermo Fisher Scientific, Inc. TMO | 7 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Cerebras Systems | 6 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 2 * |
Changes in hiring
None so far for this theme, its companies or its keywords. A company needs 14 days of tracking first.
Postings that mention its keywords (1,729, newest first)
| Title | Company | Role | Location | First seen | Status |
|---|---|---|---|---|---|
| Cryostat Equipment Engineer | PsiQuantum | Manufacturing & production Mid level | Milpitas, California | Open | |
| Staff /Sr Staff Laser Module & Systems Characterization Engineer | Lightmatter | Hardware & electrical engineering Staff / principal | Mountain View, CA | Open | |
| FP&A Manager, Supply Chain & Revenue | Lightmatter | Finance & accounting Manager | Mountain View, CA | Open | |
| Head of Product Development Engineering | Ethernovia | Product management Director | San Jose, CA | Open | |
| HOPP Production Operator | indie Semiconductor | Manufacturing & production Mid level | Schlieren, Switzerland | Open | |
| Test Development Engineer | 10040 | SiTime | Test, quality & reliability Mid level | California, Santa Clara | Open | |
| Sr. Test Engineer I 1515 | SiTime | Test, quality & reliability Senior | Bangalore | Open | |
| Sr. Test Engineer I 1335 | SiTime | Test, quality & reliability Senior | California, Santa Clara | Open | |
| Sr. Test Engineer | 1821 | SiTime | Test, quality & reliability Senior | Taipei; Taiwan | Open | |
| Sr. Principal Test Engineer | 1813 | SiTime | Test, quality & reliability Staff / principal | Arizona, Tempe | Open | |
| Sr. Test Engineer | 1794 | SiTime | Test, quality & reliability Senior | Arizona, Tempe | Open | |
| Sr. Staff Product Engineer | 1767 | SiTime | Software engineering Staff / principal | Arizona, Tempe | Open | |
| Sr. NPI Cost Analyst | 1585 | SiTime | Finance & accounting Senior | Taipei; Taiwan | Open | |
| Sr. MEMS Production Test Engineer | 1516 | SiTime | Test, quality & reliability Senior | United States | Open | |
| Sr. Engineer, Test Engineering | 1840 | SiTime | Test, quality & reliability Senior | Hsin-Chu; Taiwan | Open | |
| Sr. Engineer, Test Engineering | 1751 | SiTime | Test, quality & reliability Senior | California, Santa Clara | Open | |
| Sr. Engineer, MEMS Process | 1826 | SiTime | Software engineering Senior | Germany; Munich, Bavaria, Germany | Open | |
| Sr. Engineer, MEMS Assembly | 1799 | SiTime | Manufacturing & production Senior | Germany; Munich, Bavaria, Germany | Open | |
| Sr. Engineer, MEMS Assembly | 1798 | SiTime | Manufacturing & production Senior | Espoo; Finland | Open | |
| Sr. Engineer, MEMS Assembly | 1625 | SiTime | Manufacturing & production Senior | California, Santa Clara; United States | Open | |
| Sr. Engineer, MEMS | 1797 | SiTime | Software engineering Senior | Munich, Bavaria, Germany | Open | |
| Sr. Engineer, MEMS | 1796 | SiTime | Software engineering Senior | Espoo; Finland | Open | |
| Sr. Engineer, MEMS | 1498 | SiTime | Software engineering Senior | United States | Open | |
| Sr. Engineer, Customer Quality | 1789 | SiTime | Test, quality & reliability Senior | Taipei | Open | |
| Sr. Engineer, Customer Quality | 1772 | SiTime | Test, quality & reliability Senior | Japan; Tokyo | Open |