Wafer fab equipment
Front-end process, inspection and test equipment and materials for chip fabs.
Measures activity, not value. Not investment advice.
Open postings mentioning its keywords
What it follows
Keywords (13)
- Clean room
- CMP
- EUV lithography
- High-NA EUV
- Ion implantation
- Lithography
- plasma etch
- Process integration
- thin film deposition
- Wafer fab
- wafer inspection
- wafer metrology
- Yield enhancement
Companies
Companies behind it (30 days, every tracked company)
Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026; until then no percent is shown.
| Company | Open mentions | Change | New mentions |
|---|---|---|---|
| Skyworks Solutions Inc SWKS | 164 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| Amazon.Com Inc AMZN | 159 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 3 * |
| Space Exploration Technologies Corp. SPCX | 157 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 4 * |
| Micron Technology, Inc. MU | 154 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| Seagate Technology Holdings PLC STX | 139 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 7 * |
| AST SpaceMobile, Inc. ASTS | 57 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Onto Innovation ONTO picked | 50 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Veeco Instruments Inc VECO | 49 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 2 * |
| L3Harris Technologies, Inc. LHX | 40 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Modexus Solutions, Inc. MOD | 37 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Leonardo DRS, Inc. DRS | 36 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| SiTime SITM | 33 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| ON Semiconductor Corp ON | 33 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Advanced Energy Industries Inc AEIS | 30 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| TE Connectivity plc TEL | 28 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 4 * |
| Wolfspeed | 28 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Analog Devices ADI | 27 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Black Semiconductor | 27 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Cintas Corp CTAS | 26 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Celestica, Inc. CLS | 25 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 2 * |
| Rocket Lab Corporation RKLB | 24 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Texas Instruments Incorporated TXN | 24 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| T1 Energy Inc. TE | 22 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Lumentum LITE | 21 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| PDF Solutions Inc PDFS | 20 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| FormFactor FORM picked | 17 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Quantinuum Inc. QNT | 17 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| ABM Industries, Inc. ABM | 16 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Voyager Technologies, Inc. VOYG | 16 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Element Solutions Inc. ESI | 14 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Teradyne, Inc. TER | 14 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Ametek, Inc. AME | 13 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| PsiQuantum | 13 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Coherent Corp. COHR | 13 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Super Micro Computer, Inc. SMCI | 12 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Twist Bioscience Corporation TWST | 11 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 3 * |
| Cirrus Logic Inc CRUS | 11 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| OSI Systems Inc OSIS | 11 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| STMicroelectronics N.V. STM | 10 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| Lightmatter | 9 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 7 * |
| Commonwealth Fusion Systems | 9 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Mativ Holdings, Inc. MATV | 9 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Etched | 8 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 1 * |
| Axcelis Technologies picked | 8 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Colgate-Palmolive Company CL | 8 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Universal Display Corp OLED | 7 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| RTX Corporation RTX | 7 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Snowflake Inc. SNOW | 7 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Thermo Fisher Scientific, Inc. TMO | 7 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 0 * |
| Cerebras Systems | 6 | – (Tracking began 21 Nov 2026: the 30-day change shows from 21 Dec 2026) | 2 * |
Changes in hiring
None so far for this theme, its companies or its keywords. A company needs 14 days of tracking first.
Postings that mention its keywords (1,729, newest first)
| Title | Company | Role | Location | First seen | Status |
|---|---|---|---|---|---|
| Principal Product Engineer | 10048 | SiTime | Software engineering Staff / principal | California, Santa Clara | Open | |
| Principal Foundry Interface Engineer | 1803 | SiTime | Process engineering (semiconductor / materials) Staff / principal | California, Santa Clara | Open | |
| Principal Engineer, Customer Quality | 1473 | SiTime | Test, quality & reliability Staff / principal | California, Santa Clara | Open | |
| MEMS Process and Yield Engineer | 1466 | SiTime | Process engineering (semiconductor / materials) Mid level | California, Santa Clara | Open | |
| Sr. Software Engineer - Manufacturing Data & Test Infrastructure | Astera Labs | Software engineering Senior | San Jose, California, United States | Open | |
| Senior Sourcing Specialist – Germany Operations & Manufacturing | Astera Labs | Supply chain & procurement Senior | Aachen, North Rhine-Westphalia, Germany | Open | |
| Principal Supplier Quality Engineer /China | Astera Labs | Test, quality & reliability Staff / principal | Suzhou Qu, Gansu, China | Open | |
| Principal Product Technical Leader — AEC/SCM | Astera Labs | Hardware & electrical engineering Staff / principal | San Jose, California, United States | Open | |
| Principal DFT Engineer | Astera Labs | Chip design (ASIC / RTL / verification / physical design) Staff / principal | Toronto, Ontario, Canada | Open | |
| Director Engineering Operations | Astera Labs | Software engineering Director | Taipei, Taiwan | Open | |
| Staff Manufacturing Test Engineer | Graphcore | Manufacturing & production Staff / principal | Taipei, Taipei City, Taiwan | Open | |
| Staff Manufacturing Test Engineer | Graphcore | Manufacturing & production Staff / principal | Austin, Texas, United States | Open | |
| Test Engineer, System-Level Test (SLT) | Tenstorrent | Test, quality & reliability Mid level | Austin, Texas, United States; Fort Collins, Colorado, United States; Santa Clara, California, United States | Open | |
| Sr. Engineer, Mechanical (Tooling Manager) | Tenstorrent | Mechanical engineering Manager | 新北市, New Taipei City, Taiwan | Open | |
| Global Supply Chain Manager, OSAT | Tenstorrent | Supply chain & procurement Manager | Austin, Texas, United States; Santa Clara, California, United States; Toronto, Ontario, Canada | Open | |
| Global Supply Chain Manager, OSAT | Tenstorrent | Supply chain & procurement Manager | 新北市, New Taipei City, Taiwan | Open | |
| ATE Test Development Engineer | Tenstorrent | Test, quality & reliability Mid level | Austin, Texas, United States; Fort Collins, Colorado, United States; Santa Clara, California, United States | Open | |
| Principal Product Engineer | SambaNova Systems | Software engineering Staff / principal | San Jose, California, United States | Open | |
| Principal DFT Engineer | SambaNova Systems | Chip design (ASIC / RTL / verification / physical design) Staff / principal | Austin, Texas, United States; San Jose, California, United States | Open | |
| Facilities Manager, Production | 1647 | SiTime | Facilities & construction Manager | United States | Open | |
| Associate Test Development Engineer | 1775 | SiTime | Test, quality & reliability Entry level | Ipoh | Open | |
| Facilities Command Center, Manager | CoreWeave | Facilities & construction Manager | Kenilworth, NJ | Open | |
| Materials Engineer | Atomic Machines | Process engineering (semiconductor / materials) Mid level | Emeryville, California | Open | |
| Incoming Quality Inspector (6:00am-2:30pm) | Atomic Machines | Test, quality & reliability Mid level | Emeryville, or Santa Clara, California | Open | |
| Incoming Quality Inspector (2:15pm-10:45pm) | Atomic Machines | Test, quality & reliability Mid level | Emeryville, California | Open |